- Pre-commencement of development contaminated land conditions had been imposed on the development in August 2019 under the Environmental Protection Act to protect workers on site and residents from exposure to contamination. None of these contaminated land conditions had been discharged.
- No development, including demolition and site clearance, could take place until the contamination, including asbestos, had been assessed and the contamination had been removed (remediated). Section 55 of the Town and Country Planning Act defines demolition as development.
- It is the responsibility of
developers to begin the process of discharging these contaminated land conditions
through the planning system. This is a
lengthy and expensive process involving employing consultants to prepare
reports identifying contamination and how that contamination is to be dealt
with and suitably qualified contractors to remove contamination safely and
dispose of that contamination legally. These reports must be submitted to the council for their agreement and
then discharged in sequence by way of planning applications.
- The contaminated land conditions did not allow demolition but if
demolition were to be allowed there is a legal process to be followed under the
Building Act 1984, Section 80 (developers) and Section 81 (the council). (See demolition procedures required by Sefton Council and HSE.) The developers have a legal duty to
undertake a pre-demolition asbestos survey (see HSE demolition requirements). A pre-demolition asbestos survey had not been undertaken on
31st January and had still not been undertaken on 20th February (when a second HSE inspector visited the site and identified various contraventions) and yet the
buildings had been allowed by Sefton Council and HSE officers to be unlawfully
demolished with the asbestos in situ.
- On Thursday, 30th
January 2020, residents had observed a young man on site removing the doors from the
buildings and taking out some of the contents – fires, boilers, boiler parts,
various flue parts, baths. Insulation material, plastic tanks, metal and
plastic drums some of which were made of asbestos and some of which contained
asbestos material and other contaminants which had not been identified. This is what the second HSE Inspector alleged was fly-tipped waste.
- On Friday, 31st
January 2020 unlawful demolition commenced.
Residents observed the same young
man smashing down with a sledgehammer
the asbestos roofs and the fabric of the buildings simultaneously which
is unlawful.
- Contamination must be removed safely and legally before demolition can be contemplated. Pieces of asbestos were flying off the roofs and going everywhere. Residents and their councillors complained immediately to Sefton Council and HSE officers because residents and the general public were being exposed to contamination and residents were fearful for their safety and for the safety of their children.
- The developers had not attempted to discharge the pre-commencement of development contaminated land conditions. They had not undertaken a pre-demolition asbestos survey and method statement and had not submitted a notice of intended demolition as required under Section 80 of the Building Act. They had also failed to register the site with HSE (Form F10) under the Construction Design and Management Regulations which is a legal requirement.
- The young man was working on site
unsupervised and not wearing clothing to protect him from contamination,
including a mask. His clothing was
covered in asbestos/demolition dust.
There was no scaffolding, no welfare facilities, no water on site to
dampen down, and there were no demolition or asbestos signs in place, all of
which are legal requirements.
- When residents and their
Councillor questioned this young man he told them he was employed by a
Recruitment Agency. He was unaware
that asbestos was involved and said he had been told that it was only
cement. He was being exploited and
exposed to contamination as well as exposing residents to contamination. He was unqualified and inexperienced in this
type of work and should never have been put into such a dangerous
situation. Residents and their
Councillor told him what he was doing was unlawful. He was contaminating himself as well as residents.
When he realised the full implications of his actions, he left the site
immediately, locking the site gates behind him.
- The developers alleged on Monday, 3rd February 2020 that “gypsies” had taken over the site
and were responsible for the site’s dangerous condition. They were using this
fabricated story of gypsies/travellers to avoid investigation and
prosecution. We have photographs of this
young man and witnesses to disprove this story of gypsies/travellers. We have
also made a FOI enquiry to Merseyside Police who confirm they have
conducted an incident search on Saville Road and there is no reference of
travellers in their logs. This information has been given to HSE,
together with contact details of one of the witnesses but to date HSE have
failed to make contact with witnesses or ask for their photographs and
statements. Instead of investigating and pursuing the guilty
parties, HSE are purposely dismissing residents’ claims.
- On 31st January 2020 about
one-third of the buildings were down and the site was littered with asbestos
debris and building rubbish, such as blocks and bricks mixed with the contents
of the buildings which had been removed the previous day. The remaining buildings were structurally dangerous. A straightforward process of removing
contamination before demolishing the buildings through the legal process had
become an environmental catastrophe which a Sefton Council Officer had warned against in a report to planning committee in August 2019 if asbestos was not dealt with correctly. Suitably qualified contractors who had experience of handling such a
serious contamination incident should have been brought in. Developers had chosen the cheapest and most dangerous way to demolish the building without following any legislation imposed on them and in so doing have exposed a community and a young man to life threatening contamination.
- Upon receiving complaints, it was
the legal duty of Sefton Council and HSE officers to react immediately. Unlawful demolition should have been halted
and the site made safe to protect residents and the general public. If Sefton Council and HSE officers had visited the site on 31st
January 2020 in working hours they would have witnessed first -hand
the exploitation of this young man and the appalling dangerous condition
of the site and would have had to investigate what they had seen. Instead of taking control of the situation, Sefton Council Officers redirected complainants to HSE and advised Sefton Council's Building Control would be issuing a retrospective demolition notice and a Building Control Officer would be visiting the site on the following Monday. By not reacting to
residents’ complaints and not enforcing legislation imposed on Sefton Council
and HSE officers, these public servants have become complicit in contravening
legislation and exposing a community to contamination.
- We have an email dated 5th
February 2020 from HSE who had not been in contact with complainants and were now refusing to comply with their legal responsibilities and passing us back to
Sefton Council who had directed us to HSE on 31st January 2020. This is
contrary to a letter dated 4th March 2020 where HSE allege one of their
inspectors visited the site very late on the Friday afternoon when the site was
locked up. He was able to see that
demolition work had taken place and was concerned about the structural stability
of the remaining buildings but he did not attempt to stop the site or contact
complainants for their statements or their photographs.
- On Monday, 3rd February 2020 residents contacted their councillors again because unlawful work had resumed on site with two different men. Sefton Council officers had not come out on to site to answer the residents' serious complaint about exposure to contamination. High winds over the weekend had aggravated the situation still further, with building debris including asbestos being blown everywhere contaminating a wider area. Fibres had also been released into the air when the asbestos debris had been broken up. These fibres were too small to see with the naked eye but are lethal if inhaled. Residents were being further contaminated and the site was now in a very dangerous condition and needed to be made safe. About one-third of the buildings had been smashed down with the asbestos still in situ and the remaining buildings were structurally dangerous with pieces of asbestos roofing hanging off the roofs (this is confirmed in a letter from HSE' dated 4th March 2020 which alleges one of their Inspector's visited the site on 31st January when he could see that demolition had taken place and was concerned about the structural stability of the remaining buildings. The Inspector must have visited the site after the young man had locked the gate because the Inspector commented that the site was secure ). Why didn't the HSE Inspector take enforcement action?
- The ward councillor telephoned Sefton Council’s planning department and a planning enforcement officer. When it was apparent that no-one from Sefton Council would be coming out, the ward councillor also telephoned the Police. The Police arrived at the same time as Sefton Council’s planning enforcement officer. He had obviously been forced to come out because the ward councillor had contacted the Police. Between Friday and Monday the developers had concocted a story about gypsies/travellers and the 2 workmen on site were now alleging that they were only tidying up after “gypsies” had occupied the site. The planning enforcement officer was going along with this fabricated story and ignoring residents' and councillors' pleas to stop the site and make it safe. He also alleged that there were no powers under planning legislation which can enforce against the unauthorised removal of asbestos from buildings. He was misleading everyone present, including the Police. The site was in a very dangerous condition and needed to be made safe and residents were being exposed to contamination. This was more than unauthorised removal of asbestos, it was deliberate unlawful demolition with the asbestos roofs and the fabric of the buildings being smashed down simultaneously. He was also stating the pre-commencement of development contaminated land conditions only covered below-ground contamination when contaminated land conditions prevented any development including demolition and site clearance from being undertaken until contamination had been identified and removed.
The planning enforcement officer knew there was no legal documentation i.e. a pre-demolition asbestos survey, a method statement, an intended demolition notice to permit lawful demolition and that the pre-commencement of development contaminated land conditions had not been discharged but he did not stop the site and make it safe. He allowed the site to continue with the same developers and in the same manner with the asbestos roofs and the fabric of the buildings being smashed down simultaneously. Residents were being exposed to contamination. The site needed to be made safe. Everything onsite was now contaminated and suitably qualified specialists should have been brought in who could handle such an environmental catastrophe. At this stage it was irrelevant who was responsible for the damage. An investigation would have revealed who was responsible but this never took place.
- These photographs taken on the 3rd and 10th February 2020 show that the buildings have been smashed down with the asbestos still on the building. The photograph of 3rd February 2020 shows contaminative material inside the garage building ie old boilers, old fires asbestos flues etc. Note the close proximity to residents rear gardens and children's play areas.
- On 6th February 2020,
Sefton Council’s building control department issued their retrospective notice
of intended demolition without a pre-demolition asbestos survey or a method statement,
which are legal requirements for the developers
to submit to the council prior to demolition (see information sheet from Sefton Council included with notice of intended demolition) for the council to establish that
can demolition can be undertaken safely. By now approximately
half the buildings were down and the remaining buildings were still being
knocked down unlawfully with the asbestos and other contaminants still in and
on them in a reckless dangerous manner. Residents’ photographs prove that further unlawful work had continued
from 3rd February 2020 onwards.
- How could a local authority who had a legal duty to protect residents from unlawful work issue a retrospective document, giving developers a green light to continue their reckless dangerous behaviour? This was a contaminated site and none of the pre-commencement of development contaminated land conditions under Part IIA of the Environmental Protection Act had been discharged to permit any development to take place. Section 55 of the Town and Country Planning Act defines “demolition” as “development”.
Unlawful work continued on site in the same reckless dangerous manner with the asbestos roofs and the fabric of the buildings being smashed down simultaneously and with the same developers involved until all the buildings were down. A pre-demolition asbestos survey had still not been undertaken. Blocks and bricks were being thrown on top of the asbestos debris further damaging and crushing it. There were still no welfare facilities and no means of dampening down, no scaffolding, no asbestos or demolition signs in place. The workmen were observed going into the local shops and a café wearing their work clothes covered in demolition/asbestos dust which they would be taking home with them, contaminating a much wider community.
- Residents and their councillors
continued to complain to the Chief Executives of both Sefton Council and HSE
but requests to stop the site and make it safe were ignored. On 5th
February 2020, 8 cross party councillors submitted a written complaint to HSE’s Chief
Executive. Complainants were being
passed backwards and forwards between HSE and Sefton Council. These are stalling tactics to allow unlawful
demolition /development to continue.
- We have a letter dated 4th
March 2020 from HSE in reply to our complaint to the Chief Executive. We attach a copy of residents' reply.
- HSE allege one of their officers visited the site on a number of
occasions but
his visits were after normal working hours and he failed to make contact with
any of the complainants. Around 10th February 2020 he met one of the developers on site. The Inspector found there had been no demolition asbestos survey and
there were issues with the way the clean-up work had taken place. We presume the Inspector is referring to the asbestos debris littered all over the site which residents' photographs confirm. He also
established that there was no welfare on site.
- The Inspector had witnessed the
progress of this unlawful work on various dates from 31st January 2020 onwards. By now three-quarters of the
buildings were down. The other quarter
of the buildings still had asbestos on them and he had said the structures were
dangerous. The site was littered with
the contents of the buildings and building debris (including asbestos). He had now established there was no pre-demolition asbestos
survey and must have known there was no CDM in place which is a legal
requirement. Why was he allowing
unlawful demolition to continue, not stopping the site and making it safe when residents and the general public were being contaminated?
- Also on 10th February and again on 11th February 2020 a Sefton Council Environmental Enforcement Officer visited the site and attached is a copy of his report to our MP (click to see report) which contains many comments which are untrue and conflicts with residents’ photographs taken on a daily basis and the HSE Inspector’s observations. This is an officer employed to protect residents and enforce the laws imposed on this site. He was actually condoning the developers’ unlawful activities and enabling them to continue contaminating a community.
Around this time the site was in its worst condition. Three-quarters of the buildings had already been smashed down with the asbestos still on them and the officer could see that the remaining quarter were structurally dangerous with unsupported pieces of asbestos debris hanging down from the roofs. The site was littered with asbestos debris mixed with blocks and bricks and the contents of the garages.
- The
officer was misleading the MP and residents and implying that correct
procedures were being undertaken. He was well aware but had failed to mention that none of the pre-commencement
of development contaminated land conditions imposed on the site under Part IIA
of the Environmental Protection Act had been discharged. No development/demolition could take place
until all contamination, including asbestos, had been assessed and removed
safely and legally. This is an officer
employed to protect residents and enforce the laws imposed on this site. He was actually condoning the developers’
unlawful activities and enabling them to continue contaminating a community He was protecting Sefton Council and himself
from prosecution and misleading the MP and residents. This officer has a history of misleading
residents who complain about being exposed to contamination. He says Sefton Council officers have
contacted HSE but they can’t guarantee HSE will visit the site, We now
know that a HSE officer had already visited the site and was concerned about
the structural stability of the buildings.
He had also spoken with a Sefton Council building control officer and
informed him that HSE would be taking a lead in terms of any potential asbestos
contamination
- The environmental enforcement officer also says his department was not sure if asbestos was involved which again was untrue. Sefton Council officers were well aware that asbestos was present. The Environmental Health Manager from this officer’s own department in his comments to planning committee in August 2019 had stressed that appropriate investigation and mitigation was required including an asbestos survey to ensure no ground contamination occurs during the demolition process.
- We have had a report undertaken by asbestos specialists which confirms the presence of asbestos and also details all the contraventions of the Control of Asbestos Regulations on this site.
Why did the Enforcement Officer allow
unlawful demolition to proceed in view of the appalling dangerous condition of
the site? Click here for Liverpool Echo article 19th of Feb.
- From 31st January 2020 Sefton Council and HSE officers had been responsible for allowing unlawful demolition to proceed in a very dangerous manner and for residents to be exposed to contamination for 10 days. Now this officer was allowing unlawful demolition to continue without any assessments of contamination in or on the garage buildings and without any documentation in place, including a pre-demolition asbestos survey and for a community to be contaminated. He was also well aware that no work should have been taking place because none of the contaminated land conditions under Part IIA of the Environmental Protection Act had been discharged. Throughout this time residents and their councillors were continually asking Sefton Council and HSE Chief Executives to stop the site and make it safe because residents were being exposed to contamination and were fearful for their lives and the lives of their children.
A photograph taken on 16th of February 2020 after several visits from Sefton Council Officers and a HSE Officer shows damaged split asbestos debris on site which will have released many fibres too small to be seen by the naked eye. These fibres are lethal if inhaled. Why was a full asbestos roofing sheet (of which there were many on site) allowed to be so badly damaged on this contaminated site?
- It was not until 20th February 2020 (10 days after the first Inspector’s
visit) when the remaining buildings had all been demolished with the asbestos
in situ, that a second HSE Inspector visited the site. HSE allege the first inspector was not available! The second Inspector reviewed all the concerns and the proposed
enforcement actions. This Inspector had given the developers time to complete unlawful
demolition and remove some of the contaminated material from site in skips. On 20th February 2020 residents' photographs show the site in an appalling
condition and this Inspector would have seen this. Contaminated rubbish was still strewn over
the site mixed with building rubbish, including blocks and bricks and a
considerable amount of asbestos debris in various sizes mixed amongst this
rubbish. Wrapped and taped asbestos lay
on the ground, too big and too heavy to be loaded into the skip. A later video dated 17th March 2020 shows how this asbestos was man-handled into the skips. The Inspector ignored the dangerous condition of the site with asbestos strewn
everywhere.
This second Inspector had already reviewed the first Inspector's report and confirmed that there was no pre-demolition asbestos survey and the developers had not complied with the Construction Design and Management Regulations. The Inspector served an Improvement Notice for an asbestos assessment and a plan of work for the remaining clearance work and a Notice of Contravention for compliance with the Construction Design and Management Regulations. The developer agreed to stop work until he had carried out an asbestos survey.
Immediately after the site visit the HSE Inspector rang one of the ward councillors to advise that the site was being stopped but the inspector was allowing the developers to remove blocks and bricks from site. Residents photographs and a video prove these blocks and bricks contaminated with asbestos debris and the contaminative contents of the garage buildings were picked up in an open truck with grabbers parked in Saville Road (a public road). As the grabbers swung backwards and forwards over the site fencing to pick up the contaminated material and then drop it into the open truck contaminated dust was being created from their actions. Bits of building material and asbestos debris were falling from the grabbers into Saville Road. This was happening repeatedly over a period of time.
The developers had been allowed over a 3 week period to start, progress and complete unlawful demolition and now a HSE inspector was allowing these same developers who had created this dangerous situation to clear this contaminated site and continue working. What exactly was the Inspector stopping? The Inspector had not issued an official stop notice which would result in prosecution proceedings and had not brought in specialists to assess the contamination before any workers were allowed to clear this contaminated site. Meanwhile a community was being further exposed to contamination. There was obviously no intention of issuing an official stop notice to protect the community and taking prosecution proceedings when the inspector was allowing developers to clear the contaminated evidence from site. Residents health and safety was being sacrificed so that the cover-up could continue. The site still remained in a dangerous condition after the 20th of February 2020 because HSE were determined to continue the cover-up.
- From 20th February 2020 onwards the developers continued to remove building debris and asbestos from
site with the full knowledge of both HSE and Sefton Council. Residents’ photographs taken on 23rd
February 2020 show asbestos not bagged and littered over the site which the second
HSE inspector had overlooked. There is
also a black bag full of pieces of corrugated asbestos sheeting from the roofs
and other asbestos roofing parts.
- On 24th March 2020 the ward
councillor received an email from the second HSE inspector asking “which of your constituents I should contact
for details of the young man allegedly smashing the asbestos, including his
employer details and copies of the documents which confirm the presence of
asbestos in the guttering fascia and ridge of the garages.”
- Details were supplied to the
Inspector but to date no contact has been made with the resident concerned for
his evidence and photographs.
- If HSE had undertaken a thorough
investigation, as is expected of a national safety body, this information would
already be in their possession and residents exposure to asbestos would have
been limited to 31st January 2020.
This site still has not been made safe.
- A young couple with 3 young children living adjacent to the site have
sought advice from their doctor’s practice and the incident has been recorded
on the doctor’s records. When asbestos
is broken up it is very dangerous and releases fibres which cannot be seen by
the naked eye. These are the fibres
which do the damage when they get into people’s lungs (click here to see HSE leaflet "Why Asbestos is Dangerous").
- The developers had not complied with any legislation imposed on them but were allowed by HSE and Sefton Council officers over a three-week period to start, progress and complete unlawful demolition on a contaminated site in a reckless dangerous manner with asbestos still on and in the buildings after numerous complaints by residents and their councillors. Under the Freedom of Information Act we asked on the 27th of April 2020 for HSE inspectors’ reports and all correspondence relating to this site which HSE refused to give us, saying it was not in the public interest to do so and they were still investigating the incident at Saville Road. It is in the public interest when the public have been exposed to contamination and HSE could and should have stopped the site and prosecuted those involved when they had a legal duty to do so.
- We challenged this decision to withhold the FOI information and HSE then undertook an internal review which has been going on since May 2020 and we have still not received the outcome of this review or more importantly all the information requested, despite numerous prompts to HSE on 6th and 29th July 2020 and again on 12th October 2020. See FOI request and complaint correspondence to HSE.
- We contacted the Information Commissioner (ICO) on 9th November 2020 in an attempt to obtain this information. On 30th November 2020 the Information Commissioner wrote to HSE giving them a deadline of 10 working days to respond to us with the outcome of the internal review. In a letter to us on 30th November 2020 ICO state that they have now closed the case. On 17th December 2020 we asked ICO to keep the case open and seek all the information we have requested. Why did ICO close the case when HSE had not responded to the deadline given by ICO? ICO replied to us on 17th December 2020 that there is a waiting time of approximately 4 months for our case to be allocated to a case officer. In June 2021 (6 months later) an ICO case officer made contact with us and re-opened the case. We were advised it would be late July 2021 before ICO were able to progress our complaint further. Why is it taking so long for ICO to insist HSE provide us with information to which residents and councillors have a right?
- We understand HSE now allege they have undertaken an investigation into the incident at Saville Road which was concluded in August 2020. They say a prosecution report was submitted but was not approved as the evidence secured was not sufficient to meet the evidential test required by the Code for Crown Prosecutors. There is multitude of evidence that these developers have not complied with any legislation imposed on them, namely the Health and Safety at Work Act, The Control of Asbestos Regulations, demolition procedures under the Building Act, Part IIA of the Environmental Protection Act, HSE Construction Design and Management Regulations. Residents also commissioned a report undertaken by asbestos consultants which details the many contraventions of The Control of Asbestos Regulations. These environmental crimes carry heavy fines and/or imprisonment but these developers were confident that they would not face prosecution. Residents also have many photographs which show the progress of this unlawful demolition from 31st January 2020 until its conclusion, with asbestos debris littered all over the site. How can HSE conduct an investigation when they have not contacted any of the witnesses (residents and councillors) for their statements and photographic evidence which would condemn not only the developers but also Sefton Council and HSE officers? We have even contacted HSE offering to provide such evidence to them but HSE, as an investigative body, have not come back to us.
- On the 9th of August 2021 we recieved a letter from HSE enclosing some of the information we requested, but the Inspector's Reports and the report into the internal review are being purposely withheld without any justification. We have contacted ICO once again asking them to obtain all information requested which is in the public interest and to which we have a legal right.
- We are being sent around in circles once more. We know HSE are unable to give us the various reports and information requested because this information will also condemn them but expect ICO to insist HSE provide us with information we have a right to access. No-one is above the laws of our land yet HSE have allowed developers to continue working unlawfully on a contaminated site and thereby exposing workers on site and a community to contamination. After receiving numerous complaints from residents and their councillors, HSE could and should have stopped this site at any time. It was their legal duty to do so. HSE officers are public servants employed to protect communities and they should be accountable and transparent.
- HSE have already forced us through their complaints procedure without providing us with relevant information to which we have a right under the Freedom of Information Act. They are now trying to force us to the Ombudsman. See this link which shows the public's perception of the Ombudsman. This issue needs to be taken out of HSE’s hands and dealt with by an independent impartial safety body. People’s lives are involved here and these unlawful practices must be stopped. The culprits are HSE and Sefton Council officers as well as the developers. This is beyond the scope of the Ombudsman.
- One of our Councillors has also
asked Sefton Council for copies of full reports relating to the various site
visits undertaken by their officers. To
date we have only received edited extracts of what Sefton Council officers want
us to see.
- We are asking for an independent
body to conduct an investigation into the conduct of Sefton Council officers
and HSE inspectors.
Reasons why this site should have been stopped on 31st
January 2020
Residents were being exposed to asbestos and other unidentified contaminants and the developers had failed to comply with:-
Environmental Protection Act 1990 – Pre-commencement of development contaminated land conditions under the Environmental Protection Act 1990 imposed on the development in August 2019 to protect workers on site and residents from exposure to contamination. It is the responsibility of the developers to discharge these contaminated land conditions through the planning process and Sefton Council, as the regulators, to enforce these contaminated land conditions.
Demolition procedures under the Building Act 1984 (Section 80 –
developers and Section 81 – Sefton Council)
Health and Safety at work Act 1984
Control of Asbestos Regulations 2012
Regulation 5 – Identification of the presence of asbestos
Regulation 6 – Assessment of work which exposes employees to asbestos
Regulation 7 – Plans of work
Regulation 11 – Prevention or reduction of exposure to asbestos
Regulation 14 – Provision and cleaning of protective clothing
Regulation 16 – Duty to prevent or reduce the spread of asbestos
Regulation 18 – Designated areas
Regulation 24 – Storage, distribution and labelling of raw asbestos and asbestos waste
Regulation 27 – Labelling of products containing asbestos
HSE Construction Design and Management Regulations (CDM) – A project must be registered with HSE before demolition/development commences. The project manager will be responsible for planning, managing, monitoring and co-ordinating health and safety issues in the pre-construction phase (i.e. before demolition starts).