Tuesday, 31 August 2021

Illegal Waste Site Formby

 Retrospective Planning Applications DC/2020/0098 and DC/2020/02197


This site (in the green belt and on a flood plain) had been heavily promoted by Sefton Council officers for inclusion in their Local Plan as an employment site.  At the public Inquiry into the Local Plan in 2015 this land was the subject of a protracted argument with Formby Parish Council and Formby Residents’ Action Group fiercely defending the destruction of agricultural land/green belt which resulted in the Government Inspector determining that this site should not included in the Local Plan for development and thus retain its green belt status.  The land was also subsequently not included in Formby’s Neighbourhood Plan.

For over 12 months the site was allowed to operate unlawfully by Sefton Council officers (after complaints from both Formby Parish Council and 2 Independent ward councillors) without planning permission and without an environmental permit licence on green belt land on a flood plain without any consideration of the effects on the general public and workers on site who were being exposed to contamination as well as groundwater contamination and destruction of wildlife.  An illegal tip was being run adjacent to football fields used regularly by local clubs, a recycling centre used by a constant stream of residents, as well as a Tesco superstore and a number of other commercial premises, including a cycle store.  There are also a number of housing estates close by.  

Sefton Council officers could and should have stopped this site when 2 Independent ward councillors and Formby Parish Council first complained that a community was being exposed to contamination.  Officers were more intent on keeping the site going and forcing through a planning application which was against the local plan, the neighbourhood plan and the joint waste management plan to enable the site’s operators to continue.

Hazardous waste (said to have originated from construction/demolition and roadworks) was being dumped without any legal procedures being followed concerning the carriage of waste/hazardous waste such as consignment notes showing its origin and no testing to identify contaminatives within this waste had been carried out.   This hazardous waste was being crushed on site and then sold on as aggregates contaminating a wider area.  This waste could have come from contaminated sites such as the ones described in our Blog. The operators claimed at first that the works were in line with an old planning application and then in relation to drainage works for a company who wanted to store equipment on site associated with an application in the pipeline for a new clubhouse and community hub.  Sefton Council officers were well aware of the developers’ real intentions for this site but relayed these fabricated excuses to Formby Parish Council to enable the developers to continue working unlawfully on site.   

The Environment Agency avoided their legal responsibilities in protecting residents and our environment.  They were aware that this site was operating unlawfully because in July 2020 Sefton’s Drainage Manager had contacted the Environment Agency concerning water contamination when the Environment Agency had confirmed that the activity was not licensed and that they had referred the matter on to the relevant team for investigation.  These were serious environmental crimes which needed to be stopped and investigated immediately.  If they weren’t prepared to do their legal duty who else could do it?.  The Environment Agency had also commented on 2 separate retrospective planning applications – in August 2020 and January 2021.  The Environment Agency knew these applications were retrospective and should have taken a lead when they knew waste was being dumped unlawfully.

Unlawful work was allowed to continue on this site for nearly 12 months and.it was not until 5th February 2021 that an Environment Agency officer visited the site accompanied by Sefton Council officers after  Formby Parish Council had taken the initiative bypassing Sefton Council officers.  The Parish Council had complained to the Environment Agency in relation to dust escaping off site and the activity not being authorised and had submitted photographs of the illegal waste site.  The report on the site visit is damning for all concerned - Environment Agency, Sefton Council officers and developers.  .Despite the evidence in this report of 5th February 2021, the site was allowed to continue operating unlawfully.  

Here is the link to this Environment Agency report and the following are extracts from it:-

“At the start of the inspection we were informed there was no waste on site, this was clearly not the case and over 4,000 tonnes of construction and demolition waste EWC 170107 and with the absence of any testing for contaminants this could also be considered as hazardous under EWC code 170106*.

Other distinctive waste piles could be seen including waste containing soil and stone EWC code 170504 again no testing had been carried out on this waste and could also be considered hazardous waste under EWC code 170503*.

All waste was said to have originated from construction/demolition and roadworks

As all waste was being treated on site prior to export without any sufficient waste acceptance criteria (WAC) testing the material produced would still be considered waste.  The treatment consisted of the mechanical treatment (e.g. .sorting, crushing, compaction) therefore this would change the waste code to chapter 19 under either EWC code 191209, 191211* or 191212.” 

"Location of site

The site shares a boundary next to a recreational football pitch with no fencing, screening or netting to prevent dust and debris from blowing onto the pitch or impacting on people using the facility.  It is understood the predominant wind direction is Westerly/South Westerly which would increase the likelihood of dust blowing off site onto the football pitch and any spectators.

As no testing has taken place of the waste to demonstrate it does not contain any harmful substances and there is a lack of any appropriate measures or procedures to contain any waste, we currently feel this has the potential to cause a risk to human health and contamination off site".

"Site Infrastructure

The site had no sealed surface or known drainage system.  The site comprised of a hardstanding area with no concrete pad, furthermore the waste piles were not contained in bays and kept in distinctive piles to keep track of where each pile had come from.

No dust suppression equipment was found on site and site fencing was lacking in the area storing waste allowing unrestricted access from the fields to the rear of the site.

Observations on the day found that the areas directly around the waste piles had standing water and it was not clear if this could escape off site.”

“Application for Authorisation (Environmental Permit)

The company explained they were looking at applying for a standard rule permit, it was unclear on the status of this and a request had been made to clarify the type of permit and what stage this may be at. 

An application for an Environmental Permit would take 3 months from submitting an application, if all the correct paperwork, fees and suitability is met but in the meantime the site would not be allowed to retrospectively operate and a stop and clear letter will be sent separate to this report.” 

On 11th February 2021 in an email to the ward councillor, the head of planning confirmed that the Environment Agency had not yet issued a stop and clear notice but this was imminent. and it would be served on the businesses using the site.  

When work was still continuing on site, heaps of hazardous waste were growing bigger by the day and Formby Parish Council had not received a reply from the Environment Agency to their complaint, Formby Parish Council submitted a Freedom of Information request to the Environment Agency.  The Environment Agency denied that a stop and clear notice had been issued, only a stop and clear warning letter had been sent out.  These environmental crimes carry heavy fines and/or imprisonment but the operators were so confident that they would not face prosecution that they ignored the Environment Agency’s warning letter and continued working on site.  Not having a licence alone is a prosecutable offence.

The Environment Agency had already gone against their intention to issue a stop and clear notice – an intention which is clearly documented by a Sefton Council Environmental Health Officer who had accompanied Environment Agency Officers on their site visit on 5th February 2021.  This officer’s comments on the second planning application were based on this site visit.   

Unknown to Formby Parish Council and residents who had complained, the Environment Agency then did a complete U-turn and issued a licence to these operators who were committing these environmental crimes.  (The issue of this licence was confirmed in an email from the Head of Planning to the ward councillor on 16th March 2021).  The Environment Agency had in effect retracted their intention to pursue prosecutions with a stop and clear notice to enable them to issue a licence to allow developers to continue working unlawfully on site.  You can’t ask developers to stop and clear a site with a letter, object to a planning application for this site which Sefton Council officers were trying to force through and then issue a licence for operators to continue against all the constraints of this site which is what the Environment Agency have done.

Those who are employed to protect the environment and the general public are actively encouraging and are complicit  in environmental crimes.  Complainants (in this case Formby Parish Council who were trying to protect their environment and their community from contamination) should not be treated with such contempt  and excluded from discussions on protecting their environment and the safety of their residents. 

The Environment Agency’s actions on this site mirror what happened in 2005 when 44,000 cubic metres of hazardous waste, including white, brown and blue asbestos was being dumped on a nature reserve in Scarisbrick, Lancashire by the owner of a waste transfer station and the Environment Agency alleged the offender “bends the rules” (http://news.bbc.co.uk/1/hi/magazine/4457663.stm).   This is much more than bending rules.  These are environmental crimes seriously affecting people's health.  If this individual had been prosecuted  in 2005 (as the law states) this would have been a deterrent not only to him but others.  He was caught once again in 2013 by residents exposing a community to contamination (including asbestos) with unlawful demolition and unlawful removal of hazardous waste from a contaminated site when legislation did not permit this. Now in 2021 instead of stopping the site, making it safe and prosecuting those involved in environmental crimes, the Environment Agency have issued a licence which will allow these same individuals to continue contaminating the general public.  See Permit on Environment Agency Public Register.

Formal complaint

On 9th June 2020 Formby Parish Council made a formal complaint to Sefton Council’s Monitoring Officer regarding a breach of planning and Sefton Planning department failure to prevent this.  The Parish Council were concerned that work was still proceeding on the site (a number of photographs were included to prove this allegation) and wanted to see this unlawful development halted and immediate action taken to ensure the site was returned to previously undeveloped land within the green belt. A further company Mersey Aggregates are now advertising their presence on this site. (facebook adverts?)  The land, which is in a flood plain, has been re-profiled without any consultation with or approval from the Environment Agency. We cannot accept that unauthorised development within a flood plain can be construed as of no potential harm to the environment.  Have the Council informed the Environment Agency?  If so, what is their view?  We consider this was preventable if Sefton had acted when we first notified of this. We want to lodge a complaint, under the Sefton Council proscribed complaints procedure, in the strongest possible terms.

On 1st July 2020 Sefton’s Head of Planning replied that he was unable to uphold the complaint. He acknowledged there was no disagreement that development had taken place on this site and that it required planning permission.  He alleged planning enforcement staff visited the site the day after the complaint was made and that planning services responded quickly.  The site’s operator said he believed there was planning permission for the site.  A subsequent check by planning revealed this planning permission dated back to 2002 for Formby Football Club for football facilities but this work was quite different.   An application for planning permission was requested to cover the works that had been carried out and in respect of the future use of the land.   We have to ask why were Sefton Council officers requesting that an application be submitted when they should have been issuing a stop notice to prevent illegal dumping of hazardous waste on a green belt site on a flood plain?  There was obviously no intention of stopping this site to protect a community.  

The Head of Planning argued that the site did not have the status of undeveloped land in the green belt because the Formby Football Club has an outstanding permission for football facilities and stand building.  The owner had indicated he would like temporary permission for the waste recycling business within part of this site to generate income to enable the football club to be viable.  We have to ask why were Sefton planning officers going along with this fabricated story and trying to sell the concept to Formby Parish Council?

The Head of Planning’s excuse for not taking enforcement action was that Government is encouraging Local Planning Authorities to take a more flexible/pragmatic approach to enforcement and to help businesses respond to C-19 and recover from the economic crisis.  We are talking about a business operating unlawfully and dumping waste in a very sensitive area with the risk of contamination not only to the public but also to the ground itself which is on a flood plain.

It is obvious from this reply that from the outset Sefton Council intended giving planning permission for inappropriate development within the green belt and contrary to Sefton’s local plan, the neighbourhood plan and the joint waste management plan.

Planning Applications and meetings between Formby Parish Council and Sefton Council’s head of planning

On 10th June 2020 a retrospective application was submitted for a construction waste recycling centre.  In August 2020 Sefton Council’s Head of Planning met with Formby Parish Council.  The Parish Council was informed that the planning application which had been submitted would be recommended for refusal based on the lack of necessary detail and failure to make any planning case for the proposal.  The idea that a construction waste recycling facility in the green belt on a flood plain had any likelihood of receiving planning consent could never be high.  Despite this the Head of Planning seemed optimistic that a future application would be approved.  This optimism was shared by the site’s operators who had now set up a Facebook page confident that their business would be unaffected by their failed planning permission.  Parish Councillors attending the meeting were reassured that upon refusal an enforcement notice would be issued to the landowner and operators of the site.  On 16th September 2020 the first retrospective planning application was refused and on 17th September 2020 an enforcement notice was served.  See decision notice for first planning application and copy of the first enforcement notice allegedly wrongly served.  

In October 2020 when there were no signs of the operation winding down, a Sefton Borough Ward Councillor emailed Sefton Council officers [MB DL October 8 2020] requesting that a stop notice be issued immediately. The amount of material arriving at site was accelerating and there was a flood alert for the river alt, with this material occupying large amounts of the flood plain and the potential to contaminate the water.  Sefton Council replied that nothing could be done until the enforcement notice came into effect and that the circumstances did not warrant a stop notice.  Sefton Council officers were purposely enabling developers to continue working unlawfully on site by going down the planning enforcement route with its right of appeal to Central Government which could take up to 12 months before being heard and then the Inspector could give a further period of time for compliance.  A Stop Notice would take effect immediately and result in prosecution.  A Stop Notice should have been issued because a community had been exposed to contamination as well as the land itself.  Copy of email to Sefton.

In mid December 2020 another meeting was held between Sefton Council’s  Head of Planning and the Parish Council.  The enforcement notice allegedly had been incorrectly served, subsequently withdrawn and Sefton Planning Department hoped that the matter would be resolved by the receipt of another planning application for the same facility which duly arrived in January 2021.   The Head of Planning tried to persuade the Parish Council that the best course of action would be to give the operators temporary planning permission for 12 months so that Sefton Council officers could regulate the conditions imposed on the planning approval.  If the operators contravened the conditions, Sefton Council would take them right to court.  How on earth would the environmental constraints be overcome in the green belt on a flood plain and when all legislation had been contravened?  Formby Parish Council rejected this idea insisting that the site must be returned to its green belt status.  Copy of Formby Parish Council’s objection to second planning application.

On 11th March 2021 Sefton Council had no option other than to refuse the second retrospective planning  application, with objections from Formby Parish Council, the Environment Agency and then the findings of a site visit on 5th February 2021. On 1st April 2021 Sefton Council then issued a further enforcement notice which took effect on 7th May 2021.  However, Sefton Council has still failed to issue a stop notice.  This meant that the site could continue to operate up to the date the enforcement notice took effect (7th June 2021). See refusal notice for second application.  See Sefton’s enforcement notice 1st April 2021.

To date some material has been removed from site and the mounds have been reduced in part by spreading the remaining waste over a larger area to conceal their height but there has still been no attempt  to restore the site  to its former condition.  The report produced by the EA inspector – following the site visit on 5th February 2021 goes on to point out that, “as all waste was being treated on site prior to export without any sufficient waste acceptance criteria (WAC) testing the material produced would still be considered waste.. There has been no attempt by Sefton Council or the EA to determine where this waste originates or where it is going or to ensure that the site is restored to its former condition.  .

The site’s operators have now been given an extension to the enforcement notice deadline which expires on 19th July 2021.  However given the lack of intervention previously demonstrated by Sefton Council and the Environment Agency our fear is that this situation is far from being resolved and we are seeking the involvement of central government in this matter.  Formby Parish Council are asking that the actions of Sefton Council and other regulators such as the Environment Agency be investigated and that where appropriate the Secretary of State issue appropriate planning guidance with regard to the future handling of similar matters within Sefton and elsewhere.

Statutory bodies, such as the Environment Agency and HSE, have been put in place to protect the public’s safety and our environment.  Our evidence proves they are failing to do so and are actively involved in allowing environmental crimes to continue.  Contamination is being spread far and wide

Below are the various email exchanges between ward councillors/Formby Parish Council and Sefton Council officers which we now refer to as the “merry-go-round” enabling developers to achieve what they set out to do.

On 23rd April 2020 an Independent Formby ward councillor emailed a Sefton Council planning officer expressing concern that large earthworks were taking place, heavy equipment was on site and high embankments had been created.  He could find no record of a planning application and suggested the planning officer involve Sefton’s drainage team and the Environment Agency.  It was Sefton Council’s duty having been alerted by one of their ward councillors to issue a stop notice immediately to prevent further development on this agricultural land in the green belt and on a flood plain and prevent a community being exposed to contamination. 

A week later the planning officer responded alleging the site had planning permission for a hardstanding area, making an excuse that officers needed to get further information before coming to a conclusion as to whether consent is required for the various works.  They would then get back to the ward councillor.  This is a delaying tactic to enable developers to continue working unlawfully on site and we now know the planning officer was referring to a permission in 2002 which was quite different to the work currently taking place.  

Another month went by which allowed the developers to continue working unlawfully on site when the site should have been stopped.  On 17th May 2020 the ward councillor emailed the planning officer once again because illegal development was continuing.  There was an increase in heavy machinery and the development on site was much larger.  It was now obvious that it was not just an earth moving exercise.  The ward councillor emphasised that the site had been specifically excluded in the Local Plan from development following an additional Inquiry meeting and was also not included in the Formby Neighbourhood Plan.  He asked for action to be taken to establish the intent of the site owner and to cease the work which appears to be in preparation for development and not merely a hardstanding. 

On 20th May 2020 the planning officer replied.  Two officers had now met with the site owner to discuss the situation on the site.  They understood there may have been some meetings re the development of the site (new clubhouse, community hub etc) and an application is being prepared for the near future.  In the meantime the works on site which have involved the scraping back of earth to the side of the site and rear of the waste recycling centre are in connection with drainage repair works. That work has been completed and planning officers advised that the earth mounds will need to be levelled back across the area where the works have taken place as the mounds themselves constitute development for which planning permission is required.  Separately a company (who undertook the drainage repairs) have set up a small compound on the site and are operating their business from this location (storage of materials / equipment etc….). Planning officers have advised that this is a change of use of the land for which planning permission is required. As it’s Green Belt a permanent approval would not be granted, however a temporary permission may be possible potentially linked to the site owner being able to demonstrate how such a temporary use might be able to assist the retention of the Football Club, a valued local community asset. The advice given was for the company to either cease the use and clear all the equipment, materials etc…. or alternatively apply for temporary permission. Specifically the site owner was asked to level the mounds as a first step.

Unlawful development was taking place, a ward councillor was asking for this to be stopped and Sefton Council officers were enabling developers to continue working unlawfully on site with various excuses and exploring the possibility of issuing retrospective temporary planning approval when Sefton Council officers should have and could have stopped the site to protect the green belt and a community from contamination.  At this stage the ward councillor was unaware that hazardous waste was being imported on to site, contaminating the whole site and surrounding area.

On 21st May 2020 another Independent ward councillor emailed the Head of Planning, planning officers and the Chief Executive, stressing the urgency for reply as works were continuing and commenting that planning officers just accepted what they were told by developers instead of investigating;  The ward councillor requested details of the drainage repairs as she was unaware that there had ever been any normal drains on this site as it was just open land (a flood plain in the green belt). See emails 2020 6 0 (May-Jun 2020) cllr queries responses from planning enforcement.pdf

The developers had not complied with the instruction to level back the works that had taken place and there was a vast amount of very large construction vehicles still on site, none of the works form part of the policies within either the local plan or Formby and Little Altcar neighbourhood plan.  There has been no discussion with the parish council when it is clear that there should have been. It is again another instance of development taking place without planning permission being given without any consultation and the developers not being forced to put things right.  All works should be stopped immediately, the bunds removed, and the land put back to as was as there is no planning permission. Discussions do not constitute planning permission.  This is certainly not open or transparent and clearly antagonises people who feel that they are being misled.

Another 2 weeks went by and unlawful work was progressing on site.  On 1st June 2020 the Head of Planning replied I apologise for the delay in replying to you. I have needed to speak to a number of colleagues to respond fully to the questions you raise.   At the outset I would like to assure you my enforcement team are going above and beyond in carrying out their duties at this very challenging time for all of us. You will understand there are strict guidelines about visiting sites which limit the team’s ability to carry out full investigations. In fact it wasn’t intended that they meet anyone on site when they visited recently.

You suggest we can insist that works stop when they are not permitted. Though that may be the wish of local people, that is not how the Government intend the enforcement system to work. There are clear guidelines governing what action is appropriate.  

The Head of Planning is deliberately misleading a ward councillor.  We are saying that Sefton Council officers are not complying with planning law or environmental law.  We have discovered that instead of stopping the sites to protect communities delaying and misleading tactics are used on all sites when residents and councillors complain actively enabling developers to continue working unlawfully on site.

On 17th December 2020 one of the ward councillors emailed the Head of Planning proposing an urgent meeting be convened between the Environment Agency, the Head of Planning and Sefton’s Drainage Manager, a representative from the Parish Council and the ward councillor himself.  The Head of Planning alleged contact had been made by the Drainage Manager in July 2020 with the Environment Agency about water contamination when the Environment Agency had confirmed that the activity was not licensed and that they had referred the matter on to the relevant team for investigation.  The Head of Planning promised to set up a meeting to establish how far the Environment Agency had got with their investigation.  Both Sefton Council and the Environment Agency were obviously aware in July 2020 that material coming onto this site had the potential to be contaminated and should have taken appropriate action to stop the site immediately to protect the land and also the surrounding community. See email 2020 12 0 (Dec 2020) Cllrs Concerns over Contamination.pdf

The Head of Planning then refers to comments from a parish councillor about potential contaminants affecting usage of the football pitch which would have given the Council a route into considering issuing a statutory Stop Notice.  He had followed this up with the Council’s Environmental Health lead officer and it was confirmed that there Is insufficient information to demonstrate any harm and that the Council had limited involvement in this matter as any regulatory control or enforcement sat with the Environment Agency who are clearly aware of the breach. Sefton Council would attempt to put some pressure on the Environment Agency to look into the matter but he needed to emphasise that the statutory planning process and the Environment Agency licensing process are separate and are not mutually dependant.

Unlawful work had been continuing on site since April 2020, ward councillors and the parish council had been continually expressing concerns for the safety of the community.  Hazardous waste was being dumped on a green belt site in the flood plain affecting the land (water contamination), wildlife and exposing a  community to contamination.  There had been no assessments/testing of what contaminants were in this hazardous waste.  There was no paperwork i.e. consignment notes to indicate where this hazardous waste originated  (The Environment Agency class waste as hazardous when it has not been tested and its origins are unknown.)  The site did not have planning permission or an environmental permit.     Mounds of waste were growing bigger by the day.  There was mud on the road from lorries driving on and off the site, moving contamination onto public roads.  Hazardous waste was being crushed on site and sold on as aggregates to unsuspecting recipients and contaminating a wider area.   Now a Council’s Environmental Health lead officer was making assertions that there was insufficient information to demonstrate any harm which the Head of Planning was relaying to a parish council and ward councillors to mislead them into a false sense of safety and enabling unlawful work to continue on this site.  

The Head of Planning (alleging he had taken legal advice) tried to convince the parish council that the best course of action would be to grant planning permission for a 12 month operation to maintain some form of control.  For this reason Sefton Council intended accepting a planning application which must arrive before 15th January 2021 and taking it to planning committee for determination.  Our experience is that the planning committee is controlled by planning officers.  It is very rare that officers’ recommendations are challenged.  Sefton Council officers definitely had no intention of stopping this site to protect the community, prosecuting those involved and carrying out their lawful duty.

Sefton Council intended forcing through a planning application which went against policies in the local plan, Formby neighbourhood plan, the joint waste plan and a central government inspector’s decision at a public inquiry.  If approval was given this would set a precedent and force the parish council into legal action to defend their neighbourhood plan.

On 12th January 2021 the Head of Planning emailed a ward councillor confirming the Council had been in touch with the Environment Agency.  No inspection of the site had taken place since first reporting the incident due to Covid restrictions and work pressures, where Environment Agency priority was being given to high risk sites which already held permits or sites which were causing large numbers of complaints and this site didn’t fall into these categories at the time.  The Environment Agency was updated on the current situation and acknowledged the need for a site inspection which they were planning to do in the next 2 weeks.  See email 2021 1 0 (Jan 2021) update on EA visit post granting of permit.pdf

The Environment Agency were well aware that an illegal waste site was operating on green belt land in a flood plain and that the operators did not have a licence.  The Environment Agency should have reacted immediately to protect the community and the environment but were participating in the “merry-go-round”.

On 11th February 2021 the ward councillor emailed the Head of Planning following a telephone conversation asking various questions:-

On whom had the Stop Notice been served? 

  •  Reply -  [The Head of Planning had] "just had confirmation that the Environment Agency had not yet served it but it is imminent.  It will be served on the businesses using the site".  

  • Our comments: On 12th February 2021 the Environment Agency issued a stop and clear letter not a stop and clear notice.  The letter carries no legal weight whereas an official stop notice is a legal document and is enforceable.  Were Sefton Council officers deliberately misleading ward councillors and the parish council or was the Environment Agency put under pressure to change their intention?

You also stated that the Environment Agency stated that no contaminants were on site.  What methodology has been used to determine this?  

  • Reply – I am not sure but this is something you will need to pursue directly with the Environment Agency.  I have copied in the Council’s expert in this matter and he will be able to advise further.   

  • Our comments: The Environment Agency’s report of 5th February 2021 states that the waste must be regarded as hazardous with the absence of any testing for contaminants.  They also commented “as there is a lack of any appropriate measures or procedures to contain any waste we currently feel this has the potential to cause a risk to human health and contamination off site.”

Can you confirm if both the Sefton environmental officer and Environment Agency were on site if they checked any of the lading bills/consignment notes which are clearly trackable?  

  • Reply – Again I do not know this but the 2 officers who were there may be able to advise further.   
  • Our comments: An Environmental Health Officer present at the site inspection on 5th February 2021 commented in his consultee comments to the planning application “As a result of our meeting the Environment Agency Officer made it clear that the activity on site was not authorised and served a Stop and Clear Notice on management due to the lack of permissions held by the operators.  There were other reasons associated with this decision including the lack of evidence at the time to demonstrate the type of waste on site and the potential for contaminants within this. No waste transfer notes, or indeed any records of the type of waste on site were produced during our visit.”

Have you issued the planning refusal notice and if not when will this be issued?  

  • Reply – not yet but as soon as the case officer has fully weighed up the proposal he will be able to issue the decision.  I will ask him to keep you up to speed with his progress.

Can I have a copy of the original enforcement notice that was served on the first planning application and then subsequently withdrawn? 

  •  Reply – I will ask the officer to provide you with a copy of this.

From March to July 2021 the ward councillor continued to email Sefton Council’s head of planning, pressing for Sefton Council to issue an immediate stop notice to protect the community from contamination and have the land returned to green belt with the head of planning giving various ludicrous reasons why this was not possible such as:-  The tests for serving a stop notice are very high.  None of the issues raised would justify the serving of a stop notice which is primarily aimed at preventing harm to human life or irreparable damage to interests of acknowledged importance.  The fact that the Environment Agency has now issued a permit for the use further reinforces the argument that there is no justification to serve a stop notice. 

Emails 

2021 3 0 (Mar 2021) EA permit

2021 3 16 (16 Mar 2021) Cllrs Request for Stop and Clear Notice

2021 4 8 (8 Apr 2021) Cllr_request_For_Council_Enforcement_Action_Following_EA Permit

2021 5 10 (10 May 2021) Enforcement_Notice_Recipients_Redacted

2021 6 0 (Jun-Jul) Post_Enforcement_Notice_Expiry_Request_for_action