Erection of a part single, part two storey extension to the side and first floor extension to the rear
Could the following
possibly happen in Britain today when we have legislation in place to prevent
what has occurred? Yes, it did happen
and here is our account of events.
Sefton Council Planning Officers contrived with developers to force through a plan which they knew contravened
planning law and building regulations on fire safety. They put this plan out to public consultation
to lay people.
The MP was involved
making clear his full support to residents’ objections and asking for their
objections to be given serious consideration.
Residents also sought the help of
an independent planner to put forward their objections based on planning law. See MPs letter and residents’ objection.
When Sefton Council officers
realised that they could not justify giving approval to this plan (Plan 1) because
residents’ objections were so strong that plan 1 could not be approved, Sefton
Council officers gave the developers advice in making a new plan with major
material changes (which they called Plan 1b) see letter proving that Sefton Council Officers requested amendments from the developers without going back to public consultation.
This Plan 1b was then
given approval by the planning department, without going back to public
consultation which is against planning law.
We are saying that the planning department officers have acted
unlawfully and by creating another plan have taken away residents’ democratic
rights. The original plan should have
been judged on its merits and would have been refused.
Our rights to amenities
and our personal safety and that of our property were being removed in favour
of developers who had never lived here.
Planning application form
A planning application
form was fraudulently completed showing one owner when there were two (as shown
on the land registry) and certificate A (certifying sole ownership)
completed. The Planning application form
has to be validated by the planning department before it is put into the public
domain. Why was this application
accepted when planning law states it is an offence, knowingly or recklessly, to complete a false planning
application form/certificate?
Does this second owner (omitted from the planning application form) have a connection to a person employed by the Council? (See points 9, 11 and 14 on the planning application form). The fraudulently completed planning application form was published on Sefton Council’s website and formed the basis on which residents made their objections. See planning application form.
There was omission of a
tree some 60’ high from the plans and the planning application form, omission
of the services on the plans and denial that parking arrangements would be
altered. (See points 7 and 8 on the
planning application form).
We had pointed out the
omission of the tree and underneath that tree a full asbestos shed to the case
officer when she visited the site and gave us a full plan and while this
application was still in the consultation stage
We had also discussed
loss of our light and amenities with the 2 buildings coming closer together
(i.e. 1 metre apart) and the fact that the services were not shown on the
plans.
The case officer
dismissed our concerns and her whole attitude towards us changed when we raised
these points. At that stage the planning
department should have rejected this application and the plans because they
were not valid. There were also major
safety issues (non-compliance with Part B of the building regulations) and
contraventions of planning law
.
Plan 1
This was the plan put out to public consultation and
to which residents objected and to which the MP gave to the Planning Department
his letter of support. This plan no longer
exists.
The design of the
extension did not conform to planning policy MD1 of Sefton Council’s UDP.
See copy
of Policy MD1 of Sefton Council’s UDP .
The volume of the
property was to be increased to twice its original size when extensions should
look like smaller additions rather than being overwhelming or obvious
enlargements.
A semi-detached
property which did not match the other semi, giving a totally unbalanced
appearance. The main door was moved from
the side of the house and incorporated into the front of the extended side
extension. The new porch was nothing
like a traditional porch but was incorporated into the new side extension. A bay window was installed into the front of
the property. The hipped roof was
replaced with a gable.
Our right to light was
being taken away. We had a window facing
the new double side extension which served for our hallway, stairs and landing
areas. The two buildings were being
brought closer together. There would
only be one metre separating the two buildings, with the boundary line being in
the centre of that one metre. The
proposed double side extension with its gable end would tower over a detached
bungalow.
5 windows were proposed
on the side elevation facing our property which contravened building regulations
Part B – fire risk. The proposed kitchen
window alone was over 2 metres square, as was the proposed porch side window
and there were another 3 windows of considerable size also proposed.
Our safety was being
compromised. Our side window was well
over a metre square and with the wooden cladding the unprotected area was well
over 2 metres square. This should have
prevented any new development coming so close to the boundary.
The double rear
extension projected out 4 metres when the maximum allowed is 3 metres
Plan 1b
Just after planning
approval had been given to Plan lb, and before Plan 1b was deposited with
building control for their approval, we discovered the 5 windows on the side
elevation to the new extension and facing our property contravened building regulations
– fire safety because they were classed as unprotected areas and would pose an
increased fire risk to both properties.
We immediately notified
~Sefton Council’s building control department via our MP’s aide of our concerns
and that we too had a window and wood cladding in excess of 2 metres square directly
opposite the 5 windows.
Our window should have
prevented the new side extension coming any closer to the boundary for safety
reasons. Building control insisted that
the building regulations only took into account the new build which we totally
disagreed with because our window and wood cladding were a safety risk to the
new side extension. They were
misinforming us to force through this plan so that work could start. Our safety was being totally ignored when we
had a right to protect our lives and our property from danger.
There were major safety
concerns here which affected our safety and that of our property. We were informed that we would be kept
updated as negotiations with the developers progressed but in reality we were
never involved in discussions over our safety.
We were going to cancel
our holiday which was imminent but were assured by our MP, his aide and our councillor
that no work would take place in our absence.
We returned from holiday to discover that building work had commenced on
the side extension up to ground floor level when we now know building
regulations approval had not been given and safety negotiations were still
ongoing.
Building control even went out on 4 separate occasions during our absence to check the progress of the foundations before they gave building regulations approval on 7th May 2013 (over 2 weeks after work had started on site). We have a photograph dated 24th April 2013 taken by Building Control showing the 2 builders working on the foundations, yet building control had cautioned the developers on two separate occasions about starting work when approval had not been given.
Also see signing off certificate and letters cautioning starting work.
Agreement must have
been made between Sefton Council and the developers to start work before
approval had been given, even though we had been assured that no work would
take place in our absence on holiday.
This is exactly what happens all over Sefton with developers starting work before approval
has been given and in some cases work is checked before approval is given to
start that work.
Plan 1c
We have now discovered
from FOI material the existence of a Plan 1c which again did not go through the
democratic process. The 5 side windows
remained in this plan contravening building regulations and affecting
safety. This Plan 1c has never been
shown on Sefton Council’s planning portal.
We are saying that it
was always the intention to include these 5 side windows and but for our
continued persistence in questioning building control’s interpretation of the
building regulations these 5 side windows would have remained in the completed
development today.
Who was putting pressure on building control? (click on thumbnails below to view larger images)
Unlawful disconnection
of gas mains supply to the building and gas meter
As already stated earlier, we had mentioned the omission of the services on the original plans to the planning case officer when she visited our property with the original plans. The gas mains supply to the existing property would need to be disconnected as it is unlawful to build over external gas mains supply pipework.
Sefton Council officers
should have been aware of legislation relating to external gas mains supply
pipework. Only the gas supplier (in 2013
this was National Grid) or their appointed representative could undertake this
work.
The builder and the
developers were responsible for the unlawful disconnection of the external gas
mains supply pipework to the premises and also unlawful disconnection of the
gas meter. This was undertaken when no
work should have been taking place and when the foundations for the side
extension were being constructed and were checked by building control at the
end of April/early May.
Why was this dangerous
unlawful procedure allowed by Sefton Council officers?
Party Wall Notice
Party Wall notice was
relevant because work was to take place close to the boundary with our
property. We were never given this
notice
On the developers’ plan
there was a note concerning neighbouring consent to be sought for all work on
or within 3 metres of the party wall or fence under the party wall act 1996 (2
months’ notice required).
Building control had
given both the developers and ourselves a copy of the party wall act and knew
that the relevant notice could not possibly have been given, building
regulations approval to start work had not been given by building control, yet building
control were out on site checking the foundations and building work which should
not have been taking place and overlooking major dangerous external gas
contraventions.
Building Regulations
2010 – Part B – Fire Safety
The building
regulations 2010 – fire safety – approved document B – Section B4 – external
fire spread states:
(1) “The external walls
of the building shall adequately resist the spread of fire over the walls and
from one building to another, having regard to the height use and position of
the building.
(2)”The roof of the
building shall adequately resist the spread of fire over the roof and from one
building to another, having regard to the use and position of the building.”
As stated earlier, we
had discovered that the 5 windows on the proposed double side extension
contravened building regulations – part B and that we disagreed with building
control’s interpretation of these building regulations. It was evident that Sefton Council officers
were determined to force this plan through.
We had been advised
that the total area for the windows on the proposed side extension would total
less than 1 metre square to comply with building regulations – fire safety. This was the maximum allowed when a property
was being brought to within less than 1 metre of a boundary (see letter of 8th May where developers have agreed to reduce window sizes to comply with building regulations).
However, as work
progressed we noticed that an opening to allow for a porch side window had been
incorporated into the side extension. Building
control tried to deceive us by stating in an email that there was an exemption
on the porch side window. When we challenged
this interpretation, the porch side window opening was bricked up without
explanation. See copy of exemption email.
Omission of an
outbuilding on plans and planning application form
A tree (some 60’ in the
rear garden) had to be felled and a full asbestos shed had to be removed so
that an outbuilding could be erected in the rear garden. Advice was given by Sefton Council’s building
control department concerning the erection of this outbuilding yet it was not
shown on the plans nor the planning application form. This outbuilding required planning approval
because of its height and position close to the boundary.
Asbestos contamination
The tree (in the rear garden and omitted from the plans and planning application form) was felled in
an extremely dangerous manner by 2 young men (employed by the developers for
this purpose), crashing down on the full asbestos shed, contaminating
neighbours with debris/dust.
The builders removed
the asbestos debris without observing the Control of Asbestos Regulations, even
smashing the asbestos up with hammers.
The asbestos debris was disposed of unlawfully in the builders’ van and
later in skips.
Complaints were made to HSE and Sefton Council officers. A Sefton Council Environmental Protection Enforcement Officer came out but did not stop the site or make it safe. The Officer was shown photographs taken earlier of the developers loading asbestos debris into a skip and covering it with building rubbish to hide it. he refused to look into the skip. The Officer was taken into the rear garden and he took photographs of the badly damaged asbestos debris in the neighbouring property (see photos 3 and 4 below) and lying against the boundary. The Officer said this was asbestos (see his report which conflicts with residents photographs taken at the same time). This is the same Environmental Enforcement Officer involved in Saville Road in 2020 who misled an MP, residents and their Councillors and allowed unlawful demolition on a contaminated site to continue exposing a community and workers on site to asbestos and other very harmful contaminants.
It was
a week before a HSE inspector visited the site. The site was not stopped and made safe. The builders were allowed to continue with
these unlawful activities, further contaminating neighbours when they should
have faced prosecution. HSE insisted
they were unable to take prosecution proceedings because this was DIY. The builder had stated that he was
responsible for felling the tree for his sister and HSE were saying that they
would have to prove that a work activity had taken place with money changing
hands. This is the same workman who had
constructed the foundations for the new side extension before building control
approval to the plans. He was also responsible
for the unlawful disconnection of the external gas mains supply pipework and the gas
meter. See HSE Inspectors report.
This site was never
cleared fully of asbestos debris and the rear garden was allowed to be
contaminated. We have photographs showing the builders’
total disregard for the Control of Asbestos Regulations which Sefton
Council and HSE officers were allowing and giving approval to these builders to proceed in the same reckless dangerous manner.
Demolition procedures
under HSE Construction Design and Management Regulations (CDM) and demolition
procedures under the Building Act
The existing rear
extension had to be demolished to make way for the new double rear extension.
No intended demolition
notice was given to Sefton Council, HSE or affected residents for the rear
extension demolition. The existing
building to be demolished was never checked for asbestos or other
contamination. Why weren’t demolition
procedures observed by Sefton Council and HSE officers?
Unlawful internal and
external gas installations contravening building regulations
We were not aware that
the gas mains supply pipework to the building had been unlawfully disconnected
until several months later when we observed the builder with another workman
re-routing the gas mains supply pipework into the new side extension and
attempting to conceal their work with a wooden board.
Both disconnection and re-connection
of gas mains supply pipework and re-location of the gas meter can only be
undertaken by the gas supplier (in this case National Grid) or their appointed
representative. Why were Sefton Council Building Control Department overlooking the unlawful disconnection of the gas mains supply pipework when they were out checking the foundations for the side extension in April and early May?
The developers and
their builder then employed an unregistered workman to undertake internal gas
installations, including internal gas pipework, a gas boiler and a gas
hob. When we had fumes entering our
building from a gas boiler flue terminal that contravened gas regulations we
notified Gas Safe immediately, along with the Chair of HSE in London, our MP,
Sefton Council’s chief executive and their environmental health officer. The two properties were only just over a
metre apart now and we were extremely concerned for our safety should a gas
explosion occur and realised that those responsible for unlawful gas
installations would not be covered for public liability insurance purposes. The development was still under the
jurisdiction of Sefton Council’s building control.
Sefton Council’s environmental health officer forwarded our complaint to building control department and we now know that a building control officer came out on to site almost a week before the Gas Safe inspection was undertaken. In view of our complaint, and the potentially very serious consequences of unlawful gas installations, he should have stopped work on site, called in HSE and undertaken a full site inspection of all gas installations. A check on the relevant systems would have revealed that the boiler had not been registered. It could not possibly be registered with an unregistered workman involved. The boiler was also connected to an electrical supply which had not been tested.
FOI material received from Sefton Council revealed that the building control inspector only targeted the boiler installation and the boiler flue terminal for rectification. Building control had already overlooked the unlawful disconnection of the gas mains supply pipework and the gas meter when they had checked the foundations for the side extension. The external gas installations had now been unlawfully re-connected into the new side extension and there were now multiple contraventions of internal gas installations by an unregistered workman which they were also overlooking.
In response to our
complaint to Gas Safe, just over a week later, a Gas Safe inspector undertook
an inspection which confirmed our
allegations of unlawful internal and external gas installations. Because of data protection, Gas Safe had
advised the contents of the report would not be divulged to us and we didn’t
learn of its contents until over 18 months later when we requested FOI material
from HSE. Sefton Council and HSE,
however, were well aware of the seriousness of the situation because they had
received copies of the Gas Safe inspector’s report shortly after his visit but
they purposely withheld the full contents of the report from us.
The Gas Safe inspector
classed the boiler installation as “immediately dangerous” and there were 5
other contraventions highlighted on the unlawful installation, including the
fact that there was no evidence that the appliance had been registered for
building control purposes. The Gas Safe
inspector also commented that there was evidence on site that the gas supply
pipe leading to the building had been re-positioned. We had already expressed concerns about our
safety to both Sefton Council and the
Chair of HSE and had advised them that the builder/developers were responsible
for these unlawful external gas installations before Gas Safe had inspected
this property and the Gas Safe inspector had now confirmed our
allegations.
In his report the Gas
Safe inspector says he met the builder who was involved in the renovation of
the property. This is the same builder
who HSE claim is DIY and they cannot prosecute him over asbestos
contamination. This builder misled the
Gas Safe inspector giving him details of an installer who he alleged undertook
the boiler installation. Later that day,
when the inspector made contact with the alleged installer, he was advised that
the registered installer had been asked to complete the installation done by a
third party.
What we did not know at
the time was that a gas hob had also been installed. This installation has never been
rectified. The gas hob has now been
registered by way of a landlord’s/householder’s safety record. Gas Safe have advised in their installer magazine that this is one way unregistered installers bypass the
regulations. Building control should not
have accepted this householder’s certificate.
They knew the gas hob had been installed unlawfully and now they were
covering up for unlawful gas installations.
Almost a month after
the Gas Safe inspector’s visit, a registered gas installer re-sited the gas
boiler and moved the gas boiler flue terminal to the rear of the property. We have repeatedly told the authorities that
all the internal gas installations were
undertaken by an unregistered workman, not just the gas boiler but only the gas
boiler installation has been rectified.
The Gas Safe inspector
had said in his report that there was evidence that the gas mains had been
re-positioned confirming what we had alleged and both Sefton Council and HSE
had copies of his report but neither investigated his findings and our
allegations.
When we tried to get
Sefton Council’s building control department involved, the manager in a letter
to us advised “I cannot deal with this matter and recommend that you contact
the relevant utility company.” Sefton
Council’s building control department were deliberately overlooking what was
going on when it would have been a simple matter to check with National Grid
and then investigate.
HSE had no intention of
investigating either the internal or external gas installations and prosecuting
those involved. Instead of going out and
investigating they were sending letters out to those committing serious
environmental crimes and accepting that they could not remember who was
responsible.
We were continually
emailing HSE and Sefton Council to no avail.
We were living next door to a potential gas explosion and HSE and Sefton
Council just did not want to investigate.
We were never contacted for our statements and our evidence.
We were forced to
investigate ourselves and contacted National Grid directly. Because of data protection, National Grid
could not supply us with specific information but what they did say was that no
orders had been received by them for any gas work in our road recently. This was enough to confirm our allegations
which we had already made to both Sefton Council and HSE.
We conveyed this
information to HSE, London, pointing out that we had given them enough
information and expected them to
investigate now. We also reminded them
that our allegations about the unlawful gas boiler installation had proved to
be correct and the gas boiler had been re-sited as a result. We gave details of the unlawful workman who
had undertaken the internal gas installations (his van registration
and the name of the company he worked for) and we enclosed photographs of the digging
out for the unlawful external gas installations which HSE completely
disregarded each time we complained about them in our communications.
The Gas Safe inspector
had been given false information by the builder about the workman who installed
the boiler. In response to the Gas Safe
inspector’s report, instead of investigating on site, HSE merely sent out a
letter to the developers asking for details of the workman who installed the
boiler. They then accepted the developers’
explanation that they could not remember his name and HSE had then closed the
case. This was HSE’s alleged
investigation.
Almost 6 months after
our initial complaint to Gas Safe, National Grid eventually removed the
unlawfully installed external gas pipework to the building and replaced
it. This was after numerous emails to
HSE and with the involvement of the HSE Chair in London but HSE still did not come out to investigate.
HSE traced the
unregistered workman who installed the boiler with the information we gave
them. We were told that he had now
signed an undertaking that he would not work on gas unless he had obtained
formal registration with the Gas Safe Register.
As far as the external gas installations were concerned, HSE accepted
the householders’ explanation that they could not remember the identity of the
person apart from his first name which is ridiculous considering he is a
relative of one of them and both the developers and those they employ are
responsible. When his identity is
discovered HSE will write to that person warning him not to undertake any
further work on the gas network.
We had involved the
Chair of HSE in London and our MP at all stages but apart from a letter to HSE
expressing concern at what was happening, he failed to give us any real
support. In view of the seriousness of
these unlawful installations, he should have been pressing HSE to investigate
what was going on.
We had been left for
over 6 months with unlawfully installed gas mains supply pipework positioned
very close to our property and feared for the safety of our family and
property. HSE and Sefton Council had the
Gas Safe report confirming our allegations.
A simple telephone call to National Grid would have confirmed that no
work had been undertaken by them at that property but neither HSE or Sefton
Council had any intention of investigating what had happened.
60% of all gas
installations are undertaken by unregistered installers and we can now see why
so many are undertaking this unlawful work when our national safety body (HSE)
are not doing their job. There is just
no deterrent.
Contravention of
electrical regulations (under Part P of the Building Regulations)
Some of the electrical
installations at this extended development came under Part P of the building regulations
and, therefore, needed to be notified within 30 days of installation which
never happened.
On 7th October 2013
armoured electrical cable was relayed to an unlawfully installed outbuilding in
the rear garden of the extended development.
This armoured
electrical cable was live, lying on the boundary between our property and the side of the new extended property down to the outbuilding in the rear
garden. This cable was being walked
over, lifted up, hung on privets, chairs placed on top of it (as our
photographs will show), dragged to different parts of the garden and pulled
back again. This cable was open to all
weather elements.
When this cable was
first installed on 7th October 2013 it should have been tested, buried in the garden to the correct depth and
a notification certificate under Part P of the building regulations issued
within the 30 day period, along with the notification of the Part P internal
house electrical installations.
We reported our
concerns in an email to building control on 28th November 2013 that armoured
electrical cable lay on the boundary with our property and our safety was being
compromised.
In a conversation about
electrical installations at this property, on 22nd May 2014 a building control
officer advised us that the property had not yet been signed off. We could not believe what we were hearing.
The developers had
moved into the house in December 2013 and it was now May 2014. All the electrical installations to the
outbuilding had been used since December 2013 when these developers had first
moved in, as well as internal house electrical installations governed by Part P
of the building regulations . We had
witnessed lights being used in this outbuilding in the winter time and various electrical
appliances plugged into the electrical system in the outbuilding. Furthermore,
in October 2013 an unlawfully installed boiler had been in operation which was
connected to the electrical supply.
We now have in our
possession electrical test certificate no 428276 (5 sheets) dated 6th March
2014 and completed by Blank Electrical.
These sheets appear to have been altered in an attempt to include the
testing of the outbuilding electrical installations at this time i.e. 6th March
2014.
So the occupants of
this extended property had been using various electrical installations which
were untested and not notified in accordance with Part P of the building regulations
for four months before testing eventually took place on the 6th March 2014 and
six months before these installations were notified under Part P of the building
regulations.
Here we have a Building
Control Department condoning unlawful practices and actually aiding in covering
them up. Why didn’t building control
query the electrical testing form?
This live armoured
electrical cable was eventually buried on 6th June 2014 by a landscape workman
who first buried it on the boundary line with our property. We advised him not to bury it in this
location because it would be dangerous for future workmen erecting fences or
digging on the boundary. We asked him to
move the cable which he did.
Alterations to the
front driveway and erection of a front wall which required planning permission
A new front wall was
erected on 5th March 2014. This was over
the permitted height. We wrote on 21st
May 2014 advising the Council of its existence and a planning enforcement officer
subsequently carried out a joint site inspection with a Building Control
Officer.
On 3rd June 2014 we
were advised that the property owner will be invited to submit a retrospective
planning application to regularise the wall in its current form. To date we are still awaiting consultation on
such a planning application.
This is not just about altering a front wall, this is about altering the parking arrangements and safety issues. This property is on a busy main road and adjacent to a bus stop and a bus layby. We refer to the original planning application form where the “No” box was ticked for the question as to whether parking arrangements would be altered. This is clearly deception to get the parking arrangements altered without going through the due consultation process and an assessment by highways department would have been required..
Our amenities and right
to safety had been removed by Sefton Council officers. Developers and their builders had been
allowed to contravene the law without fear of prosecution. We went right through Sefton Council's complaints procedures on Planning matters only and then to the Ombudsman who advised he was unable to assist with building regulations. In his final decision he commented that the Ombudsman could not question the Council's decision only the way they went about making that decision and he had seen no evidence of fault in the way the Council made its decision. Others have referred to the Ombudsman as "an old boys school of ex- council employees, rotten with corruption to the core, whose main aim is to whitewash and cover up as much council maladministration as it can get away with". Our experience suggests this view should not be dismissed.