Pre-commencement of development contaminated land conditions had been imposed on the development in January 2017 under Part IIA of the Environmental Protection Act. These conditions had to be discharged before any development/site clearance could take place on this contaminated site. Under Section 55 of the Town and Country Planning Act “demolition” is classed as “development”. See approval notice here.
This structured legal procedure is put in place to
protect residents, the general public and workers on site from exposure to
contamination and ensure that developers do not undertake unlawful work on site
to cut costs as happened here.
The contaminated land conditions are phased and each
condition must be satisfied in order prior to progressing to the next in the
sequence. Contaminated land condition 1
involves a preliminary assessment (Phase I Report) of potential contaminants
relating to the site’s present and past uses which must be approved and
discharged by the local authority.
Testing and analysis – contaminated land condition 2 (Phase II Report) then follow to confirm the
findings of the Phase I Report. The 2nd
contaminated land condition is then discharged with local authority approval of
the Phase II Report. On the findings of
the Phase I and Phase II Reports a remediation strategy – contaminated land
condition 3 (Phase III Report) is then prepared for discharge by the local authority. Only then when all 3 contaminated land
conditions have been discharged can remediation of the site/removal of
contaminants take place.
Under pressure from residents and their councillors
who were fearful for residents’ safety and were continually asking Sefton
Council and HSE officers to stop the site and make safe, Sefton Council
officers then validated an application from the developers to discharge all 3 contaminated land conditions
simultaneously when each condition must be satisfied separately and in a
particular order in accordance with Part IIA of the Environmental Protection
Act. This application was subsequently
approved by Sefton Council officers under delegated powers on 5th April 2018. See application to
discharge all 3 contaminated land conditions and approval notice.
Before any of the contaminated land conditions had
been discharged on 5th April 2018 (which would permit remediation
only to take place), the developers of the Mayflower site were allowed by
Sefton Council and HSE officers to undertake demolition, site clearance,
excavation and groundwork for drains and demolition debris was also crushed on
site in contravention of Part IIA of the Environmental Protection Act and exposing
residents to further contamination. Sefton Council and HSE officers had knowingly
allowed developers to contravene legislation imposed on this development to
protect the general public from exposure to contamination.
Residents’ safety had been compromised. Sefton Council officers were well aware of all
the unlawful practices that had taken place but were not prepared to comply
with the law by stopping the site. They
were more intent on issuing retrospective documentation which would allow
unlawful work to progress further exposing residents to contamination.
Sefton Council officers withheld this site’s status
as a contaminated site under Part IIA of the Environmental Protection Act from
affected residents and also withheld notice of intended demolition under
Section 81 of the Building Act when it is a legal requirement for a local
authority to inform affected residents because their safety is involved.
The following is an account of the unlawful
practices which Sefton Council and HSE allowed to take place on this contaminated
site. The pre-commencement of development
contaminated land conditions had not been discharged and any work taking place
on site was unlawful.
February 2017
– unlawful work started on site with the removal of trees (site clearance).
March 2017 - buildings containing asbestos and other contaminants were being unlawfully demolished and surrounding residents were being contaminated by dust debris from this unlawful demolition. To avoid attention, the developers had deliberately avoided displaying demolition or asbestos signs as required by law. Residents complained to both Sefton Council and HSE believing these authorities would protect them against unnecessary exposure to contamination.
Between
March and August 2017 - before the contaminated land conditions were discharged and a safe remediation strategy agreed, concrete
bases, concrete rafts, roads and drainage were removed, water services and
electricity disconnected. Groundwork,
including digging out for drainage, took place and contaminated soil was moved
all around the site and stockpiled on site.
A machine was brought on to site to crush the demolition debris from the
demolished buildings, further contaminating residents.
On 4th July 2017 an asbestos survey for the Garage only was prepared for the demolition contractors. This was not a full refurbishment/demolition survey which must be submitted to the council before demolition is even contemplated. The surveyors recommended that if the report were to be used for demolition purposes, they revisit the site and investigate further.
Amosite (brown asbestos) was identified at several
locations as well as Chrysotile (white asbestos). Crocidolite (blue asbestos) was identified in
the external roof to the garage. Not
all areas were surveyed namely behind sampled materials, within live services,
areas above 5m in height, limited access within timber box-work to metal flue
in area 2, above ceiling voids where no safe walk access could be gained,
ceiling void areas were full of scrap material and timber, no access to high
level roof, live services throughout, unsafe ceiling access throughout.
There were a number of other buildings on site which
required full refurbishment/demolition surveys to be undertaken and all
contamination to be removed safely and legally and UKAS clearance certificates
issued prior to the buildings being demolished.
August
2017 - in a Phase
II Ground Investigation Report contaminants with elevated concentrations in
soils were recorded as follows:- Lead,
Nickel, Arsenic, Benzo
(b)fluoranthene, Benzo(a)pyrene, Dibenzo(ah)anthracene and Asbestos
(Chrysotile (white) and Amosite (brown) and therefore a risk to human health. See Phase II report.
September
2017
- residents were involved with HSE and Sefton Council with concerns over health
and safety.
October
2017
photographs were submitted to Sefton Council’s Environmental Protection
Department showing severe dust contamination lying on outdoor furniture in a
property at Abbots Close which backs on to the site. Cars in Abbots Way, further from the site,
were also covered in dust contamination.
The crushed debris was heaped on the site some 20ft high at this time.
A Sefton Council officer came out to Abbots Close
and took photographs himself of substantial amounts of brick and building
debris lying on a table. He recommended
reduction of the mound and covering it. The officer should have stopped unlawful work
on site to protect residents from further contamination. The mound was not reduced until December 2017
and was not covered. The building debris
remained on site still uncovered and residents were being subjected to
contaminated dust being blown over from the site.
CIRIA (Construction Industry Research and
Information Association) advises that building rubble may contain free fibres
of asbestos and fragments in rubble can be difficult to detect by the naked eye
(Asbestos in soil and made ground: a guide to understanding and managing risks.
Ready reference (SP168).
By November
2017 buildings associated with the
late 19th Century Reciprocity Brewery had been demolished. A condition had been placed on the Planning
approval (condition 3), in the interests of built heritage, requiring the
implementation of a programme of archaeological building recording in
accordance with a written scheme of investigation be submitted by the applicant
and approved in writing by the local planning authority before any development
took place. There is no record of this
recording having taken place before the buildings were demolished.
These buildings had been demolished without the
developers undertaking an asbestos/contamination demolition survey.
December 2017 onwards the drains were dug out and the foundations of the care facility on site were marked out. There were mounds of contaminated soil on site, contaminated soil was being moved around the site.. Every time soil was being lifted and moved around site, workers and the public were being contaminated. Contaminated dust was being blown over into properties in Abbots Close, backing on to the site and further afield into properties at Abbots Way.
The developers and Sefton Council officers knew exactly what contaminants had been identified in August 2017 :- Lead, Nickel, Arsenic, Benzo (b)fluoranthene, Benzo(a)pyrene, Dibenzo(ah)anthracene and Asbestos (Chrysotile (white) and Amosite (brown) and therefore a risk to human health yet unlawful work was allowed to progress on site. None of the contaminated land conditions had been discharged and no remediation had taken place.
Discharge
of contaminated land conditions
23rd
October 2017 - the developers submitted an
application to discharge all 3 pre-commencement of development contaminated
land conditions simultaneously when each contaminated land condition must be
satisfied in order prior to progressing to the next in the sequence. Sefton Council officers should not have
accepted this application when they were well aware that unlawful work had
started, progressed and was continuing on this site since January 2017
contravening Part IIA of the Environmental Protection Act. There had been a number of complaints from
residents during this time because residents were being exposed to contamination. Sefton Council officers should have been
reacting to residents’ complaints and prosecuting those involved in these
environmental crimes instead of forcing through retrospective documentation to
give developers full planning rights to develop the site. We are saying that Sefton Council officers
had now become complicit in environmental crimes.
10th
November 2017 - one of the ward councillors emailed the
Sefton Council case officer requesting a “call-in” of this application so that
it might be discussed by a planning committee “due to various issues which have been raised and need addressing in
full before any conditions can be removed.”
The ward councillor had already emailed various questions relating to
the pre-commencement of development contaminated land conditions and was
unhappy about the case officer’s response. See email of 10th November.
21st
November 2017 – 11 days later the case officer
replied asking the ward councillor for specific reasons why she wished to have
the application heard by a planning committee (“called-in”). There was obviously no intention of stopping
unlawful work on this contaminated site.
Residents were being exposed to contamination and their complaints were being ignored by
Sefton Council and HSE officers.
Residents and their ward councillor wanted to make planning committee
members aware of what was happening on this contaminated site. Sefton Council officers were denying
residents their democratic rights and residents’ safety was being compromised. See email of 21st
November.
We quote from page 73 of Sefton Council’s
Contaminated Land Strategy and the council’s commitment to community
involvement which Sefton Council officers were now failing to follow:-
“Land
affected by contamination may be of relevance to members of the community other
than owners and occupiers. The use and
condition of land may impact on the wider community especially if the
contamination poses a risk to human health.
For those affected by contamination, the Council will endeavour to:
Inform
the affected parties of potential risk arising from contamination
Consult
on proposed actions in relation to contaminated land
Keep
affected parties informed of decisions taken
The
Council recognises the importance of making decisions about contaminated land
matters that are accepted by the community and are both defensible and
transparent.
If
practicable, and indeed necessary the findings of any inspection will be
communicated to the affected community and consultations undertaken on the best
way to achieve the successful remediation of the contaminated land problem.
As
noted above, public acceptance of any decisions made is very important if
contaminated sites are to be managed effectively. Effective risk communication is thus an
essential element in the implementation of this strategy.”
21st
November 2017 – the ward councillor replied to Sefton
Council’s case officer as follows:- The
main concern is protection of residents’ health and safety. It is quite clear that planning have not
ensured that all procedures are followed correctly before demolition takes
place. Can you explain why? Laws are in place to protect the public from
unnecessary exposure to contamination. I
would not expect any conditions to be discharged until a full investigation has
taken place and we can assure the residents that there are no problems with
regard to how the demolition was carried out and that we are able to show them
all the relevant documents to prove this.
I do feel that this particular site and demolition process and the
failure to follow the law and procedures should be brought before the full
planning committee.
The residents have many photographs of what has taken place on the site, together with video recordings and it is very clear that no precautions were taken when the site was demolished. This can have very serious consequences in the future as you will know that only one speck of dust from asbestos can cause problems in the future years. We have a duty to protect existing residents and this has clearly not happened on this site. Some residents had so much dust in their gardens that they were able to take a sample which I believe is being sent off for analysis. It should not be up to residents to try and protect themselves against unlawful demolition and the consequences from this on contaminated land or indeed from buildings that have asbestos in them. There is a clear duty of care here and as a council we should ensure that all our residents are safe. There is a primary school situated close to this site and depending on which way the wind was blowing when the demolition took place we could have a major issue. See ward councillor email 21st November.
22nd November 2017 – the ward councillor emailed the case officer again asking for confirmation that various statements are correct and asking questions concerning unlawful work on this contaminated site and the pre-commencement of development contaminated land conditions. See email of 22nd November.
29th
November 2017 – the ward councillor emailed the case
officer again because she had not received a reply to her email of 22nd
November. She had asked for documents which she had not received and asked for them again as a
matter of urgency. See email.
29th
November 2017 – the case officer replied to the ward
councillor. He was deliberately
misleading her with his answers. At this
point we are asking why had he been ignoring a request to supply documentation
and why was he ignoring the fact that residents were being contaminated? There were two issues here – pre-commencement
of development contaminated land conditions under Part IIA of the Environmental
Protection Act and demolition procedures under the Building Act 1984. The contaminated land conditions prevented any development (including
demolition) being undertaken until those conditions had been discharged and a
full refurbishment/demolition survey had not been undertaken. Demolition could not even be contemplated
until all contamination had been identified and removed lawfully from the
buildings. See email here.
30th November 2017 – Sefton Council’s building control department emailed the ward councillor enclosing intended demolition notice dated 7th February 2017 and Sefton Council’s counter demolition notice dated 2nd March 2017. Where is the demolition asbestos survey and a UKAS clearance certificate to prove the buildings are safe to demolish? However, as stated previously pre-commencement of development contaminated land conditions prevented any demolition taking place on this contaminated site. See email here.
6th
March 2018 – The ward councillor emailed the case officer
asking for an update. The
pre-commencement of development contaminated land conditions had not been
discharged and the application had not been brought before a planning
committee. Meanwhile unlawful work was
continuing on site. See email here.
4th
April 2018 – a month later a team leader replied to the ward
councillor. He advised there had been a
long delay in the determination of the application due to the requirement of
additional information that was requested from the council’s archaeological
advisor. He confirmed that the
information has now been received and acceptable information has been submitted
to the authority to grant approval of the application. He appreciated that the ward councillor had
requested the application to be called-in for consideration by members of the
planning committee. However, the
constitution (which was amended on 25th January 2018) allows the
ability for such applications (which are in essence a technical assessment of
details following the substantive decision) be delegated to the Chief Planning
Officer. For such reason, I can confirm
the application has now been approved. We are saying approval of pre-commencement of development contaminated land conditions imposed under Part II A of the Environmental Protection Act are not technical matters but acknowledgment of compliance with legislation. The laws of our land cannot be over ridden by a local council's constitution. See email here.
The ward councillor had first made her request on 10th
November 2017 prior to the amendment being made. Residents’ safety had been compromised and
now the council was unlawfully removing residents’ legal rights and councillors' democratic rights. Residents and their councillor had been sent
round in circles allowing developers to continue unlawful work on site and meanwhile
Sefton Council officers were amending the council’s constitution to prevent the
ward councillor calling-in the application.
Sefton Council officers had forced through a so-called democratic vote
by elected members to remove residents’ democratic rights to safety.
Unlawful
demolition of buildings on site
Demolition procedures come under the Building Act
1984 and require prior notice to be given to the Council, statutory bodies and
affected residents. Developers are also
required to submit documentation (such as a method statement for the demolition
and in this case a pre-demolition asbestos survey) to the Council in support of
their demolition application.
On
3rd February 2017 a Risk Assessment and Outlined Method
Statement for the safe demolitions and site clearance at the Mayflower site was
prepared by a demolition company and submitted to Sefton Council. Page 6 of this Method Statement under
Section 5 “Tasks covered within this method statement” acknowledges the
existence of licensed asbestos contaminated materials on site. How can you have a method statement when a
refurbishment/demolition asbestos survey has not been undertaken and the full
extent of contamination in and on the buildings and on the site itself has yet
to be determined? The full extent of contamination was not
determined until August 2017 with the submission of a revised Phase II Ground Investigation Report.
A Phase I Preliminary Investigation (1st
contaminated land condition) had accompanied the original Planning Application
but this was considered to be insufficient by Sefton Council’s contaminated
land officer and a number of concerns highlighted that needed to be
addressed. One concern was the proposal
to undertake site investigation while the site was still operational which
obviously restricted access for site investigation works.
7th
February 2017- the
developers submitted a notice of intended demolition to Sefton Council naming
the demolition contractor and the
intended date of demolition as 1st March 2017.
No notice was given to effected residents. See notice of
intended demolition.
2nd
March 2017 - Sefton Council issued a counter-demolition notice
of intended demolition. This sets out
rigorous procedures to be followed under Section 81 of the Building Act where
demolition is concerned and also removal of asbestos from buildings prior to
demolition under The Control of Asbestos Regulations. We quote from the
document “Asbestos has been used in all
sorts of places and you cannot assume the buildings are free of it.” And “Prior
to demolition you have a legal obligation to ensure that all the buildings
involved are free from asbestos containing materials.” A refurbishment/demolition asbestos survey
had not been undertaken. See counter-demolition notice of intended demolition.
This document was supposedly copied to affected
residents in Abbots Close, Lovelady Grove, Royal Crescent, Alt Road, Gable Mews
and Liverpool Road, Formby. Checks have
revealed that residents most certainly did not receive copies.
Why did Sefton Council issue a counter-demolition
notice without a refurbishment/demolition asbestos survey and when there were
historic surveys still to be undertaken and contaminated land conditions had
not been discharged?
Where is the UKAS clearance certificate to say that
the buildings are clear of asbestos before being demolished?