 Saville Road, Lydiate (see blog for full account)

On Friday, 31st January 2020 on a contaminated site intended for housing at Saville Road, Lydiate developers employed an unqualified youngster from a recruitment agency to undertake unlawful demolition when none of the pre-commencement of development contaminated land conditions under Part IIA of the Environmental Protection Act had been discharged and no work whatever should have been taking place.  The developers had not produced a notice of intended demolition, a demolition asbestos survey and method statement on how contamination was to be dealt with.  The developers had also failed to submit a HSE F10 notification form under the Construction Design and Management Regulations (CDM).  It is a legal requirement that all this documentation must be produced before demolition is allowed.  Developers were fully aware of their legal requirements and Sefton Council and HSE officers were well aware that the developers had not complied with these legal requirements.

The young man was working on site unsupervised and was smashing down with a sledgehammer garages and their asbestos roofs simultaneously.   He had no protective clothing or a mask and was unaware that asbestos was involved, having been told the roofs were cement based.  He was exposing himself to contamination, as well as residents and anyone he came in contact with when leaving the site and going home with asbestos dust all over his clothing.  Residents told him what he was doing was dangerous and unlawful and advised him to stop work and leave the site immediately which he did, locking the site gate behind him.  Developers had exploited this young man and he should not have been put into such a dangerous situation on a contaminated site.  There was no scaffolding or welfare facilities on site, there were no demolition or asbestos removal signs displayed.  Residents had not been notified that demolition was to take place. 

The site (in a densely populated area and surrounded by housing) was in an appalling dangerous condition.  Asbestos debris was strewn everywhere and mixed with blocks and bricks from the garage structures and also some of the contaminative contents of the garages (which the young man had removed earlier).  There were fires, boilers, boiler parts, various boiler flue parts, baths. Insulation material, plastic tanks, metal and plastic drums some of which were made of asbestos and some of which contained asbestos material and other contaminants which had not been identified but were all now contaminated with asbestos debris from the roofs.  This is contrary to the Control of Asbestos Regulations and unlawful.  Before demolition can be contemplated, asbestos and any other contaminants have to be removed safely and legally by suitably qualified personnel.  . About one third of the buildings had been unlawfully smashed down and the remaining buildings were structurally dangerous with pieces of asbestos loose and hanging from the roofs.  The site’s dangerous condition is shown in residents’ photographs and in an article published in the “Liverpool Echo”. 

Everything on site was now contaminated.  A relatively straightforward procedure of removing asbestos safely and lawfully had escalated into an environmental catastrophe which a Sefton Council officer had warned against in a report to Planning Committee in August 2019 if asbestos was not dealt with correctly.   The developers had chosen the cheapest and most dangerous way to demolish the buildings without following any leglisatlion imposed on them and in so doing had exposed a community and a young man to life-threatening contamination. 

When residents and their councillors complained on the morning of 31st January 2020  that a community was being exposed to contamination from asbestos, Sefton Council and HSE officers should have come out immediately, stopped the site, made it safe and prosecuted those involved.  This would have limited a community’s exposure to life-threatening contamination and suitably qualified personnel could have been brought in to clean up the site safely and legally.

Sefton Council and HSE officers had no intention of stopping this unlawful demolition.  A Sefton Council officer had advised the ward councillor when she had complained on 31st January that Sefton Council intended issuing a retrospective demolition notice and a building control officer would be visiting the site on Monday, 3rd February.  We have an email received on 5th February from HSE who had not been in contact with complainants and were now refusing to comply with their legal responsibilities and passing us back to Sefton Council who had directed us to HSE on 31st January.  If officers had come out when residents first complained, they would have caught the young man unlawfully demolishing the buildings with the asbestos in situ and they would have had to investigate what they had seen which officers wished to avoid.  Such investigations would have exposed corrupt practices which had been going on for some considerable time involving other sites with the full knowledge of Sefton Council and HSE officers.   Instead of reacting to complaints, Sefton Council officers redirected complainants to HSE giving developers time to fabricate a ludicrous story of travellers occupying the site and being responsible for the damage to the buildings.  Officers were quick to accept this story and did not interview residents or their councillor who had witnessed unlawful demolition commencing on site and had photographic evidence to disprove the developers’ allegations.  A Freedom of Information request to the Police confirms no complaints of travellers occupying this site.

On Monday, 3rd February on the pretext that they were “only tidying up the site to make it safe” alleging that travellers were responsible for the appalling dangerous condition of the site, these same developers employing 2 different unqualified workmen, were then allowed by Sefton Council and HSE officers to continue unlawful demolition with the asbestos still in situ which residents’ photographs taken on a daily basis prove.  They were also aggravating the situation by moving contaminated building debris around the site and putting some of it into skips to be removed later from site.  When unlawful demolition was well underway, with approximately half the buildings knocked down with the asbestos still in situ and in the absence of a demolition asbestos survey and a method statement, 6 days later (on 6th February 2020) Sefton Council officers then unlawfully issued the council’s retrospective notice of intended demolition, giving developers a green light to continue their unlawful activities.

We have since discovered from a HSE letter dated 4th March 2020 to the ward councillor that a HSE inspector visited the site on 31st January and found the site secure.  (This must have been in the aftenoon and some time after residents had already stopped the site and the young man had locked the site gate before going home).  The inspector reported that he could see demolition had taken place and was concerned about the structural stability of the remaining buildings.  He would have seen the appalling dangerous condition of the site as already described.  Why didn’t he stop the site, make it safe and call in suitably qualified professionals who could handle this dangerous situation?    HSE is our national safety body and their inspector as a safety officer had the power to take enforcement action to protect residents against these unlawful reckless developers but he allowed unlawful demolition to continue.  Why had HSE sent out an inspector on 31st January when in an email to the ward councillor received on 5th February they say “In this case, although HSE do have enforcement responsibilities for these premises, the LA have responsibility to enforce the issues you have raised relating to dust and members of the public, therefore your concerns should be directed to them.”

HSE allege the inspector visited the site again on 8th February which was a Saturday and outside his normal working hours.  Why had HSE sent the inspector out again when HSE had no intention of stopping the site and making it safe?  Was this visit under instructions from HSE’s Chief Executive to whom 6 borough councillors and 2 parish councillors had complained on 5th February?   By 8th February between two-thirds and three-quarters of the buildings were down, with the asbestos still on the buildings and the condition of the site had deteriorated.  He could see that unlawful demolition had progressed from his visit on 31st January with the same developers involved but he still did not stop the site or make it safe.  He then contacted the local authority building control to alert them to the potentially dangerous structures.  This is the same building control department who had unlawfully issued a retrospective demolition notice on 6th February when there was no demolition asbestos survey or method statement and when the pre-commencement of development contaminated land conditions had not been discharged..  Building control had already visited the site on 3rd February and again on 5th February but had allowed unlawful demolition to continue.

Around 10th February the HSE inspector met one of the developers on site.  He found there had been no asbestos survey and there were issues with the way the clean-up work had taken place.  He also established that there was no welfare on site.  The Inspector had witnessed the progress of this unlawful work on various dates from 31st January onwards.  By now three-quarters of the buildings were down.  The other quarter of the buildings still had asbestos on them and he had said the structures were dangerous.  The site was littered with the contents of the buildings and building debris (including asbestos).  He had now established there was no demolition asbestos survey and must have known there was no HSE CDM in place which is a legal requirement.   Why was he allowing unlawful demolition to continue in a dangerous contaminative manner, not stopping the site and making it safe when residents and the general public were being contaminated?

We know from extracts received recently of Sefton Council officer reports that on 10th February (10 days after residents had first complained on 31st January) a building control officer had conversation with an officer from HSE (presumably the first HSE Inspector) who confirmed they would be taking a lead in terms of dealing with any potential asbestos contamination issue.  The inspector had visited the site on 3 occasions and failed to do his legal duty to protect a community and workers on site from exposure to contamination, allowing the same developers to continue unlawful demolition. 

It was not until 20th February (10 days after the first Inspector’s visit) when the remaining buildings had all been allowed to be demolished with the asbestos in situ, that a second HSE Inspector visited the site. HSE allege the first inspector was not available.  Had the first inspector been removed from the case because he was finally going to take enforcement action when HSE had allowed unlawful demolition to continue in the absence of any legal documentation?   HSE allege the second Inspector reviewed all the concerns and the proposed enforcement actions. This Inspector had given the developers time to complete unlawful demolition and remove some of the contaminated material from site in skips.  On 20th February residents' photographs show the site in an appalling condition and this Inspector would have seen this.  Contaminated rubbish was still strewn over the site mixed with building rubbish, including blocks and bricks and a considerable amount of asbestos debris in various sizes mixed amongst this rubbish.  Wrapped and taped asbestos lay on the ground, too big and too heavy to be loaded into the skip.  A later video dated 17th March shows how this asbestos was man-handled into the skips.  The inspector failed to mention the dangerous condition of the site with asbestos strewn everywhere.

This second Inspector had already reviewed the first Inspector's report.  The second inspector confirmed that there was no asbestos survey and the developers had not complied with the Construction Design and Management Regulations.  The inspector served an Improvement Notice for an asbestos assessment and a plan of work for the remaining clearance work and a Notice of Contravention for compliance with the Construction Design and Management Regulations.  The developer agreed to stop work until he had carried out an asbestos survey. The Inspector stopped the site but in a telephone conversation to one of the ward councillors said I am allowing the developers to remove blocks from site.  These blocks will have been contaminated with the asbestos debris and residents observed the blocks being picked up in an open truck with grabbers parked on Saville Road itself (a public road).  Residents have photographs of asbestos debris subsequently dropped outside the site perimeter in Saville Road.  The developers had achieved what they had set out to do.  To demolish the buildings in the cheapest way possible without following any legislation imposed on them and on this site and in so doing had exposed a community and workers on site to life threatening contamination.  From 31st January residents and their councillors had continually asked both Sefton Council and HSE officers to stop the site and make it safe but their concerns were ignored.

We submitted a Freedom of Information (FOI) request to HSE at the end of April for all information relating to Saville Road.  HSE have declined to provide this information, saying it is not in the public interest for this information to be released and they are still investigating the incident.  How can HSE conduct any investigation when they are implicated by allowing developers to work unlawfully on a contaminated site without complying with any legislation imposed on them and when they haven’t interviewed the witnesses (residents and councillors) or asked for their evidence?   We have challenged this and HSE are now undertaking an internal review which has been going on since May and we have still not received the outcome of this review or more importantly the information requested despite numerous prompts to HSE on 6th and 29th July and again on 12th October 2020. 

We contacted the Information Commissioner on 9th November in an attempt to obtain this information.  On 30th November, the Information Commissioner wrote to HSE giving them a deadline of 10 working days to respond to us with the outcome of the internal review.  We have heard nothing from HSE and it is now 18th January 2021.  In a letter to us on 30th November, ICO state that they have now closed the case.  On 17th December we emailed ICO asking them to keep the case open and seek all the information we have requested.  Why have ICO closed the case when HSE have not responded to the deadline given by ICO?  ICO replied to us on 17th December that there is a waiting time of approximately 4 months for our case to be allocated to a case officer. We are being sent around in circles once more.  We know HSE are unable to give us the various reports and information requested because this information will condemn them as law breakers but we expect ICO to insist HSE provide us with information we have a right to access.

Sefton Council officers also made visits to the site.

3rd February – a planning enforcement officer:  

3rd, 5th and 10th February – a building control officer 

10th and 11th February – an environmental protection enforcement officer

but none of these officers carried out their legal duty to protect the community.  They were all well aware that no work should have been taking place because contamination had not been addressed through the legal process.

We have a copy of the environmental protection enforcement officer’s report to our MP on 11th February which contains many comments which are untrue and conflicts with residents’ photographs taken on a daily basis and the HSE Inspector’s observations. . 

Around this time the site was in its worst condition.  Three-quarters of the buildings had already been allowed by Sefton Council and HSE officers to be smashed down with the asbestos still on them and the officer could see that the remaining quarter were structurally dangerous with unsupported pieces of asbestos debris hanging down from the roofs.  The site was littered with asbestos debris mixed with blocks and bricks and the contents of the garages.

The officer was misleading the MP and residents and implying that correct procedures were being undertaken.  He was well aware but had failed to mention that none of the pre-commencement of development contaminated land conditions imposed on the site under Part IIA of the Environmental Protection Act had been discharged.  No development/demolition could take place until all contamination, including asbestos, had been assessed and removed safely and legally.  This is an officer employed to protect residents and enforce the laws imposed on this site.  He was actually condoning the developers’ unlawful activities and enabling them to continue contaminating a community   He was protecting Sefton Council and himself from prosecution and misleading the MP and residents.  This officer has a history of misleading residents who complain about being exposed to contamination.  He says Sefton Council officers have contacted HSE but they can’t guarantee HSE will visit the site,   We now know that a HSE officer had already visited the site and was concerned about the structural stability of the buildings.  He had also spoken with a Sefton Council building control officer and informed him that HSE would be taking a lead in terms of any potential asbestos contamination  

The environmental enforcement officer also says his department was not sure if asbestos was involved which again was untrue.  Sefton Council officers were well aware that asbestos was present.  The Environmental Health Manager from this officer’s own department in his comments to planning committee in August 2019 had stressed that appropriate investigation and mitigation was required including an asbestos survey to ensure no ground contamination occurs during the demolition process.  We have had a report undertaken by asbestos specialists which confirms the presence of asbestos and also details all the contraventions of the Control of Asbestos Regulations on this site. 

From 31st January Sefton Council and HSE officers had been responsible for allowing unlawful demolition to proceed in a very dangerous manner and for residents to be exposed to contamination for 10 days.  Now this officer was allowing unlawful demolition to continue without any assessments of contamination in or on the garage buildings and without any documentation in place, including a demolition asbestos survey and for a community to be contaminated.  Throughout this time residents and their councillors were continually asking Sefton Council and HSE Chief Executives to stop the site and make it safe because residents were being exposed to contamination and were fearful for their lives and the lives of their children with unqualified workmen operating unlawfully on a contaminated site.

Former Lydiate Barn Nurseries and Garden Centre (see blog for full account)

The ward councillor was contacted by a neighbouring resident who asked her to “call-in” 2 planning applications for this site (which was in the green belt) so that they could be considered  by a planning committee instead of  Sefton Council planning officers under delegated powers.    The resident was concerned that his right of way was being removed by developers of the adjacent housing development because construction of all 7 properties was underway which did not conform to the approved site layout.  The developers had purposely contravened the approved plans and site layout to accommodate an extra dwelling.  This extra dwelling was at the front of the site and would set a precedent if there were to be a second phase of development in the green belt.  After the neighbouring resident had contacted Sefton Council’s planning department unlawful work had been halted.   The developers had then submitted these 2 planning applications, one application for a new site layout (already under construction) and one application for an additional dwelling.  Both applications were recommended by Sefton Council officers for approval.  Developers shouldn’t be given development rights when they have contravened the laws of this land.

When the ward councillor checked the planning portal she found far more serious contraventions had occurred which affected residents’ health and safety.   Because of past uses of the land, pre-commencement of development contaminated land conditions under Part IIA of the Environmental Protection Act had been imposed on the site and none of these contaminated land conditions had been discharged   This meant that no development (which includes demolition and site clearance) should have taken place.   Under Part IIA these contaminated land conditions are imposed on developments to protect existing and future residents, the general public and workers on site from exposure to contamination.  Planning approval is given subject to these conditions being discharged in a legally structured manner by way of submission of planning applications.  Sefton Council officers were well aware that none of these contaminated land conditions had been discharged.

Unlawful demolition of existing buildings on site which in themselves would have contained contaminants had taken place and the site had been cleared.  The land had been excavated and foundations constructed with associated brickwork for all 7 properties.  Drains had been excavated and constructed.  There were mounds of excavated contaminated soil in various locations over the site and one mound intruded into the additional plot for which planning approval was sought.  This is all contrary to Part IIA of the Environmental Protection Act.  Development cannot take place until the site has been remediated (cleared of contamination).   Why had Sefton Council officers allowed all this to take place?  Had building control been out and checked these foundations knowing full well that no development should have been taking place or had the developers gone ahead without clearance?   Planning approval should have been withdrawn and the developers should have been prosecuted. 

A planning committee meeting was held remotely via Microsoft Teams on Wednesday, 10th June 2020.  A virtual site visit had been held on Monday, 8th June.  On both occasions, photographs were presented of the site not as described above but as it was several years ago showing the former garden centre.  The ward councillor had emailed photographs to Sefton Council officers showing the present condition of the site with the foundations for the properties in place but officers had refused to include these photographs with her statement.  Vital information was being withheld from the planning committee which proved that unlawful development had already taken place.  This was a new plan which the developers had already started constructing.  This was not a variation of an old plan which Sefton Council officers wanted everyone to believe because officers would be admitting that development had taken place and no enforcement action had been taken against the developers.

The ward councillor was not allowed to speak at committee and neither was the petitioner.  Their statements were read out by a planning officer.   A late petition of 25 affected residents was not allowed to be included with committee papers nor its contents read out to the committee.  From the discussion that followed on the pre-commencement of development contaminated land conditions, it was apparent that Sefton Council officers didn’t want this issue brought into the discussions and information was being purposely withheld from the committee.  In view of the total disregard of planning law and Part IIA of the Environmental Protection Act by these developers, a full debate needed to take place and the planning committee should have been made aware of this site’s particular circumstances.  The council’s solicitor who was present also needed to be involved. 

An independent councillor  (who was a member of the planning committee) asked the planning officer to confirm that remediation of land must be agreed with the local planning authority and documentation discharged prior to the commencement of works.  The planning officer avoided answering the question directly and provided information that was not relevant.  He suggested getting advice from the environmental health officer.  The Independent councillor then asked the environmental health officer  to confirm that an offence by a breach of the Environmental Protection Act had been committed on this site by commencing development.  The environmental health officer failed to answer the question correctly and some 6 minutes was spent avoiding the question and side-stepping the very serious issues.  It was only when the Independent councillor refused to accept the answer and repeated his assertion that an offence had been committed that the Head of Planning was forced to intervene and conceded that the councillor was right. (see video in main blog.)

Planning approval was being forced through by Sefton Council officers who had stifled debate, withheld vital information and misled a planning committee.

Developers had contravened Part IIA of the Environmental Protection Act with a risk of exposure to contamination not only to residents, the general public and workers on site but also future residents.  These developers were now being rewarded with planning permission for an unlawfully constructed development and an extra dwelling in the green belt.  A show of hands by a planning committee who have been duped does not override the laws of our land.  Once again developers have not been prosecuted and allowed to contravene planning law, the Building Act and Part IIA of the Environmental Protection Act thereby contaminating a community.

Unlawful Waste Recycling Plant Formby Merseyside - Land to the South of Formby Industrial Estate (see blog for full account)

On 23rd April 2020 a local ward councillor reported earthworks on green belt land and functional flood plain, on land to the south of Formby Industrial Estate.  During an extensive Public Inquiry this land had been rejected for development in Sefton’s  Local Plan and Formby and Little Altcar’s Neighbourhood Plan, despite Sefton Council officers heavily promoting this area for development.  

On 29th April a Sefton Council officer advised that a member of the planning enforcement team had been out to site and noted that some earth had been cleared back and small bunds formed.  An individual on site tried to claim that planning permission had been given for the work carried out.  The Sefton Council officer was awaiting further information from the landowner before determining if planning permission was required.

On 17th May the ward councillor once again contacted Sefton Council officers because there was increased activity on site and the arrival of heavy machinery.  The area under development had now become considerably larger.  The ward councillor requested that action be taken to establish the intent of the land owner.  Around this time mobile plant, in particular a waste/earth screen machine was brought to site.

Mobile plant and specifically waste screening machines require permits because of their ability to create dust from the screening process and the large mounds of contaminated soil and other materials they produce.  This is considered a statutory nuisance under Part III section 79 of the Environmental Protection Act and Sefton Council Officers have a statutory duty to police these activities.  Indeed Local Authorities must give prior written approval for processes under their control.  This includes permits for mobile crushing and screening equipment.

On 20th May Sefton Council’s planning manager replied that officers had met with the site owner at Formby Football Club the previous week to discuss the situation on the site.  Sefton Council understand that there may have been some meetings about development of the site (new clubhouse, community hub, etc) and an application Is being prepared for the near future.  The works on site are in connection with drainage repair works which have now been completed.  The mounds will need to be levelled back across the area where the works have taken place as the mounds themselves constitute development for which planning permission is required.

Separately the company who undertook the drainage repairs have set up a small compound on the site and are operating their business from this location (storage of materials/equipment, etc.).  Sefton Council officers have advised this is a change of use of the land for which planning permission is required.  As this is green belt land, a permanent approval would not be granted.  However, a temporary permission may be possible, potentially linked to the site owner being able to demonstrate how such a temporary use might be able to assist the retention of the football club, a valued local community asset.  Advice given was for the company to either cease the use and clear all the equipment, materials, etc. or alternatively apply for temporary permission.  Specifically the landowner was asked to level the mounds as a first step.

On 20th May Formby Parish Council formally complained to Sefton Council’s head of planning at the lack of enforcement action and the failure in the statutory duty of the local planning authority to uphold national planning policy, Sefton Council’s Local Plan and Formby and Little Altcar’s Neighbourhood Plan policy.  Far from putting pressure on the landowner to comply the local planning authority seemed to be doing just the opposite and creating an environment for this unlawful activity to continue.

On 9th June Formby Parish Council complained to Sefton Council’s monitoring officer formally about Sefton Council’s planning officers’ failure in their statutory duty to address adequately the unlawful development.

On 1st July the Parish Council’s complaint was rejected by the Head of Planning.  He pointed out that officers were out on to site relatively quickly but failed to mention how swiftly officers bought into the story that the works were associated with drainage.  He also asserted that the landowner advised the enforcement officer he had obtained an environmental permit to carry out this work.  Planning services have notified the local lead flooding authority (in this case Sefton Council) who will advise the Environment Agency of work carried out and they can check that the appropriate consent has been granted.  He concluded by saying that an application has now been submitted for a Construction Waste Recycling Centre within the Formby Football Club site though further information is awaited so the application is not yet valid.

On the 5th of August 2020 retrospective planning application DC/2020/00986 was validated by Sefton Council for the ‘Use of the land as a Construction Waste Recycling Centre’.  The application was for facilities to recycle construction, demolition and excavation waste. The site according to this application was 0.35ha, however mounds of building waste and rubble infill covered at least 1.5ha of land.  It had been clear for some time that the company occupying the land had been running an illegal waste recycling business.  Now however it was impossible for Sefton Council officers to be agnostic about the matter.  At this point instead of putting a stop to this illegal activity planning officers allowed it to continue without questioning the origins of the waste and whether it was contaminated.  There could be any number of contaminative substances harmful to humans in this waste.  The site is adjacent to football pitches, a Tesco superstore with large car park, a recycling centre and an industrial estate.

The treatment and transfer of waste is a highly regulated industry, waste treatment and recycling operations require permits.  Some are issued by the Environment Agency such as waste operation permits (those needed for recycling of construction waste), and others like the waste screening machine (mobile Plant) used on this site, require permits issued by the Local Authority.  It is an offence to operate a regulated facility without a relevant permit, punishable by up to 5 years imprisonment or £50,000 fine.  In order to obtain a mobile Plant permit the applicant must provide their name, address, the location of the site and full details of relevant planning permissions.  Along with this, a description of waste and its intended final use, complete with the relevant fee.  Of course this site does not have the required planning permission. 

On 16th September 2020 the planning case officer issued his report and recommendation to refuse retrospective planning permission.  The Environment Agency (EA) was formally consulted on this application and the officer’s report records the EA view that there was “insufficient information provided to assess the impacts of and to the development. This is particularly in reference to the absence of the Surface Water Drainage Strategy, as mentioned within the Flood Risk Assessment”.

Also of note is the lack of response from Sefton’s Environmental team, merely stating “No objection subject to conditions relating to the control of dust from the site”.  A brief check of the Environment Agency Public register https://environment.data.gov.uk/public-register/view/index   clearly shows that the company listing its business address onsite does not have a permit for handling construction waste and Sefton’s Environmental Team are responsible for policing the illegal tipping and processing of waste, checking transfer notes and ensuring compliance with the law.  Without a site permit none of the consignments brought to and processed onsite can have been done so legally.  Yet this does not seem to have caused as much as a raised eyebrow?

The Local Lead Flood Authority (Sefton Council) confines its comments to the substantial flaws in the Flood Risk Assessment (FRA).  However in  England and Wales a flood defence consent is required from the Local Lead Flood Authority  for consent to carry out works within 10m of a watercourse, and an application must include, plans, sections and details including any environmental mitigation measures.    Under the Water Resource Act it is an offence to knowingly permit the pollution of controlled waters, this includes groundwater and local rivers and watercourses.  Stockpiled materials should be stored away from watercourses and protections should used  to prevent discharge such as geotextile membranes.  All of these regulations had been flouted in the months leading up to the submission of the retrospective application.  It was clear that much of what had occurred amounted to environmental crimes carrying substantial fines and/or a significant time in gaol, but Sefton Council treat the matter in the same manner as sticking a small shed on the green belt!

On 8th October the ward councillor  emailed  the head of planning and also building control  complaining that she had observed several very large lorries entering the site with rubble etc followed by a succession of smaller vehicles with trailers. She asked Sefton Council officers to issue a stop notice or explain fully why they were refusing to do so.  This business is being run illegally.  Recycling building waste is a very regulated industry and they cannot have the required licences and permits, and similarly the large lorries cannot have the required permits to dispose of the waste.  Who is checking this waste for no contaminants?  If it was a legal site they would require an approved  flood risk assessment and planning permission which they do not have. The amount of material arriving at site is accelerating and we are currently on a flood alert for the river Alt, with this material occupying large amounts of the flood plain

On 9th October the planning enforcement officer replied “I would advise that from a planning point of view the use of the land is not illegal. It is important to clarify that to carry out development or use land without the necessary planning permission in place is not illegal. It is a criminal offence not to comply with an enforcement notice however at this stage we are still within the compliance period for the enforcement notice that has been served.  The importation of material and waste carrying permits is something which is regulated by the Environment Agency. It would be a matter for the Environment Agency to determine if the waste recycling operation being carried out is operating in accordance with their waste permits”.

The head of planning continued to excuse the inactivity of his officers by asserting that the officers informed the company that had begun unlawful development to either restore the land to its previous condition and remove the vehicles stored onsite or apply for planning permission. 

Former Mayflower Industrial Estate, Formby (see blog for full account)

In 2017 at the former Mayflower Industrial Estate in Formby, nearby residents complained to both Sefton Council and HSE officers that they were being exposed to asbestos contamination from demolition.  Once again the site was not stopped and made safe.  There were pre-commencement of development contaminated land conditions imposed on the development which had not been discharged.  This meant that no work whatever could take place.  These contaminated land conditions were not discharged until 5th April 2018 which would permit remediation only to be undertaken and were discharged simultaneously when each condition must be satisfied in order prior to progressing to the next in the sequence.

From February 2017 to April 2018 the following had taken place:-

Unlawful demolition

A machine brought on to site to crush demolition debris spreading contaminated dust and further contaminating residents.

Severe dust contamination lay on outdoor furniture at properties backing on to the site (residents submitted photographs to Sefton Council’s Environmental Protection Department).

Cars further from the site were also covered in contaminated dust.

Demolition debris (crushed on site) was stacked some 20 ft high.  How could Sefton Council officers allow demolition debris from buildings which contained asbestos and other contaminants to be crushed on site when a permit could not be issued because the pre-commencement of development contaminated land conditions had not been discharged.

A Sefton Council officer came out on to site and instructed the developers to reduce the size of this mound. He took photographs but the site was not stopped and made safe in contravention of Part IIA contaminated land conditions.

Contaminated soil being excavated and dumped on top of crushed demolition debris (as shown by residents photographs)

Unlawful work had been continuing on a contaminated site when none of the pre-commencement of development contaminated land conditions had been discharged.  In October 2017 the developers had then submitted one planning application to discharge all 3 pre-commencement of development contaminated land conditions retrospectively which is totally against Part IIA of the Environmental Protection Act. 

The ward councillor had previously tried to stop the site to protect residents from exposure to contamination which Sefton Council officers had refused to do.  Officers were now aiding and abetting corrupt practices by accepting this retrospective planning application and were intending to give approval under delegated powers.

The only course of action now open to the ward councillor was to remove officer delegated powers and put this planning application into a planning committee (“calling-in” this application) so that discussion could take place concerning the developers’ total contempt of the law and the cover-up by Sefton Council officers.  The ward councillor’s request for a “call-in” was refused by the same officers involved in the cover-up with the excuse that these were technical matters.  .All 3 contaminated land conditions were finally discharged on 5th April 2018 under delegated powers after Sefton Council’s constitution had been amended on 25th January 2018 with the assistance of the ruling political party with the recommendation that applications to vary or remove conditions are not considered by planning committee thus preventing councillors from “calling-in” applications to discharge conditions.  We are saying approval of pre-commencement of development contaminated land conditions imposed under Part IIA of the Environmental Protection Act are not technical matters but acknowledgement of compliance with legislation.  The laws of our land cannot be overridden by a local council’s constitution. 

Corrupt practices have to be stopped and those responsible (developers and public servants) made to face the consequences.

2005 – 44,000 cu metres of contaminated soil sold off for landscaping purposes

Going back to 2005 the BBC and the Environment Agency investigated the owner of a Southport waste transfer station who had sold off 44,000 cu metres of contaminated soil containing white, brown and blue asbestos for landscaping purposes on a nature reserve in Scarisbrick Lancashire (http://news.bbc.co.uk/1/hi/magazine/4457663.stm).   Over a period of time residents had observed and reported suspicious behaviour with tractors dumping this dangerous hazardous material on to the site which must have come from contaminated sites similar to the ones detailed in this blog.   Why wasn’t he prosecuted?  Why wasn’t he prevented from working with hazardous waste ever again?  Was the nature reserve ever made safe?  If not, it is now a contaminated site.  Were the origins of this hazardous waste ever traced?  Were the authorities ever investigated for allowing this to happen? 

Former Daverick Motors Site, Lydiate (see blog for full account)

The individual investigated in 2005 was caught once again by residents.  This time in 2013 in Lydiate when his demolition company was responsible for undertaking unlawful demolition on a contaminated site intended for housing.  Residents complained about exposure to contamination to Sefton Council and HSE officers.  Pre-commencement of development contaminated land conditions which had been imposed on the development had not been discharged.  No work, including demolition, could take place.  Sefton Council officers should have come out, stopped the site, made it safe and taken prosecution proceedings.

The site was not stopped and his company was allowed to complete unlawful demolition over a 3 day period without any demolition documentation in place.  There had been no assessments of contamination (a demolition asbestos survey) and no method statement produced prior to unlawful demolition..  When the buildings were down, Sefton Council officers issued their notice of intended demolition and withheld notice to residents.  Sefton Council officers have acted unlawfully in so doing.  If officers had performed their legal duty when residents first complained, residents’ exposure to contamination would have been limited to several hours only.  The site continued to operate unlawfully throughout 2013 and 2014 with contaminated soil being excavated during this time, exposing residents to further contamination.  Another of this man’s companies was removing hazardous waste from site between 22nd May and 3rd July 2014  before a remediation strategy was agreed on 2nd September 2014 (see report in blog).

When contaminated land conditions were eventually discharged in September 2014 with the submission of a remediation strategy which would permit remediation only to be undertaken, the following had already occurred between January 2013 and September 2014 with the full knowledge of Sefton Council and HSE officers:-

unlawful demolition

unlawful removal from site of 1640 kgs (over 1½ tonnes) of hazardous waste containing asbestos

doctoring of the land using tractors (to avoid suspicion as in 2005) to remove contaminated soil and import soil on to site

unlawful excavation of foundations and unlawful construction of houses on a contaminated site at the same time as hazardous waste was being unlawfully excavated and unlawfully removed from site over a period of six weeks from 22nd May to 3rd July 2014.  We have consignment notes in our possession dated 22nd May to 3rd July 2014 for 48 loads only.  Where are the consignment notes for the excavated contaminated soil removed in early April so that foundations could be laid for the first properties?  Had building control been out and checked these foundations knowing full well that no development should have been taking place or had the developers gone ahead without building control clearance?

We have documents showing that a Sefton Council monitoring officer visited the site in May 2014 and asked the developers what was being followed on site.  The officer noted that all the buildings had gone and a house had been built when a remediation strategy had not been agreed.  She was aware that Part IIA contaminated land conditions were not being followed and what was happening on site was unlawful.  The site was not stopped and the developers were allowed by Sefton Council officers to continue their unlawful activities.

In July 2014 a HSE inspector visited the site when house construction was underway. This is the same HSE inspector involved with many of the other sites in this blog.   Why was a HSE inspector now out on site?  This was some 18 months after HSE had failed to react to residents' complaints about exposure contamination on 29th January 2013 and when HSE knew there was no documentation in place under the HSE Construction Design and Management Regulations (CDM).

The inspector issued a contravention notice for various health and safety contraventions:-

Failure to provide suitable and sufficient welfare facilities

Failure to plan, manage and monitor the construction phase of the project including

insufficient escape routes from the scaffolding::  fire protection and detection measures not built into the structure along the way:  perimeter of the site not complete where it backed on to the adjoining property resulting in an insecure site

As the building in progress is of timber frame construction, the above failures should be addressed as a priority as operatives on site and members of the public are potentially at risk from the spread of fire on and off the site.

The competent person in charge of the site does not hold the appropriate qualifications.

The inspector completely overlooked major contraventions of statutory legislation that had taken place and were taking place on this site.  Unlawful work was being undertaken on a contaminated site when no work at all should have been taking place.  On the day of the inspector’s visit, ground was being unlawfully excavated and 4 loads of hazardous waste were being unlawfully removed from site (consignment notes in our possession dated 3rd July 2014 and also copy of HSE inspector’s report).  How could Sefton Council and HSE officers have allowed all this when legislation was put in place to stop developers undertaking unlawful activities and contaminating a community? 

We have undertaken a survey of the area surrounding this site, with alarming results of clusters of cancer and respiratory problems which you would not expect in a rural area and the effects of exposure to asbestos have yet to take their toll.  This site is surrounded by housing with 2 primary schools nearby. Young children walking past the site on their way to nearby schools could, in their late teens or early adult life, develop mesothelioma or lung problems due to asbestos exposure.  A lollipop lady is positioned adjacent to the corner of the site to cross children and their parents over this busy main road.  There is a bus stop and bus lay-by opposite the site.  All these people have been exposed to contamination with unlawful work being allowed to take place over a number of years by Sefton Council and HSE Officers.  Residents and the general public have been contaminated and treated like third world citizens in the whole process.   The number of people who have been potentially contaminated is immense. 

 

Southport Road, Lydiate – erection of a double side extension and double rear extension (see blog for full account)

At the beginning of 2013 Sefton Council Planning Officers contrived with developers to force through plans which did not conform to local or national planning policy and contravened building regulations – Part B – building separation - increased fire risk and a planning application form which was fraudulently completed.  Residents on either side objected, basing their objections on the flawed plans and application form which had been put out to public consultation and the MP gave his support to the residents.  This application should have been judged on its merits and would have been refused.

Without going back to public consultation, Sefton Council planning officers requested major material amendments from the developers and approval under officer delegated powers was given to this new plan.  We are saying this is unlawful and not democratic.  This new plan still did not conform to local or national planning policy and contravened building regulations – Part B – building separation - increased fire risk.

A tree in the rear garden (some 60’ high and not shown on the planning application form or the plans) had to be felled and a full asbestos shed had to be removed so that an outbuilding could be erected in the rear garden.  Advice was given by Sefton Council’s building control department concerning the erection of this outbuilding which required planning approval because of its height and position close to the boundary. 

The tree was felled in an extremely dangerous manner by 2 young men employed by the developers  and not one of the builders as later alleged as an excuse for DIY by HSE.  The tree crashed down on the full asbestos shed spreading asbestos debris everywhere.  The builders removed the asbestos debris without observing the Control of Asbestos Regulations, even smashing the asbestos up with hammers.  The asbestos debris was disposed of unlawfully in the builders’ van and later in skips.  Complaints were made to Sefton Council and HSE officers.  It took a week for HSE to come out.  HSE insisted they could not take prosecution proceedings  because  this was DIY.

Building control went out on 4 separate occasions to check the progress of the foundations for the double side extension before they gave building regulations approval over 2 weeks after work had started on site after assuring neighbouring residents, through the MP, his aide and a local councillor,  that no work would take place while negotiations over safety were ongoing.  Unlawful disconnection of the mains gas supply to the building and the gas meter had been undertaken by the builders during this time which building control had overlooked.

The builders then unlawfully reconnected the mains gas supply and re-positioned  the gas meter.  This can only be undertaken by the gas supplier (in this case National Grid).   When we complained, the building control manager refused to investigate and suggested we contacted the gas supplier when it was his duty to do so.

The developers employed an unregistered installer to undertake unlawful internal gas installations, including a gas boiler.  When we had fumes entering our property from the gas boiler flue terminal we contacted Gas Safe who  classed  this boiler installation as immediately dangerous.  We also complained to the Chair of HSE in London because no investigations were taking place and our safety and that of our property was in jeopardy.

We were left in a very dangerous position with unlawfully installed exterior gas installations running alongside our property (only a metre away) and HSE had no intention of investigating either the internal or external gas installations and prosecuting those involved.  Instead of going out and investigating  they were sending letters out to those committing these serious crimes and accepting that they could not remember who was responsible.    Our statements and our evidence were never asked for yet HSE had a copy of the Gas Safe Inspector’s report which confirmed our allegations and which HSE sat on for over 6 months, knowing that our safety was being compromised.

Some of the electrical installations at this extended development came under Part P of the building regulations and, therefore, needed to be notified within 30 days of installation.  The developers were living in the property for over 6 months before these installations were finally notified after neighbours complained.

We are saying that Sefton Council’s building control department are failing to check that installations are undertaken legally and safely and are issuing completion certificates which will cover unlawful installations thus rubber stamping “cowboy” builders’ activities.

2a Moorhey Road, Maghull (see blog for full account)

At the end of 2017 residents in the vicinity of Moorhey Road, Maghull  were experiencing blocked drains.  Various roads were dug up to find the cause of the problem.  Eventually it was discovered that a fairly newly erected property (2a Moorhey Road) had been constructed over a main sewer pipe to the area which went diagonally across the land to a pumping station and the house had now subsided damaging the main sewer pipe.  The residents of 2a Moorhey Road were moved out while their home was repaired and the drainage system re-routed.  The road was blocked off and a temporary pumping station installed.  

This small plot of land had been owned by United Utilities who had sold it off around 2011/12.  Why would a utility company sell off a public asset losing the right of access to the main sewer pipe underneath that land and losing access for maintenance purposes to Melling Brook and Old Alt Brook ?  Who sold off the land and to whom?  This needs investigating.

The new owner then applied for planning permission to erect a detached property and the planning application form states that the applicant sought pre-application advice from Sefton Council’s Planning Department.  Why did Sefton Council  planning officers accept this planning application and give advice when officers were well aware that a pumping station was adjacent to the  land and maps of the area clearly showed the layout of the main sewerage pipework across this land?   They were also well aware that building regulations stipulate that main drains cannot be built over.  Why did Sefton Council planning officers then recommend this application for approval?

There is no record of United Utilities being consulted about the planning application or Sefton Council’s own drainage department being consulted.  There is no record of a planning committee site visit.  The Environment Agency was consulted over access to Melling Brook and Old Alt Brook and voiced their objections.  Nearby residents objected with a petition and stated this was an unsuitable location adjacent to a pumping station and expressed concerns about lack of access to the main drainage pipe.  Residents also asked how would the Environment Agency access the brook?  A planning committee had been misled and information withheld from them.   There were officers and experienced councillors present at the planning committee meeting who were aware of all the implications involved in approving this application, why didn’t someone speak up and query what was happening?

In 2013 the land was advertised as a cleared site offered with the benefit of full planning permission to erect a 4 bedroomed detached property and was sold off  in auction, with the owners making a considerable profit on the transaction.

These are not mistakes but blatant corrupt practices which have been brought to light because the property has subsided over the main sewerage system and the public will be paying the bill to rectify all the damage.   This needs investigating by an independent body and those involved should be made accountable for what has happened.   


No comments:

Post a Comment

Illegal Waste Site Formby

 Retrospective Planning Applications DC/2020/0098 and DC/2020/02197 This site (in the green belt and on a flood plain) had been heavily pr...