Sunday, 27 September 2020

Planning Application S/2013/0122 – Southport Road, Lydiate

 

Erection of a part single, part two storey extension to the side and first floor extension to the rear


Could the following possibly happen in Britain today when we have legislation in place to prevent what has occurred?  Yes, it did happen and here is our account of events.

Sefton Council Planning Officers contrived with developers to force through a plan which they knew contravened planning law and building regulations on fire safety.  They put this plan out to public consultation to lay people.


The MP was involved making clear his full support to residents’ objections and asking for their objections to be given serious consideration.   Residents also sought the help of an independent planner to put forward their objections based on planning law.  See MPs letter and residents’ objection.


When Sefton Council officers realised that they could not justify giving approval to this plan (Plan 1) because residents’ objections were so strong that plan 1 could not be approved, Sefton Council officers gave the developers advice in making a new plan with major material changes (which they called Plan 1b) see letter proving that Sefton Council Officers requested amendments from the developers without going back to public consultation. 

This Plan 1b was then given approval by the planning department, without going back to public consultation which is against planning law.  We are saying that the planning department officers have acted unlawfully and by creating another plan have taken away residents’ democratic rights.  The original plan should have been judged on its merits and would have been refused.  

Our rights to amenities and our personal safety and that of our property were being removed in favour of developers who had never lived here.  

 

Planning application form

A planning application form was fraudulently completed showing one owner when there were two (as shown on the land registry) and certificate A (certifying sole ownership) completed.  The Planning application form has to be validated by the planning department before it is put into the public domain.  Why was this application accepted when planning law states it is an offence,  knowingly or recklessly, to complete a false planning application form/certificate? 

Does this second owner (omitted from the planning application form) have a connection to a person employed by the Council?  (See points 9, 11 and 14 on the planning application form).  The fraudulently completed planning application form was published on Sefton Council’s website and formed the basis on which residents made their objections. See planning application form. 


There was omission of a tree some 60’ high from the plans and the planning application form, omission of the services on the plans and denial that parking arrangements would be altered.  (See points 7 and 8 on the planning application form).

We had pointed out the omission of the tree and underneath that tree a full asbestos shed to the case officer when she visited the site and gave us a full plan and while this application was still in the consultation stage

We had also discussed loss of our light and amenities with the 2 buildings coming closer together (i.e. 1 metre apart) and the fact that the services were not shown on the plans.

The case officer dismissed our concerns and her whole attitude towards us changed when we raised these points.  At that stage the planning department should have rejected this application and the plans because they were not valid.  There were also major safety issues (non-compliance with Part B of the building regulations) and contraventions of planning law

 

.

Plan 1

This was the plan put out to public consultation and to which residents objected and to which the MP gave to the Planning Department his letter of support.   This plan no longer exists. 

The design of the extension did not conform to planning policy MD1 of Sefton Council’s UDP. 

See copy of Policy MD1 of Sefton Council’s UDP .

The volume of the property was to be increased to twice its original size when extensions should look like smaller additions rather than being overwhelming or obvious enlargements.

A semi-detached property which did not match the other semi, giving a totally unbalanced appearance.  The main door was moved from the side of the house and incorporated into the front of the extended side extension.  The new porch was nothing like a traditional porch but was incorporated into the new side extension.  A bay window was installed into the front of the property.  The hipped roof was replaced with a gable.

Our right to light was being taken away.  We had a window facing the new double side extension which served for our hallway, stairs and landing areas.  The two buildings were being brought closer together.  There would only be one metre separating the two buildings, with the boundary line being in the centre of that one metre.  The proposed double side extension with its gable end would tower over a detached bungalow. 

5 windows were proposed on the side elevation facing our property which contravened building regulations Part B – fire risk.  The proposed kitchen window alone was over 2 metres square, as was the proposed porch side window and there were another 3 windows of considerable size also proposed.

Our safety was being compromised.  Our side window was well over a metre square and with the wooden cladding the unprotected area was well over 2 metres square.  This should have prevented any new development coming so close to the boundary.

The double rear extension projected out 4 metres when the maximum allowed is 3 metres

 

Plan 1b

Just after planning approval had been given to Plan lb, and before Plan 1b was deposited with building control for their approval, we discovered the 5 windows on the side elevation to the new extension and facing our property contravened building regulations – fire safety because they were classed as unprotected areas and would pose an increased fire risk to both properties.

We immediately notified ~Sefton Council’s building control department via our MP’s aide of our concerns and that we too had a window and wood cladding in excess of 2 metres square directly opposite the 5 windows.

Our window should have prevented the new side extension coming any closer to the boundary for safety reasons.   Building control insisted that the building regulations only took into account the new build which we totally disagreed with because our window and wood cladding were a safety risk to the new side extension.  They were misinforming us to force through this plan so that work could start.  Our safety was being totally ignored when we had a right to protect our lives and our property from danger.

There were major safety concerns here which affected our safety and that of our property.  We were informed that we would be kept updated as negotiations with the developers progressed but in reality we were never involved in discussions over our safety.

We were going to cancel our holiday which was imminent but were assured by our MP, his aide and our councillor that no work would take place in our absence.  We returned from holiday to discover that building work had commenced on the side extension up to ground floor level when we now know building regulations approval had not been given and safety negotiations were still ongoing.

Building control even went out on 4 separate occasions during our absence to check the progress of the foundations before they gave building regulations approval on 7th May 2013 (over 2 weeks after work had started on site).  We have a photograph dated 24th April 2013 taken by Building Control showing the 2 builders working on the foundations, yet building control had cautioned the developers on two separate occasions about starting work when approval had not been given.


 



 Also see signing off certificate and letters cautioning starting work.


Agreement must have been made between Sefton Council and the developers to start work before approval had been given, even though we had been assured that no work would take place in our absence on holiday.  This is exactly what happens all over Sefton  with developers starting work before approval has been given and in some cases work is checked before approval is given to start that work.

 

Plan 1c

We have now discovered from FOI material the existence of a Plan 1c which again did not go through the democratic process.  The 5 side windows remained in this plan contravening building regulations and affecting safety.  This Plan 1c has never been shown on Sefton Council’s planning portal.

We are saying that it was always the intention to include these 5 side windows and but for our continued persistence in questioning building control’s interpretation of the building regulations these 5 side windows would have remained in the completed development today.

Who was putting pressure on building control? (click on thumbnails below to view larger images)

 


Unlawful disconnection of gas mains supply to the building and gas meter

As already stated earlier, we had mentioned the omission of the services on the original plans to the planning case officer when she visited our property with the original plans.  The gas mains supply to the existing property would need to be disconnected as it is unlawful to build over external gas mains supply pipework.

Sefton Council officers should have been aware of legislation relating to external gas mains supply pipework.  Only the gas supplier (in 2013 this was National Grid) or their appointed representative could undertake this work.

The builder and the developers were responsible for the unlawful disconnection of the external gas mains supply pipework to the premises and also unlawful disconnection of the gas meter.  This was undertaken when no work should have been taking place and when the foundations for the side extension were being constructed and were checked by building control at the end of April/early May.

Why was this dangerous unlawful procedure allowed by Sefton Council officers?

 

Party Wall Notice

Party Wall notice was relevant because work was to take place close to the boundary with our property.  We were never given this notice

On the developers’ plan there was a note concerning neighbouring consent to be sought for all work on or within 3 metres of the party wall or fence under the party wall act 1996 (2 months’ notice required).

Building control had given both the developers and ourselves a copy of the party wall act and knew that the relevant notice could not possibly have been given, building regulations approval to start work had not been given by building control, yet building control were out on site checking the foundations and building work which should not have been taking place and overlooking major dangerous external gas contraventions.

 

Building Regulations 2010 – Part B –  Fire Safety

The building regulations 2010 – fire safety – approved document B – Section B4 – external fire spread states:

(1) “The external walls of the building shall adequately resist the spread of fire over the walls and from one building to another, having regard to the height use and position of the building.

(2)”The roof of the building shall adequately resist the spread of fire over the roof and from one building to another, having regard to the use and position of the building.”

As stated earlier, we had discovered that the 5 windows on the proposed double side extension contravened building regulations – part B and that we disagreed with building control’s interpretation of these building regulations.  It was evident that Sefton Council officers were determined to force this plan through.

We had been advised that the total area for the windows on the proposed side extension would total less than 1 metre square to comply with building regulations – fire safety.  This was the maximum allowed when a property was being brought to within less than 1 metre of a boundary (see letter of 8th May where developers have agreed to reduce window sizes to comply with building regulations).

However, as work progressed we noticed that an opening to allow for a porch side window had been incorporated into the side extension.  Building control tried to deceive us by stating in an email that there was an exemption on the porch side window.  When we challenged this interpretation, the porch side window opening was bricked up without explanation.  See copy of exemption email.



 

Omission of an outbuilding on plans and planning application form

A tree (some 60’ in the rear garden) had to be felled and a full asbestos shed had to be removed so that an outbuilding could be erected in the rear garden.  Advice was given by Sefton Council’s building control department concerning the erection of this outbuilding yet it was not shown on the plans nor the planning application form.  This outbuilding required planning approval because of its height and position close to the boundary.  See letter and amendments to plans from building control referring to a garage.  This would mean a further increase in the total volume of the development and should have been taken into consideration before planning approval was given.  

 

Asbestos contamination

The tree (in the rear garden and omitted from the plans and planning application form) was felled in an extremely dangerous manner by 2 young men (employed by the developers for this purpose), crashing down on the full asbestos shed, contaminating neighbours with debris/dust.

The builders removed the asbestos debris without observing the Control of Asbestos Regulations, even smashing the asbestos up with hammers.  The asbestos debris was disposed of unlawfully in the builders’ van and later in skips.   

Complaints were made to HSE and  Sefton Council officers.  A Sefton Council Environmental Protection Enforcement Officer came out but did not stop the site or make it safe. The Officer was shown photographs taken earlier of the developers loading asbestos debris into a skip and covering it with building rubbish to hide it.  he refused to look into the skip.  The Officer was taken into the rear garden and he took photographs of the badly damaged asbestos debris in the neighbouring property (see photos 3 and 4 below) and lying against the boundary.  The Officer said this was asbestos (see his report which conflicts with residents photographs taken at the same time).  This is the same Environmental Enforcement Officer involved in Saville Road in 2020 who misled an MP, residents and their Councillors and allowed unlawful demolition on a contaminated site to continue exposing a community and workers on site to asbestos and other very harmful contaminants.


 It was a week before a HSE inspector visited the site.   The site was not stopped and made safe.  The builders were allowed to continue with these unlawful activities, further contaminating neighbours when they should have faced prosecution.  HSE insisted they were unable to take prosecution proceedings because this was DIY.  The builder had stated that he was responsible for felling the tree for his sister and HSE were saying that they would have to prove that a work activity had taken place with money changing hands.  This is the same workman who had constructed the foundations for the new side extension before building control approval to the plans.  He was also responsible for the  unlawful disconnection of the external gas mains supply pipework and the gas meter. See HSE Inspectors report.

This site was never cleared fully of asbestos debris and the rear garden was allowed to be contaminated.   We have photographs showing the builders’ total disregard for the Control of Asbestos Regulations which Sefton Council and HSE officers were allowing and giving approval to these builders to proceed in the same reckless dangerous manner.




 

Demolition procedures under HSE Construction Design and Management Regulations (CDM) and demolition procedures under the Building Act

The existing rear extension had to be demolished to make way for the new double rear extension.

No intended demolition notice was given to Sefton Council, HSE or affected residents for the rear extension demolition.  The existing building to be demolished was never checked for asbestos or other contamination.  Why weren’t demolition procedures observed by Sefton Council and HSE officers?

 

Unlawful internal and external gas installations contravening building regulations

We were not aware that the gas mains supply pipework to the building had been unlawfully disconnected until several months later when we observed the builder with another workman re-routing the gas mains supply pipework into the new side extension and attempting to conceal their work with a wooden board. 



We checked our photographs taken in early May which confirmed the disconnection had taken place.
  Photograph here showing unlawful disconnection had taken place.



Both disconnection and re-connection of gas mains supply pipework and re-location of the gas meter can only be undertaken by the gas supplier (in this case National Grid) or their appointed representative.  Why were Sefton Council Building Control Department overlooking the unlawful disconnection of the gas mains supply pipework when they were out checking the foundations for the side extension in April and early May?


The developers and their builder then employed an unregistered workman to undertake internal gas installations, including internal gas pipework, a gas boiler and a gas hob.  When we had fumes entering our building from a gas boiler flue terminal that contravened gas regulations we notified Gas Safe immediately, along with the Chair of HSE in London, our MP, Sefton Council’s chief executive and their environmental health officer.  The two properties were only just over a metre apart now and we were extremely concerned for our safety should a gas explosion occur and realised that those responsible for unlawful gas installations would not be covered for public liability insurance purposes.  The development was still under the jurisdiction of Sefton Council’s building control.


Gas boiler flue terminal positioned too near the boundary and opposite an openable window.

Sefton Council’s environmental health officer forwarded our complaint to building control department and we now know that a building control officer came out on to site almost a week before the Gas Safe inspection was undertaken.  In view of our complaint, and the potentially very serious consequences of unlawful gas installations, he should have stopped work on site, called in HSE and undertaken a full site inspection of all gas installations.   A check on the relevant systems would have revealed that the boiler had not been registered.  It could not possibly be registered with an unregistered workman involved.  The boiler was also connected to an electrical supply which had not been tested.


FOI material received from Sefton Council  revealed that the building control inspector only targeted the boiler installation and the boiler flue terminal for rectification.  Building control had already overlooked the unlawful disconnection of the gas mains supply pipework and the gas meter when they had checked the foundations for the side extension.  The external gas installations had now been unlawfully re-connected into the new side extension and there were now multiple contraventions of internal gas installations by an unregistered workman which they were also overlooking.


In response to our complaint to Gas Safe, just over a week later, a Gas Safe inspector undertook an inspection  which confirmed our allegations of unlawful internal and external gas installations.  Because of data protection, Gas Safe had advised the contents of the report would not be divulged to us and we didn’t learn of its contents until over 18 months later when we requested FOI material from HSE.  Sefton Council and HSE, however, were well aware of the seriousness of the situation because they had received copies of the Gas Safe inspector’s report shortly after his visit but they purposely withheld the full contents of the report from us. 


The Gas Safe inspector classed the boiler installation as “immediately dangerous” and there were 5 other contraventions highlighted on the unlawful installation, including the fact that there was no evidence that the appliance had been registered for building control purposes.  The Gas Safe inspector also commented that there was evidence on site that the gas supply pipe leading to the building had been re-positioned.   We had already expressed concerns about our safety  to both Sefton Council and the Chair of HSE and had advised them that the builder/developers were responsible for these unlawful external gas installations before Gas Safe had inspected this property and the Gas Safe inspector had now confirmed our allegations. 


In his report the Gas Safe inspector says he met the builder who was involved in the renovation of the property.  This is the same builder who HSE claim is DIY and they cannot prosecute him over asbestos contamination.  This builder misled the Gas Safe inspector giving him details of an installer who he alleged undertook the boiler installation.  Later that day, when the inspector made contact with the alleged installer, he was advised that the registered installer had been asked to complete the installation done by a third party.


What we did not know at the time was that a gas hob had also been installed.  This installation has never been rectified.   The gas hob has now been registered by way of a landlord’s/householder’s safety record.  Gas Safe have advised in their installer magazine that this is one way unregistered installers bypass the regulations.  Building control should not have accepted this householder’s certificate.  They knew the gas hob had been installed unlawfully and now they were covering up for unlawful gas installations.


Almost a month after the Gas Safe inspector’s visit, a registered gas installer re-sited the gas boiler and moved the gas boiler flue terminal to the rear of the property.   We have repeatedly told the authorities that all the internal gas installations  were undertaken by an unregistered workman, not just the gas boiler but only the gas boiler installation has been rectified.


The Gas Safe inspector had said in his report that there was evidence that the gas mains had been re-positioned confirming what we had alleged and both Sefton Council and HSE had copies of his report but neither investigated his findings and our allegations.


When we tried to get Sefton Council’s building control department involved, the manager in a letter to us advised “I cannot deal with this matter and recommend that you contact the relevant utility company.”  Sefton Council’s building control department were deliberately overlooking what was going on when it would have been a simple matter to check with National Grid and then investigate.


HSE had no intention of investigating either the internal or external gas installations and prosecuting those involved.  Instead of going out and investigating they were sending letters out to those committing serious environmental crimes and accepting that they could not remember who was responsible.


We were continually emailing HSE and Sefton Council to no avail.  We were living next door to a potential gas explosion and HSE and Sefton Council just did not want to investigate.  We were never contacted for our statements and our evidence.


We were forced to investigate ourselves and contacted National Grid directly.  Because of data protection, National Grid could not supply us with specific information but what they did say was that no orders had been received by them for any gas work in our road recently.  This was enough to confirm our allegations which we had already made to both Sefton Council and HSE.


We conveyed this information to HSE, London, pointing out that we had given them enough information and expected  them to investigate now.  We also reminded them that our allegations about the unlawful gas boiler installation had proved to be correct and the gas boiler had been re-sited as a result.   We gave details of the unlawful workman who had undertaken the internal gas installations (his van  registration  and the name of the company he worked for)  and we enclosed photographs of the digging out for the unlawful external gas installations which HSE completely disregarded each time we complained about them in our communications. 


The Gas Safe inspector had been given false information by the builder about the workman who installed the boiler.  In response to the Gas Safe inspector’s report, instead of investigating on site, HSE merely sent out a letter to the developers asking for details of the workman who installed the boiler.  They then accepted the developers’ explanation that they could not remember his name and HSE had then closed the case.   This was HSE’s alleged investigation.


Almost 6 months after our initial complaint to Gas Safe, National Grid eventually removed the unlawfully installed external gas pipework to the building and replaced it.  This was after numerous emails to HSE and with the involvement of the HSE Chair in London but  HSE still did not come out to investigate.


HSE traced the unregistered workman who installed the boiler with the information we gave them.  We were told that he had now signed an undertaking that he would not work on gas unless he had obtained formal registration with the Gas Safe Register.  As far as the external gas installations were concerned, HSE accepted the householders’ explanation that they could not remember the identity of the person apart from his first name which is ridiculous considering he is a relative of one of them and both the developers and those they employ are responsible.  When his identity is discovered HSE will write to that person warning him not to undertake any further work on the gas network.  


We had involved the Chair of HSE in London and our MP at all stages but apart from a letter to HSE expressing concern at what was happening, he failed to give us any real support.   In view of the seriousness of these unlawful installations, he should have been pressing HSE to investigate what was going on.


We had been left for over 6 months with unlawfully installed gas mains supply pipework positioned very close to our property and feared for the safety of our family and property.  HSE and Sefton Council had the Gas Safe report confirming our allegations.    A simple telephone call to National Grid would have confirmed that no work had been undertaken by them at that property but neither HSE or Sefton Council had any intention of investigating what had happened.


60% of all gas installations are undertaken by unregistered installers and we can now see why so many are undertaking this unlawful work when our national safety body (HSE) are not doing their job.  There is just no deterrent.

 

Contravention of electrical regulations (under Part P of the Building Regulations)

Some of the electrical installations at this extended development came under Part P of the building regulations and, therefore, needed to be notified within 30 days of installation which never happened.


On 7th October 2013 armoured electrical cable was relayed to an unlawfully installed outbuilding in the rear garden of the extended development.


This armoured electrical cable was live, lying on the boundary between our property and  the side of the new extended property  down to the outbuilding in the rear garden.  This cable was being walked over, lifted up, hung on privets, chairs placed on top of it (as our photographs will show), dragged to different parts of the garden and pulled back again.  This cable was open to all weather elements.


When this cable was first installed on 7th October 2013 it should have been tested,  buried in the garden to the correct depth and a notification certificate under Part P of the building regulations issued within the 30 day period, along with the notification of the Part P internal house electrical installations.


We reported our concerns in an email to building control on 28th November 2013 that armoured electrical cable lay on the boundary with our property and our safety was being compromised. 


In a conversation about electrical installations at this property, on 22nd May 2014 a building control officer advised us that the property had not yet been signed off.  We could not believe what we were hearing.


The developers had moved into the house in December 2013 and it was now May 2014.  All the electrical installations to the outbuilding had been used since December 2013 when these developers had first moved in, as well as internal house electrical installations governed by Part P of the building regulations .  We had witnessed lights being used in this outbuilding in the winter time and various electrical appliances plugged into the electrical system in the outbuilding. Furthermore, in October 2013 an unlawfully installed boiler had been in operation which was connected to the electrical supply.


We now have in our possession electrical test certificate no 428276 (5 sheets) dated 6th March 2014 and completed by Blank Electrical.  These sheets appear to have been altered in an attempt to include the testing of the outbuilding electrical installations at this time i.e. 6th March 2014.


So the occupants of this extended property had been using various electrical installations which were untested and not notified in accordance with Part P of the building regulations for four months before testing eventually took place on the 6th March 2014 and six months before these installations were notified under Part P of the building regulations. 


Here we have a Building Control Department condoning unlawful practices and actually aiding in covering them up.  Why didn’t building control query the electrical testing form?


This live armoured electrical cable was eventually buried on 6th June 2014 by a landscape workman who first buried it on the boundary line with our property.  We advised him not to bury it in this location because it would be dangerous for future workmen erecting fences or digging on the boundary.  We asked him to move the cable which he did.

 

Alterations to the front driveway and erection of a front wall which required  planning permission

A new front wall was erected on 5th March 2014.  This was over the permitted height. We wrote on 21st May 2014 advising the Council of its existence and a planning enforcement officer subsequently carried out a joint site inspection with a Building Control Officer. 


On 3rd June 2014 we were advised that the property owner will be invited to submit a retrospective planning application to regularise the wall in its current form.  To date we are still awaiting consultation on such a planning application.  


This is not just about altering a front wall, this is about altering the parking arrangements and safety issues.   This property is on a busy main road and adjacent to a bus stop and a bus layby.  We refer to the original planning application form where the “No” box was ticked for the question as to whether parking arrangements would be altered.  This is clearly deception to get the parking arrangements altered without going through the due consultation process and an assessment by highways department would have been required..  



 

Our amenities and right to safety had been removed by Sefton Council officers.  Developers and their builders had been allowed to contravene the law without fear of prosecution.  We went right through Sefton Council's complaints procedures on Planning matters only and then to the Ombudsman who advised he was unable to assist with building regulations.  In his final decision he commented that the Ombudsman could not question the Council's decision only the way they went about making that decision and he had seen no evidence of fault in the way the Council made its decision.  Others have referred to the Ombudsman as "an old boys school of ex- council employees, rotten with corruption to the core, whose main aim is to whitewash and cover up as much council maladministration as it can get away with".  Our experience suggests this view should not be dismissed.

Illegal Waste Site Formby

 Retrospective Planning Applications DC/2020/0098 and DC/2020/02197 This site (in the green belt and on a flood plain) had been heavily pr...