Saville Road, Lydiate (see blog for full account)
On
Friday, 31st January 2020 on a contaminated site intended for housing at Saville
Road, Lydiate developers employed an
unqualified youngster from a recruitment agency to undertake unlawful
demolition when none of the pre-commencement of development contaminated land
conditions under Part IIA of the Environmental Protection Act had been
discharged and no work whatever should have been taking place. The developers had not produced a notice of
intended demolition, a demolition asbestos survey and method statement on how
contamination was to be dealt with. The
developers had also failed to submit a HSE F10 notification form under the
Construction Design and Management Regulations (CDM). It is a legal requirement that all this
documentation must be produced before demolition is allowed. Developers were fully aware of their legal
requirements and Sefton Council and HSE officers were well aware that the
developers had not complied with these legal requirements.
The young
man was working on site unsupervised and was smashing down with a sledgehammer
garages and their asbestos roofs simultaneously. He had no protective clothing or a mask and
was unaware that asbestos was involved, having been told the roofs were cement
based. He was exposing himself to
contamination, as well as residents and anyone he came in contact with when
leaving the site and going home with asbestos dust all over his clothing. Residents told him what he was doing was
dangerous and unlawful and advised him to stop work and leave the site
immediately which he did, locking the site gate behind him. Developers had exploited this young man and
he should not have been put into such a dangerous situation on a contaminated
site. There was no scaffolding or
welfare facilities on site, there were no demolition or asbestos removal signs
displayed. Residents had not been
notified that demolition was to take place.
The site
(in a densely populated area and surrounded by housing) was in an appalling
dangerous condition. Asbestos debris was
strewn everywhere and mixed with blocks and bricks from the garage structures
and also some of the contaminative contents of the garages (which the young man
had removed earlier). There were fires, boilers,
boiler parts, various boiler flue parts, baths. Insulation material, plastic
tanks, metal and plastic drums some of which were made of asbestos and some of
which contained asbestos material and other contaminants which had not been
identified but were all now contaminated with asbestos debris from the
roofs. This is contrary to the Control of Asbestos Regulations and
unlawful. Before demolition can be contemplated,
asbestos and any other contaminants have to be removed safely and legally by
suitably qualified personnel. . About one third of the buildings had been
unlawfully smashed down and the remaining buildings were structurally dangerous
with pieces of asbestos loose and hanging from the roofs. The site’s dangerous condition is shown in
residents’ photographs and in an article published in the “Liverpool
Echo”.
Everything
on site was now contaminated. A
relatively straightforward procedure of removing asbestos safely and lawfully
had escalated into an environmental catastrophe which a Sefton Council officer
had warned against in a report to Planning Committee in August 2019 if asbestos
was not dealt with correctly. The developers had
chosen the cheapest and most dangerous way to demolish the buildings without
following any leglisatlion imposed on them and in so doing had exposed a
community and a young man to life-threatening contamination.
When
residents and their councillors complained on the morning of 31st
January 2020 that a community was being
exposed to contamination from asbestos, Sefton Council and HSE officers should
have come out immediately, stopped the site, made it safe and prosecuted those
involved. This would have limited a community’s
exposure to life-threatening contamination and suitably qualified personnel
could have been brought in to clean up the site safely and legally.
Sefton
Council and HSE officers had no intention of stopping this unlawful
demolition. A Sefton Council officer had
advised the ward councillor when she had complained on
31st January that Sefton Council intended issuing a
retrospective demolition notice and a building control officer would be
visiting the site on Monday, 3rd February. We have an email
received on 5th February from HSE who had not been in contact with
complainants and were now refusing to comply with their legal responsibilities
and passing us back to Sefton Council who had directed us to HSE on 31st
January. If officers had come out
when residents first complained, they would have caught the young man
unlawfully demolishing the buildings with the asbestos in situ and they would
have had to investigate what they had seen which officers wished to avoid. Such investigations would have exposed
corrupt practices which had been going on for some considerable time involving
other sites with the full knowledge of Sefton Council and HSE officers. Instead of reacting to complaints, Sefton Council
officers redirected complainants to HSE giving developers time to fabricate a ludicrous story of travellers occupying the site and
being responsible for the damage to the buildings. Officers were quick to accept this story and
did not interview residents or their councillor who had witnessed unlawful
demolition commencing on site and had photographic evidence to disprove the
developers’ allegations. A Freedom of
Information request to the Police confirms no complaints of travellers
occupying this site.
On
Monday, 3rd February on the
pretext that they were “only tidying up the site to make it safe” alleging that
travellers were responsible for the appalling dangerous condition of the site,
these same developers employing 2 different unqualified workmen, were then
allowed by Sefton Council and HSE officers to continue unlawful demolition with
the asbestos still in situ which residents’ photographs taken on a daily basis
prove. They were also aggravating the
situation by moving contaminated building debris around the site and putting
some of it into skips to be removed later from site. When unlawful demolition was well underway, with
approximately half the buildings knocked down with the asbestos still in situ
and in the absence of a demolition asbestos survey and a method statement, 6
days later (on 6th February 2020) Sefton Council officers then unlawfully issued
the council’s retrospective notice of intended demolition, giving developers a
green light to continue their unlawful activities.
We have
since discovered from a HSE letter dated 4th March 2020 to the ward councillor
that a HSE inspector visited the site on 31st January and found the site
secure. (This must have been in the aftenoon and some time after residents had
already stopped the site and the young man had locked the site gate before
going home). The inspector reported that
he could see demolition had taken place and was concerned about the structural
stability of the remaining buildings. He
would have seen the appalling dangerous condition of the site as already described. Why didn’t he stop the site, make it safe and
call in suitably qualified professionals who could handle this dangerous
situation? HSE is our national safety body and their
inspector as a safety officer had the power to take enforcement action to
protect residents against these unlawful reckless developers but he allowed
unlawful demolition to continue. Why had HSE sent out an inspector on 31st January
when in an email to the ward councillor received on 5th February
they say “In this case, although HSE do
have enforcement responsibilities for these premises, the LA have
responsibility to enforce the issues you have raised relating to dust and
members of the public, therefore your concerns should be directed to them.”
HSE
allege the inspector visited the site
again on 8th February which was a Saturday and outside his normal working hours. Why had HSE sent the inspector out again when HSE had no
intention of stopping the site and making it safe? Was this visit under instructions from HSE’s
Chief Executive to whom 6 borough councillors and 2 parish councillors had
complained on 5th February?
By 8th February
between two-thirds and three-quarters of the buildings were down, with the
asbestos still on the buildings and the condition of the site had
deteriorated. He could see that unlawful
demolition had progressed from his visit on 31st January with the
same developers involved but he still did not stop the site or make it
safe. He then contacted the local
authority building control to alert them to the potentially dangerous
structures. This is the same building
control department who had unlawfully issued a retrospective demolition notice
on 6th February when there was no demolition asbestos survey or method
statement and when the pre-commencement of development contaminated land
conditions had not been discharged..
Building control had already visited the site on 3rd February and again
on 5th February but had allowed unlawful demolition to
continue.
Around
10th February the HSE inspector met one of the developers on
site. He found there had been no asbestos survey and there
were issues with the way the clean-up work had taken place. He also
established that there was no welfare on site.
The Inspector had witnessed the progress of this unlawful work on
various dates from 31st January onwards. By now three-quarters of
the buildings were down. The other quarter of the buildings still had
asbestos on them and he had said the structures were dangerous. The site
was littered with the contents of the buildings and building debris (including
asbestos). He had now established there was no demolition asbestos survey
and must have known there was no HSE CDM in place which is a legal
requirement. Why was he
allowing unlawful demolition to continue in a dangerous contaminative manner,
not stopping the site and making it safe when residents and the general public
were being contaminated?
We know
from extracts received recently of Sefton Council officer reports that on
10th February (10 days after residents had first complained on
31st January) a building control officer had conversation with
an officer from HSE (presumably the first HSE Inspector) who confirmed they
would be taking a lead in terms of dealing with any potential asbestos contamination
issue. The inspector had visited the site on 3
occasions and failed to do his legal duty to protect a community and workers on
site from exposure to contamination, allowing the same developers to continue
unlawful demolition.
It was
not until 20th February (10 days after the first Inspector’s visit) when the
remaining buildings had all been allowed to be demolished with the asbestos in
situ, that a second HSE Inspector visited the site. HSE allege the first
inspector was not available. Had the first inspector been removed from the case because he
was finally going to take enforcement action when HSE had allowed unlawful
demolition to continue in the absence of any legal documentation? HSE
allege the second Inspector reviewed all
the concerns and the proposed enforcement actions. This Inspector had given the
developers time to complete unlawful demolition and remove some of the
contaminated material from site in skips. On 20th February residents'
photographs show the site in an appalling condition and this Inspector would
have seen this. Contaminated rubbish was still strewn over the site mixed
with building rubbish, including blocks and bricks and a considerable amount of
asbestos debris in various sizes mixed amongst this rubbish. Wrapped and
taped asbestos lay on the ground, too big and too heavy to be loaded into the
skip. A later video dated 17th March shows how this asbestos was
man-handled into the skips. The inspector failed
to mention the dangerous condition of the site with asbestos strewn
everywhere.
This
second Inspector had already reviewed the first Inspector's report. The
second inspector confirmed that there was no asbestos survey and the
developers had not complied with the Construction Design and Management
Regulations. The inspector served an Improvement Notice for an asbestos
assessment and a plan of work for the remaining clearance work and a Notice of
Contravention for compliance with the Construction Design and Management Regulations.
The developer agreed to stop work until he had carried out an asbestos survey.
The Inspector stopped the site but in a telephone conversation to one of the
ward councillors said I am allowing the developers to remove blocks from
site. These blocks will have been contaminated with the asbestos debris
and residents observed the blocks being picked up in an open truck with grabbers parked on Saville Road itself (a public road).
Residents have photographs of asbestos debris subsequently dropped outside the
site perimeter in Saville Road. The developers had achieved what they had set out to do. To demolish the buildings in the cheapest way
possible without following any legislation imposed on them and on this site and
in so doing had exposed a community and workers on site to life threatening
contamination. From 31st
January residents and their councillors had continually asked both Sefton
Council and HSE officers to stop the site and make it safe but their concerns
were ignored.
We
submitted a Freedom of Information (FOI) request to HSE at the end of April for
all information relating to Saville Road. HSE have declined to provide
this information, saying it is not in the public interest for this information
to be released and they are still investigating the incident. How can HSE conduct
any investigation when they are implicated by allowing developers to work
unlawfully on a contaminated site without complying with any legislation
imposed on them and when they haven’t interviewed the witnesses
(residents and councillors) or asked for their evidence? We have
challenged this and HSE are now undertaking an internal review which has been
going on since May and we have still not received the outcome of this review or
more importantly the information requested despite numerous prompts to HSE on 6th
and 29th July and again on 12th October 2020.
We contacted
the Information Commissioner on 9th November in an attempt to obtain
this information. On 30th
November, the Information Commissioner wrote to HSE giving them a deadline of
10 working days to respond to us with the outcome of the internal review. We have heard nothing from HSE and it is now 18th
January 2021. In a letter to us on 30th
November, ICO state that they have now closed the case. On 17th December we emailed ICO
asking them to keep the case open and seek all the information we have
requested. Why have ICO closed the case
when HSE have not responded to the deadline given by ICO? ICO replied to us on 17th December
that there is a waiting time of approximately 4 months for our case to be
allocated to a case officer. We are being sent around in circles once
more. We know HSE are unable to give us
the various reports and information requested because this information will
condemn them as law breakers but we expect ICO to
insist HSE provide us with information we have a right to access.
Sefton
Council officers also made visits to the site.
3rd
February – a planning enforcement officer:
3rd, 5th
and 10th February – a building control officer
10th and
11th February – an environmental protection enforcement officer
but none
of these officers carried out their legal duty to protect the community. They were all well aware that no work should
have been taking place because contamination had not been addressed through the
legal process.
We have a copy of the environmental protection
enforcement officer’s report to our MP on 11th February which
contains many comments which are untrue and conflicts with residents’
photographs taken on a daily basis and the HSE Inspector’s observations. .
Around
this time the site was in its worst condition.
Three-quarters of the buildings had already been allowed by Sefton
Council and HSE officers to be smashed down with the asbestos still on them and
the officer could see that the remaining quarter were structurally dangerous
with unsupported pieces of asbestos debris hanging down from the roofs. The site was littered with asbestos debris
mixed with blocks and bricks and the contents of the garages.
The
officer was misleading the MP and residents and implying that correct
procedures were being undertaken. He was well aware but had failed to mention that none of the pre-commencement
of development contaminated land conditions imposed on the site under Part IIA
of the Environmental Protection Act had been discharged. No development/demolition could take place
until all contamination, including asbestos, had been assessed and removed
safely and legally. This is an officer
employed to protect residents and enforce the laws imposed on this site. He was actually condoning the developers’
unlawful activities and enabling them to continue contaminating a community He was protecting Sefton Council and himself
from prosecution and misleading the MP and residents. This officer has a history of misleading
residents who complain about being exposed to contamination. He says Sefton Council officers have
contacted HSE but they can’t guarantee HSE will visit the site, We now
know that a HSE officer had already visited the site and was concerned about
the structural stability of the buildings.
He had also spoken with a Sefton Council building control officer and
informed him that HSE would be taking a lead in terms of any potential asbestos
contamination
The
environmental enforcement officer also says his department was not sure if
asbestos was involved which again was untrue.
Sefton Council officers were well aware that asbestos was present. The Environmental Health Manager from this
officer’s own department in his comments to planning committee in August 2019
had stressed that appropriate investigation and mitigation was required
including an asbestos survey to ensure no ground contamination occurs during
the demolition process. We have had a
report undertaken by asbestos specialists which confirms the presence of
asbestos and also details all the contraventions of the Control of Asbestos
Regulations on this site.
From 31st
January Sefton Council and HSE officers had been responsible for allowing
unlawful demolition to proceed in a very dangerous manner and for residents to
be exposed to contamination for 10 days.
Now this officer was allowing unlawful demolition to continue without
any assessments of contamination in or on the garage buildings and without any documentation
in place, including a demolition asbestos survey and for a community to be
contaminated. Throughout this time
residents and their councillors were continually asking Sefton Council and HSE
Chief Executives to stop the site and make it safe because residents were being
exposed to contamination and were fearful for their lives and the lives of
their children with unqualified workmen operating unlawfully on a contaminated
site.
Former
Lydiate Barn Nurseries and Garden Centre (see blog for full account)
The ward
councillor was contacted by a neighbouring resident who asked her to “call-in”
2 planning applications for this site (which was in the green belt) so that
they could be considered by a planning
committee instead of Sefton Council
planning officers under delegated powers.
The resident was concerned that
his right of way was being removed by developers of the adjacent housing
development because construction of all 7 properties was underway which did not
conform to the approved site layout. The
developers had purposely contravened the approved plans and site layout to
accommodate an extra dwelling. This extra dwelling was at the front of the site and would
set a precedent if there were to be a second phase of development in the green
belt. After the neighbouring
resident had contacted Sefton Council’s planning department unlawful work had
been halted. The developers had then
submitted these 2 planning applications, one application for a new site layout
(already under construction) and one application for an additional dwelling. Both applications were recommended by Sefton
Council officers for approval.
Developers shouldn’t be given development rights when they have
contravened the laws of this land.
When the
ward councillor checked the planning portal she found far more serious
contraventions had occurred which affected residents’ health and safety. Because of past uses of the land,
pre-commencement of development contaminated land conditions under Part IIA of
the Environmental Protection Act had been imposed on the site and none of these
contaminated land conditions had been discharged This meant that no development (which
includes demolition and site clearance) should have taken place. Under Part IIA these contaminated land
conditions are imposed on developments to protect existing and future
residents, the general public and workers on site from exposure to
contamination. Planning approval is
given subject to these conditions being discharged in a legally structured
manner by way of submission of planning applications. Sefton Council
officers were well aware that none of these contaminated land conditions had
been discharged.
Unlawful
demolition of existing buildings on site which in themselves would have
contained contaminants had taken place and the site had been cleared. The
land had been excavated and foundations constructed with associated brickwork
for all 7 properties. Drains had been excavated and constructed.
There were mounds of excavated contaminated soil in various locations over the
site and one mound intruded into the additional plot for which planning
approval was sought. This is all contrary to Part IIA of the
Environmental Protection Act.
Development cannot take place until the site has been remediated (cleared of contamination). Why had Sefton Council officers allowed all
this to take place? Had building control
been out and checked these foundations knowing full well that no development
should have been taking place or had the developers gone ahead without
clearance? Planning approval should
have been withdrawn and the developers should have been prosecuted.
A
planning committee meeting was held remotely via Microsoft Teams on Wednesday,
10th June 2020. A virtual site visit had been held on Monday, 8th
June. On both occasions, photographs were presented of the site not as
described above but as it was several years ago showing the former garden
centre. The ward councillor had emailed photographs to Sefton Council
officers showing the present condition of the site with the foundations for the
properties in place but officers had refused to include these photographs with
her statement. Vital information was being withheld from the planning
committee which proved that unlawful development had already taken place. This was a new plan which the developers had
already started constructing. This was
not a variation of an old plan which Sefton Council officers wanted everyone to
believe because officers would be admitting that development had taken place
and no enforcement action had been taken against the developers.
The ward councillor was not
allowed to speak at committee and neither was the petitioner. Their
statements were read out by a planning officer. A late petition of
25 affected residents was not allowed to be included with committee papers nor
its contents read out to the committee.
From the discussion that followed on the pre-commencement of development
contaminated land conditions, it was apparent that Sefton Council officers
didn’t want this issue brought into the discussions and information was being
purposely withheld from the committee.
In view of the total disregard of planning law and Part IIA of the
Environmental Protection Act by these developers, a full debate needed to take
place and the planning committee should have been made aware of this site’s
particular circumstances. The council’s
solicitor who was present also needed to be involved.
An
independent councillor (who was a member
of the planning committee) asked the planning officer to confirm that
remediation of land must be agreed with the local planning authority and
documentation discharged prior to the commencement of works. The planning officer avoided answering the
question directly and provided information that was not relevant. He
suggested getting advice from the environmental health officer. The Independent councillor then asked the
environmental health officer to confirm that an offence by a breach of
the Environmental Protection Act had been committed on this site by commencing
development. The environmental health
officer failed to answer the question correctly and some 6 minutes was spent
avoiding the question and side-stepping the very serious issues. It was only when the Independent councillor
refused to accept the answer and repeated his assertion that an offence had
been committed that the Head of Planning was forced to intervene and conceded
that the councillor was right. (see video in main blog.)
Planning
approval was being forced through by Sefton Council officers who had stifled
debate, withheld vital information and misled a planning committee.
Developers
had contravened Part IIA of the Environmental Protection Act with a risk of
exposure to contamination not only to residents, the general public and workers
on site but also future residents. These
developers were now being rewarded with planning permission for an unlawfully
constructed development and an extra dwelling in the green belt. A show of hands by a planning committee who
have been duped does not override the laws of our land. Once again developers have not been
prosecuted and allowed to contravene planning law, the Building Act and Part
IIA of the Environmental Protection Act thereby contaminating a community.
Unlawful
Waste Recycling Plant Formby Merseyside - Land to the South of Formby
Industrial Estate (see blog for full account)
On 23rd
April 2020 a local ward councillor reported earthworks on green belt land and
functional flood plain, on land to the south of Formby Industrial Estate. During an extensive Public Inquiry this land
had been rejected for development in Sefton’s
Local Plan and Formby and Little Altcar’s Neighbourhood Plan, despite
Sefton Council officers heavily promoting this area for development.
On 29th
April a Sefton Council officer advised that a member of the planning
enforcement team had been out to site and noted that some earth had been
cleared back and small bunds formed. An
individual on site tried to claim that planning permission had been given for
the work carried out. The Sefton Council
officer was awaiting further information from the landowner before determining
if planning permission was required.
On 17th
May the ward councillor once again contacted Sefton Council officers because
there was increased activity on site and the arrival of heavy machinery. The area under development had now become
considerably larger. The ward councillor
requested that action be taken to establish the intent of the land owner. Around this time mobile plant, in particular
a waste/earth screen machine was brought to site.
Mobile
plant and specifically waste screening machines require permits because of
their ability to create dust from the screening process and the large mounds of
contaminated soil and other materials they produce. This is considered a statutory nuisance under
Part III section 79 of the Environmental Protection Act and Sefton Council
Officers have a statutory duty to police these activities. Indeed Local Authorities must give prior
written approval for processes under their control. This includes permits for mobile crushing and
screening equipment.
On 20th
May Sefton Council’s planning manager replied that officers had met with the
site owner at Formby Football Club the previous week to discuss the situation
on the site. Sefton Council understand
that there may have been some meetings about development of the site (new
clubhouse, community hub, etc) and an application Is being prepared for the
near future. The works on site are in
connection with drainage repair works which have now been completed. The mounds will need to be levelled back
across the area where the works have taken place as the mounds themselves
constitute development for which planning permission is required.
Separately
the company who undertook the drainage repairs have set up a small compound on
the site and are operating their business from this location (storage of
materials/equipment, etc.). Sefton
Council officers have advised this is a change of use of the land for which
planning permission is required. As this
is green belt land, a permanent approval would not be granted. However, a temporary permission may be
possible, potentially linked to the site owner being able to demonstrate how
such a temporary use might be able to assist the retention of the football
club, a valued local community asset.
Advice given was for the company to either cease the use and clear all
the equipment, materials, etc. or alternatively apply for temporary permission. Specifically the landowner was asked to level
the mounds as a first step.
On 20th
May Formby Parish Council formally complained to Sefton Council’s head of
planning at the lack of enforcement action and the failure in the statutory
duty of the local planning authority to uphold national planning policy, Sefton
Council’s Local Plan and Formby and Little Altcar’s Neighbourhood Plan
policy. Far from putting pressure on the
landowner to comply the local planning authority seemed to be doing just the opposite
and creating an environment for this unlawful activity to continue.
On 9th
June Formby Parish Council complained to Sefton Council’s monitoring officer
formally about Sefton Council’s planning officers’ failure in their statutory
duty to address adequately the unlawful development.
On 1st
July the Parish Council’s complaint was rejected by the Head of Planning. He pointed out that officers were out on to
site relatively quickly but failed to mention how swiftly officers bought into
the story that the works were associated with drainage. He also asserted that the landowner advised
the enforcement officer he had obtained an environmental permit to carry out
this work. Planning services have
notified the local lead flooding authority (in this case Sefton Council) who
will advise the Environment Agency of work carried out and they can check that
the appropriate consent has been granted.
He concluded by saying that an application has now been submitted for a
Construction Waste Recycling Centre within the Formby Football Club site though
further information is awaited so the application is not yet valid.
On the
5th of August 2020 retrospective planning application DC/2020/00986 was
validated by Sefton Council for the ‘Use of the land as a Construction Waste
Recycling Centre’. The application was
for facilities to recycle construction, demolition and excavation waste. The
site according to this application was 0.35ha, however mounds of building waste
and rubble infill covered at least 1.5ha of land. It had been clear for some time that the company
occupying the land had been running an illegal waste recycling business. Now however it was impossible for Sefton
Council officers to be agnostic about the matter. At this point instead of putting a stop to
this illegal activity planning officers allowed it to continue without questioning the origins of the waste and whether it
was contaminated. There could be any
number of contaminative substances harmful to humans in
this waste. The site is adjacent to
football pitches, a Tesco superstore with large car park, a recycling centre
and an industrial estate.
The
treatment and transfer of waste is a highly regulated industry, waste treatment
and recycling operations require permits.
Some are issued by the Environment Agency such as waste operation permits
(those needed for recycling of construction waste), and others like the waste
screening machine (mobile Plant) used on this site, require permits issued by
the Local Authority. It is an offence to
operate a regulated facility without a relevant permit, punishable by up to 5
years imprisonment or £50,000 fine. In
order to obtain a mobile Plant permit the applicant must provide their name,
address, the location of the site and full details of relevant planning permissions. Along with this, a description of waste and
its intended final use, complete with the relevant fee. Of course this site does not have the
required planning permission.
On 16th
September 2020 the planning case officer issued his report and recommendation
to refuse retrospective planning permission.
The Environment Agency (EA) was formally consulted on this application
and the officer’s report records the EA view that there was “insufficient
information provided to assess the impacts of and to the development. This is
particularly in reference to the absence of the Surface Water Drainage
Strategy, as mentioned within the Flood Risk Assessment”.
Also of
note is the lack of response from Sefton’s Environmental team, merely stating
“No objection subject to conditions relating to the control of dust from the
site”. A brief check of the Environment
Agency Public register https://environment.data.gov.uk/public-register/view/index clearly
shows that the company listing its business address onsite does not have a
permit for handling construction waste and Sefton’s Environmental Team are
responsible for policing the illegal tipping and processing of waste, checking
transfer notes and ensuring compliance with the law. Without a site permit none of the
consignments brought to and processed onsite can have been done so
legally. Yet this does not seem to have
caused as much as a raised eyebrow?
The Local
Lead Flood Authority (Sefton Council) confines its comments to the substantial
flaws in the Flood Risk Assessment (FRA).
However in England and Wales a
flood defence consent is required from the Local Lead Flood Authority for consent to carry out works within 10m of
a watercourse, and an application must include, plans, sections and details
including any environmental mitigation measures. Under the Water Resource Act it is an
offence to knowingly permit the pollution of controlled waters, this includes
groundwater and local rivers and watercourses.
Stockpiled materials should be stored away from watercourses and
protections should used to prevent
discharge such as geotextile membranes.
All of these regulations had been flouted in the months leading up to
the submission of the retrospective application. It was clear that much of what had occurred
amounted to environmental crimes carrying substantial fines and/or a
significant time in gaol, but Sefton Council treat the matter in the same
manner as sticking a small shed on the green belt!
On 8th
October the ward councillor emailed the head of planning and also building
control complaining that she had
observed several very large lorries entering the site with rubble etc followed
by a succession of smaller vehicles with trailers. She asked Sefton Council
officers to issue a stop notice or explain fully why they were refusing to do
so. This business is being run
illegally. Recycling building waste is a
very regulated industry and they cannot have the required licences and permits,
and similarly the large lorries cannot have the required permits to dispose of
the waste. Who is checking this waste
for no contaminants? If it was a legal
site they would require an approved
flood risk assessment and planning permission which they do not have.
The amount of material arriving at site is accelerating and we are currently on
a flood alert for the river Alt, with this material occupying large amounts of
the flood plain
On 9th
October the planning enforcement officer replied “I would advise that from a
planning point of view the use of the land is not illegal. It is important to
clarify that to carry out development or use land without the necessary
planning permission in place is not illegal. It is a criminal offence not to
comply with an enforcement notice however at this stage we are still within the
compliance period for the enforcement notice that has been served. The importation of material and waste
carrying permits is something which is regulated by the Environment Agency. It
would be a matter for the Environment Agency to determine if the waste
recycling operation being carried out is operating in accordance with their
waste permits”.
The head
of planning continued to excuse the inactivity of his officers by asserting
that the officers informed the company that had begun unlawful development to
either restore the land to its previous condition and remove the vehicles
stored onsite or apply for planning permission.
Former
Mayflower Industrial Estate, Formby (see blog for full account)
In 2017
at the former Mayflower Industrial Estate in Formby, nearby residents
complained to both Sefton Council and HSE officers that they were being exposed
to asbestos contamination from demolition. Once again the site was not
stopped and made safe. There were pre-commencement of development
contaminated land conditions imposed on the development which had not been
discharged. This meant that no work whatever could take place.
These contaminated land conditions were not discharged until 5th April
2018 which would permit remediation only to be undertaken and were discharged
simultaneously when each condition must be satisfied in order prior to
progressing to the next in the sequence.
From
February 2017 to April 2018 the following had taken place:-
Unlawful
demolition
A machine
brought on to site to crush demolition debris spreading contaminated dust and
further contaminating residents.
Severe
dust contamination lay on outdoor furniture at properties backing on to the
site (residents submitted photographs to Sefton Council’s Environmental
Protection Department).
Cars
further from the site were also covered in contaminated dust.
Demolition
debris (crushed on site) was stacked some 20 ft high. How could Sefton Council officers allow
demolition debris from buildings which contained asbestos and other
contaminants to be crushed on site when a permit could not be issued because
the pre-commencement of development contaminated land conditions had not been
discharged.
A Sefton
Council officer came out on to site and instructed the developers to reduce the
size of this mound. He took photographs but the site was not stopped and made
safe in contravention of Part IIA contaminated land conditions.
Contaminated
soil being excavated and dumped on top of crushed demolition debris (as shown
by residents photographs)
Unlawful
work had been continuing on a contaminated site when none of the
pre-commencement of development contaminated land conditions had been
discharged. In October 2017 the
developers had then submitted one planning application to discharge all 3
pre-commencement of development contaminated land conditions retrospectively
which is totally against Part IIA of the Environmental Protection Act.
The
ward councillor had previously tried to stop the site to protect residents from
exposure to contamination which Sefton Council officers had refused to do. Officers were now aiding and abetting corrupt
practices by accepting this retrospective planning application and were
intending to give approval under delegated powers.
The
only course of action now open to the ward councillor was to remove officer
delegated powers and put this planning application into a planning committee
(“calling-in” this application) so that discussion could take place concerning
the developers’ total contempt of the law and the cover-up by Sefton Council
officers. The ward councillor’s request
for a “call-in” was refused by the same officers involved in the cover-up with
the excuse that these were technical matters.
.All 3 contaminated land conditions were finally discharged on 5th
April 2018 under delegated powers after Sefton Council’s constitution had been
amended on 25th January 2018 with the assistance of the ruling
political party with the recommendation that applications to vary or remove conditions
are not considered by planning committee thus preventing councillors from
“calling-in” applications to discharge conditions. We are saying approval of pre-commencement of
development contaminated land conditions imposed under Part IIA of the Environmental
Protection Act are not technical matters but acknowledgement of compliance with
legislation. The laws of our land cannot
be overridden by a local council’s constitution.
Corrupt
practices have to be stopped and those responsible (developers and public
servants) made to face the consequences.
2005 –
44,000 cu metres of contaminated soil sold off for landscaping purposes
Going
back to 2005 the BBC and the Environment Agency investigated the owner of a
Southport waste transfer station who had sold off 44,000 cu metres of
contaminated soil containing white, brown and blue asbestos for landscaping
purposes on a nature reserve in Scarisbrick Lancashire (http://news.bbc.co.uk/1/hi/magazine/4457663.stm). Over a period of time residents had observed and reported
suspicious behaviour with tractors dumping this dangerous hazardous material on
to the site which must have come from contaminated sites similar to the ones
detailed in this blog. Why wasn’t he prosecuted? Why wasn’t
he prevented from working with hazardous waste ever again? Was the nature
reserve ever made safe? If not, it is now a contaminated site. Were
the origins of this hazardous waste ever traced? Were the authorities
ever investigated for allowing this to happen?
Former
Daverick Motors Site, Lydiate (see blog for full account)
The individual
investigated in 2005 was caught once again by residents. This time in 2013 in Lydiate when his
demolition company was responsible for undertaking unlawful demolition on a
contaminated site intended for housing.
Residents complained about exposure to contamination to Sefton Council
and HSE officers. Pre-commencement of development contaminated land
conditions which had been imposed on the development had not been
discharged. No work, including demolition, could take place. Sefton
Council officers should have come out, stopped the site, made it safe and taken
prosecution proceedings.
The site
was not stopped and his company was allowed to complete unlawful demolition
over a 3 day period without any demolition documentation in place. There
had been no assessments of contamination (a demolition asbestos survey) and no
method statement produced prior to unlawful demolition.. When the
buildings were down, Sefton Council officers issued their notice of intended
demolition and withheld notice to residents. Sefton Council officers have
acted unlawfully in so doing. If officers had performed their legal duty
when residents first complained, residents’ exposure to contamination would
have been limited to several hours only. The site continued to operate
unlawfully throughout 2013 and 2014 with contaminated soil being excavated
during this time, exposing residents to further contamination. Another of
this man’s companies was removing hazardous waste from site between 22nd May
and 3rd July 2014 before a remediation strategy was agreed on 2nd
September 2014 (see report in blog).
When
contaminated land conditions were eventually discharged in September 2014 with
the submission of a remediation strategy which would permit remediation only to
be undertaken, the following had already occurred between January 2013 and
September 2014 with the full knowledge of Sefton Council and HSE officers:-
unlawful
demolition
unlawful
removal from site of 1640 kgs (over 1½ tonnes) of hazardous waste containing
asbestos
doctoring
of the land using tractors (to avoid suspicion as in 2005) to remove
contaminated soil and import soil on to site
unlawful
excavation of foundations and unlawful construction of houses on a contaminated
site at the same time as hazardous waste was being unlawfully excavated and
unlawfully removed from site over a period of six weeks from 22nd
May to 3rd July 2014. We have
consignment notes in our possession dated 22nd May to 3rd
July 2014 for 48 loads only. Where are
the consignment notes for the excavated contaminated soil removed in early
April so that foundations could be laid for the first properties? Had building control been out and checked
these foundations knowing full well that no development should have been taking
place or had the developers gone ahead without building control clearance?
We have
documents showing that a Sefton Council monitoring officer visited the site in
May 2014 and asked the developers what was being followed on site. The
officer noted that all the buildings had gone and a house had been built when a
remediation strategy had not been agreed. She was aware that Part IIA
contaminated land conditions were not being followed and what was happening on
site was unlawful. The site was not
stopped and the developers were allowed by Sefton Council officers to continue
their unlawful activities.
In July
2014 a HSE inspector visited the site when house
construction was underway. This is the same HSE inspector involved with many of
the other sites in this blog. Why was a HSE inspector now out on site? This was some 18 months after HSE had failed
to react to residents' complaints about exposure contamination on 29th
January 2013 and when HSE knew there was no documentation in place under the
HSE Construction Design and Management Regulations (CDM).
The
inspector issued a contravention notice for various
health and safety contraventions:-
Failure
to provide suitable and sufficient welfare facilities
Failure
to plan, manage and monitor the construction phase of the project including
insufficient escape routes from the
scaffolding:: fire protection and
detection measures not built into the structure along the way: perimeter of the site not complete where it
backed on to the adjoining property resulting in an insecure site
As the building in progress is of timber
frame construction, the above failures should be addressed as a priority as
operatives on site and members of the public are potentially at risk from the
spread of fire on and off the site.
The
competent person in charge of the site does not hold the appropriate
qualifications.
The
inspector completely overlooked major contraventions of statutory legislation
that had taken place and were taking place on this site. Unlawful work
was being undertaken on a contaminated site when no work at all should have
been taking place. On the day of the inspector’s visit, ground was being
unlawfully excavated and 4 loads of hazardous waste were being unlawfully
removed from site (consignment notes in our possession dated 3rd July 2014 and
also copy of HSE inspector’s report). How could Sefton Council and HSE
officers have allowed all this when legislation was put in place to stop
developers undertaking unlawful activities and contaminating a community?
We have
undertaken a survey of the area surrounding this site, with alarming results of
clusters of cancer and respiratory problems which you would not expect in a
rural area and the effects of exposure to asbestos have yet to take their
toll. This site is surrounded by housing with 2 primary schools
nearby. Young children walking past the site on their way to nearby
schools could, in their late teens or early adult life, develop mesothelioma or
lung problems due to asbestos exposure. A lollipop lady is
positioned adjacent to the corner of the site to cross children and their
parents over this busy main road. There is a bus stop and bus lay-by
opposite the site. All these people have been exposed to contamination
with unlawful work being allowed to take place over a number of years by Sefton
Council and HSE Officers. Residents and the general public have been
contaminated and treated like third world citizens in the whole
process. The number of people who have been potentially
contaminated is immense.
Southport
Road, Lydiate – erection of a double side extension and double rear extension
(see blog for full account)
At the
beginning of 2013 Sefton Council Planning Officers contrived with developers to force through
plans which did not conform to local or national planning policy and
contravened building regulations – Part B – building separation - increased
fire risk and a planning application form which was fraudulently completed. Residents on either side objected, basing
their objections on the flawed plans and application form which had been put
out to public consultation and the MP gave his support to the residents. This application should have been judged on
its merits and would have been refused.
Without
going back to public consultation, Sefton Council planning officers requested
major material amendments from the developers and approval under officer
delegated powers was given to this new plan.
We are saying this is unlawful and not democratic. This new plan still did not conform to local
or national planning policy and contravened building regulations – Part B –
building separation - increased fire risk.
A tree in
the rear garden (some 60’ high and not shown on the planning application form
or the plans) had to be felled and a full asbestos shed had to be removed so
that an outbuilding could be erected in the rear garden. Advice was
given by Sefton Council’s building control department concerning the erection
of this outbuilding which required planning approval because of its height and
position close to the boundary.
The tree
was felled in an extremely dangerous manner by 2 young men employed by the
developers and not one of the builders
as later alleged as an excuse for DIY by HSE.
The tree crashed down on the full asbestos shed spreading asbestos
debris everywhere. The builders removed
the asbestos debris without observing the Control of Asbestos Regulations, even
smashing the asbestos up with hammers. The asbestos debris was
disposed of unlawfully in the builders’ van and later in skips. Complaints
were made to Sefton Council and HSE officers.
It took a week for HSE to come out.
HSE insisted they could not take prosecution proceedings because
this was DIY.
Building
control went out on 4 separate occasions to check the progress of the
foundations for the double side extension before they gave building regulations
approval over 2 weeks after work had started on site after assuring
neighbouring residents, through the MP, his aide and a local councillor, that no work would take place while
negotiations over safety were ongoing. Unlawful
disconnection of the mains gas supply to the building and the gas meter had
been undertaken by the builders during this time which building control had overlooked.
The
builders then unlawfully reconnected the mains gas supply and
re-positioned the gas meter. This can only be undertaken by the gas
supplier (in this case National Grid).
When we complained, the building control manager refused to investigate
and suggested we contacted the gas supplier when it was his duty to do so.
The
developers employed an unregistered installer to undertake unlawful internal
gas installations, including a gas boiler.
When we had fumes entering our property from the gas boiler flue terminal
we contacted Gas Safe who classed this boiler installation as immediately
dangerous. We also complained to the
Chair of HSE in London because no investigations were taking place and our
safety and that of our property was in jeopardy.
We were
left in a very dangerous position with unlawfully installed exterior gas
installations running alongside our property (only a metre away) and HSE had no
intention of investigating either the internal or external gas installations
and prosecuting those involved. Instead of going out and
investigating they were sending letters
out to those committing these serious crimes and accepting that they could not
remember who was responsible. Our
statements and our evidence were never asked for yet HSE had a copy of the Gas
Safe Inspector’s report which confirmed our allegations and which HSE sat on
for over 6 months, knowing that our safety was being compromised.
Some of
the electrical installations at this extended development came under Part P of
the building regulations and, therefore, needed to be notified within 30 days
of installation. The developers were
living in the property for over 6 months before these installations were
finally notified after neighbours complained.
We are
saying that Sefton Council’s building control department are failing to check
that installations are undertaken legally and safely and are issuing completion
certificates which will cover unlawful installations thus rubber stamping
“cowboy” builders’ activities.
2a
Moorhey Road, Maghull (see blog for full account)
At the
end of 2017 residents in the vicinity of Moorhey Road, Maghull were experiencing blocked drains. Various roads were dug up to find the cause
of the problem. Eventually it was
discovered that a fairly newly erected property (2a Moorhey Road) had been
constructed over a main sewer pipe to the area which went diagonally across the
land to a pumping station and the house had now subsided damaging the main
sewer pipe. The residents of 2a Moorhey
Road were moved out while their home was repaired and the drainage system
re-routed. The road was blocked off and
a temporary pumping station installed.
This
small plot of land had been owned by United Utilities who had sold it off
around 2011/12. Why would a utility
company sell off a public asset losing the right of access to the main sewer
pipe underneath that land and losing access for maintenance purposes to Melling
Brook and Old Alt Brook ? Who sold off
the land and to whom? This needs
investigating.
The new
owner then applied for planning permission to erect a detached property and the
planning application form states that the applicant sought pre-application
advice from Sefton Council’s Planning Department. Why did Sefton Council planning officers accept this planning
application and give advice when officers were well aware that a pumping
station was adjacent to the land and
maps of the area clearly showed the layout of the main sewerage pipework across
this land? They were also well aware
that building regulations stipulate that main drains cannot be built over. Why did Sefton Council planning officers then
recommend this application for approval?
There is no record of United
Utilities being consulted about the planning application or Sefton Council’s
own drainage department being consulted. There is no record of a
planning committee site visit. The
Environment Agency was consulted over access to Melling Brook and Old Alt Brook
and voiced their objections. Nearby
residents objected with a petition and stated this was an unsuitable location adjacent
to a pumping station and expressed concerns about lack of access to the main
drainage pipe. Residents also asked how
would the Environment Agency access the brook?
A planning committee had been misled and information withheld from
them. There were officers and
experienced councillors present at the planning committee meeting who were
aware of all the implications involved in approving this application, why
didn’t someone speak up and query what was happening?
In 2013
the land was advertised as a cleared site offered with the benefit of full
planning permission to erect a 4 bedroomed detached property and was sold off in auction, with the owners making a
considerable profit on the transaction.
These are
not mistakes but blatant corrupt practices which have been brought to light
because the property has subsided over the main sewerage system and the public
will be paying the bill to rectify all the damage. This needs investigating by an independent
body and those involved should be made accountable for what has happened.