Tuesday, 31 August 2021

Illegal Waste Site Formby

 Retrospective Planning Applications DC/2020/0098 and DC/2020/02197


This site (in the green belt and on a flood plain) had been heavily promoted by Sefton Council officers for inclusion in their Local Plan as an employment site.  At the public Inquiry into the Local Plan in 2015 this land was the subject of a protracted argument with Formby Parish Council and Formby Residents’ Action Group fiercely defending the destruction of agricultural land/green belt which resulted in the Government Inspector determining that this site should not included in the Local Plan for development and thus retain its green belt status.  The land was also subsequently not included in Formby’s Neighbourhood Plan.

For over 12 months the site was allowed to operate unlawfully by Sefton Council officers (after complaints from both Formby Parish Council and 2 Independent ward councillors) without planning permission and without an environmental permit licence on green belt land on a flood plain without any consideration of the effects on the general public and workers on site who were being exposed to contamination as well as groundwater contamination and destruction of wildlife.  An illegal tip was being run adjacent to football fields used regularly by local clubs, a recycling centre used by a constant stream of residents, as well as a Tesco superstore and a number of other commercial premises, including a cycle store.  There are also a number of housing estates close by.  

Sefton Council officers could and should have stopped this site when 2 Independent ward councillors and Formby Parish Council first complained that a community was being exposed to contamination.  Officers were more intent on keeping the site going and forcing through a planning application which was against the local plan, the neighbourhood plan and the joint waste management plan to enable the site’s operators to continue.

Hazardous waste (said to have originated from construction/demolition and roadworks) was being dumped without any legal procedures being followed concerning the carriage of waste/hazardous waste such as consignment notes showing its origin and no testing to identify contaminatives within this waste had been carried out.   This hazardous waste was being crushed on site and then sold on as aggregates contaminating a wider area.  This waste could have come from contaminated sites such as the ones described in our Blog. The operators claimed at first that the works were in line with an old planning application and then in relation to drainage works for a company who wanted to store equipment on site associated with an application in the pipeline for a new clubhouse and community hub.  Sefton Council officers were well aware of the developers’ real intentions for this site but relayed these fabricated excuses to Formby Parish Council to enable the developers to continue working unlawfully on site.   

The Environment Agency avoided their legal responsibilities in protecting residents and our environment.  They were aware that this site was operating unlawfully because in July 2020 Sefton’s Drainage Manager had contacted the Environment Agency concerning water contamination when the Environment Agency had confirmed that the activity was not licensed and that they had referred the matter on to the relevant team for investigation.  These were serious environmental crimes which needed to be stopped and investigated immediately.  If they weren’t prepared to do their legal duty who else could do it?.  The Environment Agency had also commented on 2 separate retrospective planning applications – in August 2020 and January 2021.  The Environment Agency knew these applications were retrospective and should have taken a lead when they knew waste was being dumped unlawfully.

Unlawful work was allowed to continue on this site for nearly 12 months and.it was not until 5th February 2021 that an Environment Agency officer visited the site accompanied by Sefton Council officers after  Formby Parish Council had taken the initiative bypassing Sefton Council officers.  The Parish Council had complained to the Environment Agency in relation to dust escaping off site and the activity not being authorised and had submitted photographs of the illegal waste site.  The report on the site visit is damning for all concerned - Environment Agency, Sefton Council officers and developers.  .Despite the evidence in this report of 5th February 2021, the site was allowed to continue operating unlawfully.  

Here is the link to this Environment Agency report and the following are extracts from it:-

“At the start of the inspection we were informed there was no waste on site, this was clearly not the case and over 4,000 tonnes of construction and demolition waste EWC 170107 and with the absence of any testing for contaminants this could also be considered as hazardous under EWC code 170106*.

Other distinctive waste piles could be seen including waste containing soil and stone EWC code 170504 again no testing had been carried out on this waste and could also be considered hazardous waste under EWC code 170503*.

All waste was said to have originated from construction/demolition and roadworks

As all waste was being treated on site prior to export without any sufficient waste acceptance criteria (WAC) testing the material produced would still be considered waste.  The treatment consisted of the mechanical treatment (e.g. .sorting, crushing, compaction) therefore this would change the waste code to chapter 19 under either EWC code 191209, 191211* or 191212.” 

"Location of site

The site shares a boundary next to a recreational football pitch with no fencing, screening or netting to prevent dust and debris from blowing onto the pitch or impacting on people using the facility.  It is understood the predominant wind direction is Westerly/South Westerly which would increase the likelihood of dust blowing off site onto the football pitch and any spectators.

As no testing has taken place of the waste to demonstrate it does not contain any harmful substances and there is a lack of any appropriate measures or procedures to contain any waste, we currently feel this has the potential to cause a risk to human health and contamination off site".

"Site Infrastructure

The site had no sealed surface or known drainage system.  The site comprised of a hardstanding area with no concrete pad, furthermore the waste piles were not contained in bays and kept in distinctive piles to keep track of where each pile had come from.

No dust suppression equipment was found on site and site fencing was lacking in the area storing waste allowing unrestricted access from the fields to the rear of the site.

Observations on the day found that the areas directly around the waste piles had standing water and it was not clear if this could escape off site.”

“Application for Authorisation (Environmental Permit)

The company explained they were looking at applying for a standard rule permit, it was unclear on the status of this and a request had been made to clarify the type of permit and what stage this may be at. 

An application for an Environmental Permit would take 3 months from submitting an application, if all the correct paperwork, fees and suitability is met but in the meantime the site would not be allowed to retrospectively operate and a stop and clear letter will be sent separate to this report.” 

On 11th February 2021 in an email to the ward councillor, the head of planning confirmed that the Environment Agency had not yet issued a stop and clear notice but this was imminent. and it would be served on the businesses using the site.  

When work was still continuing on site, heaps of hazardous waste were growing bigger by the day and Formby Parish Council had not received a reply from the Environment Agency to their complaint, Formby Parish Council submitted a Freedom of Information request to the Environment Agency.  The Environment Agency denied that a stop and clear notice had been issued, only a stop and clear warning letter had been sent out.  These environmental crimes carry heavy fines and/or imprisonment but the operators were so confident that they would not face prosecution that they ignored the Environment Agency’s warning letter and continued working on site.  Not having a licence alone is a prosecutable offence.

The Environment Agency had already gone against their intention to issue a stop and clear notice – an intention which is clearly documented by a Sefton Council Environmental Health Officer who had accompanied Environment Agency Officers on their site visit on 5th February 2021.  This officer’s comments on the second planning application were based on this site visit.   

Unknown to Formby Parish Council and residents who had complained, the Environment Agency then did a complete U-turn and issued a licence to these operators who were committing these environmental crimes.  (The issue of this licence was confirmed in an email from the Head of Planning to the ward councillor on 16th March 2021).  The Environment Agency had in effect retracted their intention to pursue prosecutions with a stop and clear notice to enable them to issue a licence to allow developers to continue working unlawfully on site.  You can’t ask developers to stop and clear a site with a letter, object to a planning application for this site which Sefton Council officers were trying to force through and then issue a licence for operators to continue against all the constraints of this site which is what the Environment Agency have done.

Those who are employed to protect the environment and the general public are actively encouraging and are complicit  in environmental crimes.  Complainants (in this case Formby Parish Council who were trying to protect their environment and their community from contamination) should not be treated with such contempt  and excluded from discussions on protecting their environment and the safety of their residents. 

The Environment Agency’s actions on this site mirror what happened in 2005 when 44,000 cubic metres of hazardous waste, including white, brown and blue asbestos was being dumped on a nature reserve in Scarisbrick, Lancashire by the owner of a waste transfer station and the Environment Agency alleged the offender “bends the rules” (http://news.bbc.co.uk/1/hi/magazine/4457663.stm).   This is much more than bending rules.  These are environmental crimes seriously affecting people's health.  If this individual had been prosecuted  in 2005 (as the law states) this would have been a deterrent not only to him but others.  He was caught once again in 2013 by residents exposing a community to contamination (including asbestos) with unlawful demolition and unlawful removal of hazardous waste from a contaminated site when legislation did not permit this. Now in 2021 instead of stopping the site, making it safe and prosecuting those involved in environmental crimes, the Environment Agency have issued a licence which will allow these same individuals to continue contaminating the general public.  See Permit on Environment Agency Public Register.

Formal complaint

On 9th June 2020 Formby Parish Council made a formal complaint to Sefton Council’s Monitoring Officer regarding a breach of planning and Sefton Planning department failure to prevent this.  The Parish Council were concerned that work was still proceeding on the site (a number of photographs were included to prove this allegation) and wanted to see this unlawful development halted and immediate action taken to ensure the site was returned to previously undeveloped land within the green belt. A further company Mersey Aggregates are now advertising their presence on this site. (facebook adverts?)  The land, which is in a flood plain, has been re-profiled without any consultation with or approval from the Environment Agency. We cannot accept that unauthorised development within a flood plain can be construed as of no potential harm to the environment.  Have the Council informed the Environment Agency?  If so, what is their view?  We consider this was preventable if Sefton had acted when we first notified of this. We want to lodge a complaint, under the Sefton Council proscribed complaints procedure, in the strongest possible terms.

On 1st July 2020 Sefton’s Head of Planning replied that he was unable to uphold the complaint. He acknowledged there was no disagreement that development had taken place on this site and that it required planning permission.  He alleged planning enforcement staff visited the site the day after the complaint was made and that planning services responded quickly.  The site’s operator said he believed there was planning permission for the site.  A subsequent check by planning revealed this planning permission dated back to 2002 for Formby Football Club for football facilities but this work was quite different.   An application for planning permission was requested to cover the works that had been carried out and in respect of the future use of the land.   We have to ask why were Sefton Council officers requesting that an application be submitted when they should have been issuing a stop notice to prevent illegal dumping of hazardous waste on a green belt site on a flood plain?  There was obviously no intention of stopping this site to protect a community.  

The Head of Planning argued that the site did not have the status of undeveloped land in the green belt because the Formby Football Club has an outstanding permission for football facilities and stand building.  The owner had indicated he would like temporary permission for the waste recycling business within part of this site to generate income to enable the football club to be viable.  We have to ask why were Sefton planning officers going along with this fabricated story and trying to sell the concept to Formby Parish Council?

The Head of Planning’s excuse for not taking enforcement action was that Government is encouraging Local Planning Authorities to take a more flexible/pragmatic approach to enforcement and to help businesses respond to C-19 and recover from the economic crisis.  We are talking about a business operating unlawfully and dumping waste in a very sensitive area with the risk of contamination not only to the public but also to the ground itself which is on a flood plain.

It is obvious from this reply that from the outset Sefton Council intended giving planning permission for inappropriate development within the green belt and contrary to Sefton’s local plan, the neighbourhood plan and the joint waste management plan.

Planning Applications and meetings between Formby Parish Council and Sefton Council’s head of planning

On 10th June 2020 a retrospective application was submitted for a construction waste recycling centre.  In August 2020 Sefton Council’s Head of Planning met with Formby Parish Council.  The Parish Council was informed that the planning application which had been submitted would be recommended for refusal based on the lack of necessary detail and failure to make any planning case for the proposal.  The idea that a construction waste recycling facility in the green belt on a flood plain had any likelihood of receiving planning consent could never be high.  Despite this the Head of Planning seemed optimistic that a future application would be approved.  This optimism was shared by the site’s operators who had now set up a Facebook page confident that their business would be unaffected by their failed planning permission.  Parish Councillors attending the meeting were reassured that upon refusal an enforcement notice would be issued to the landowner and operators of the site.  On 16th September 2020 the first retrospective planning application was refused and on 17th September 2020 an enforcement notice was served.  See decision notice for first planning application and copy of the first enforcement notice allegedly wrongly served.  

In October 2020 when there were no signs of the operation winding down, a Sefton Borough Ward Councillor emailed Sefton Council officers [MB DL October 8 2020] requesting that a stop notice be issued immediately. The amount of material arriving at site was accelerating and there was a flood alert for the river alt, with this material occupying large amounts of the flood plain and the potential to contaminate the water.  Sefton Council replied that nothing could be done until the enforcement notice came into effect and that the circumstances did not warrant a stop notice.  Sefton Council officers were purposely enabling developers to continue working unlawfully on site by going down the planning enforcement route with its right of appeal to Central Government which could take up to 12 months before being heard and then the Inspector could give a further period of time for compliance.  A Stop Notice would take effect immediately and result in prosecution.  A Stop Notice should have been issued because a community had been exposed to contamination as well as the land itself.  Copy of email to Sefton.

In mid December 2020 another meeting was held between Sefton Council’s  Head of Planning and the Parish Council.  The enforcement notice allegedly had been incorrectly served, subsequently withdrawn and Sefton Planning Department hoped that the matter would be resolved by the receipt of another planning application for the same facility which duly arrived in January 2021.   The Head of Planning tried to persuade the Parish Council that the best course of action would be to give the operators temporary planning permission for 12 months so that Sefton Council officers could regulate the conditions imposed on the planning approval.  If the operators contravened the conditions, Sefton Council would take them right to court.  How on earth would the environmental constraints be overcome in the green belt on a flood plain and when all legislation had been contravened?  Formby Parish Council rejected this idea insisting that the site must be returned to its green belt status.  Copy of Formby Parish Council’s objection to second planning application.

On 11th March 2021 Sefton Council had no option other than to refuse the second retrospective planning  application, with objections from Formby Parish Council, the Environment Agency and then the findings of a site visit on 5th February 2021. On 1st April 2021 Sefton Council then issued a further enforcement notice which took effect on 7th May 2021.  However, Sefton Council has still failed to issue a stop notice.  This meant that the site could continue to operate up to the date the enforcement notice took effect (7th June 2021). See refusal notice for second application.  See Sefton’s enforcement notice 1st April 2021.

To date some material has been removed from site and the mounds have been reduced in part by spreading the remaining waste over a larger area to conceal their height but there has still been no attempt  to restore the site  to its former condition.  The report produced by the EA inspector – following the site visit on 5th February 2021 goes on to point out that, “as all waste was being treated on site prior to export without any sufficient waste acceptance criteria (WAC) testing the material produced would still be considered waste.. There has been no attempt by Sefton Council or the EA to determine where this waste originates or where it is going or to ensure that the site is restored to its former condition.  .

The site’s operators have now been given an extension to the enforcement notice deadline which expires on 19th July 2021.  However given the lack of intervention previously demonstrated by Sefton Council and the Environment Agency our fear is that this situation is far from being resolved and we are seeking the involvement of central government in this matter.  Formby Parish Council are asking that the actions of Sefton Council and other regulators such as the Environment Agency be investigated and that where appropriate the Secretary of State issue appropriate planning guidance with regard to the future handling of similar matters within Sefton and elsewhere.

Statutory bodies, such as the Environment Agency and HSE, have been put in place to protect the public’s safety and our environment.  Our evidence proves they are failing to do so and are actively involved in allowing environmental crimes to continue.  Contamination is being spread far and wide

Below are the various email exchanges between ward councillors/Formby Parish Council and Sefton Council officers which we now refer to as the “merry-go-round” enabling developers to achieve what they set out to do.

On 23rd April 2020 an Independent Formby ward councillor emailed a Sefton Council planning officer expressing concern that large earthworks were taking place, heavy equipment was on site and high embankments had been created.  He could find no record of a planning application and suggested the planning officer involve Sefton’s drainage team and the Environment Agency.  It was Sefton Council’s duty having been alerted by one of their ward councillors to issue a stop notice immediately to prevent further development on this agricultural land in the green belt and on a flood plain and prevent a community being exposed to contamination. 

A week later the planning officer responded alleging the site had planning permission for a hardstanding area, making an excuse that officers needed to get further information before coming to a conclusion as to whether consent is required for the various works.  They would then get back to the ward councillor.  This is a delaying tactic to enable developers to continue working unlawfully on site and we now know the planning officer was referring to a permission in 2002 which was quite different to the work currently taking place.  

Another month went by which allowed the developers to continue working unlawfully on site when the site should have been stopped.  On 17th May 2020 the ward councillor emailed the planning officer once again because illegal development was continuing.  There was an increase in heavy machinery and the development on site was much larger.  It was now obvious that it was not just an earth moving exercise.  The ward councillor emphasised that the site had been specifically excluded in the Local Plan from development following an additional Inquiry meeting and was also not included in the Formby Neighbourhood Plan.  He asked for action to be taken to establish the intent of the site owner and to cease the work which appears to be in preparation for development and not merely a hardstanding. 

On 20th May 2020 the planning officer replied.  Two officers had now met with the site owner to discuss the situation on the site.  They understood there may have been some meetings re the development of the site (new clubhouse, community hub etc) and an application is being prepared for the near future.  In the meantime the works on site which have involved the scraping back of earth to the side of the site and rear of the waste recycling centre are in connection with drainage repair works. That work has been completed and planning officers advised that the earth mounds will need to be levelled back across the area where the works have taken place as the mounds themselves constitute development for which planning permission is required.  Separately a company (who undertook the drainage repairs) have set up a small compound on the site and are operating their business from this location (storage of materials / equipment etc….). Planning officers have advised that this is a change of use of the land for which planning permission is required. As it’s Green Belt a permanent approval would not be granted, however a temporary permission may be possible potentially linked to the site owner being able to demonstrate how such a temporary use might be able to assist the retention of the Football Club, a valued local community asset. The advice given was for the company to either cease the use and clear all the equipment, materials etc…. or alternatively apply for temporary permission. Specifically the site owner was asked to level the mounds as a first step.

Unlawful development was taking place, a ward councillor was asking for this to be stopped and Sefton Council officers were enabling developers to continue working unlawfully on site with various excuses and exploring the possibility of issuing retrospective temporary planning approval when Sefton Council officers should have and could have stopped the site to protect the green belt and a community from contamination.  At this stage the ward councillor was unaware that hazardous waste was being imported on to site, contaminating the whole site and surrounding area.

On 21st May 2020 another Independent ward councillor emailed the Head of Planning, planning officers and the Chief Executive, stressing the urgency for reply as works were continuing and commenting that planning officers just accepted what they were told by developers instead of investigating;  The ward councillor requested details of the drainage repairs as she was unaware that there had ever been any normal drains on this site as it was just open land (a flood plain in the green belt). See emails 2020 6 0 (May-Jun 2020) cllr queries responses from planning enforcement.pdf

The developers had not complied with the instruction to level back the works that had taken place and there was a vast amount of very large construction vehicles still on site, none of the works form part of the policies within either the local plan or Formby and Little Altcar neighbourhood plan.  There has been no discussion with the parish council when it is clear that there should have been. It is again another instance of development taking place without planning permission being given without any consultation and the developers not being forced to put things right.  All works should be stopped immediately, the bunds removed, and the land put back to as was as there is no planning permission. Discussions do not constitute planning permission.  This is certainly not open or transparent and clearly antagonises people who feel that they are being misled.

Another 2 weeks went by and unlawful work was progressing on site.  On 1st June 2020 the Head of Planning replied I apologise for the delay in replying to you. I have needed to speak to a number of colleagues to respond fully to the questions you raise.   At the outset I would like to assure you my enforcement team are going above and beyond in carrying out their duties at this very challenging time for all of us. You will understand there are strict guidelines about visiting sites which limit the team’s ability to carry out full investigations. In fact it wasn’t intended that they meet anyone on site when they visited recently.

You suggest we can insist that works stop when they are not permitted. Though that may be the wish of local people, that is not how the Government intend the enforcement system to work. There are clear guidelines governing what action is appropriate.  

The Head of Planning is deliberately misleading a ward councillor.  We are saying that Sefton Council officers are not complying with planning law or environmental law.  We have discovered that instead of stopping the sites to protect communities delaying and misleading tactics are used on all sites when residents and councillors complain actively enabling developers to continue working unlawfully on site.

On 17th December 2020 one of the ward councillors emailed the Head of Planning proposing an urgent meeting be convened between the Environment Agency, the Head of Planning and Sefton’s Drainage Manager, a representative from the Parish Council and the ward councillor himself.  The Head of Planning alleged contact had been made by the Drainage Manager in July 2020 with the Environment Agency about water contamination when the Environment Agency had confirmed that the activity was not licensed and that they had referred the matter on to the relevant team for investigation.  The Head of Planning promised to set up a meeting to establish how far the Environment Agency had got with their investigation.  Both Sefton Council and the Environment Agency were obviously aware in July 2020 that material coming onto this site had the potential to be contaminated and should have taken appropriate action to stop the site immediately to protect the land and also the surrounding community. See email 2020 12 0 (Dec 2020) Cllrs Concerns over Contamination.pdf

The Head of Planning then refers to comments from a parish councillor about potential contaminants affecting usage of the football pitch which would have given the Council a route into considering issuing a statutory Stop Notice.  He had followed this up with the Council’s Environmental Health lead officer and it was confirmed that there Is insufficient information to demonstrate any harm and that the Council had limited involvement in this matter as any regulatory control or enforcement sat with the Environment Agency who are clearly aware of the breach. Sefton Council would attempt to put some pressure on the Environment Agency to look into the matter but he needed to emphasise that the statutory planning process and the Environment Agency licensing process are separate and are not mutually dependant.

Unlawful work had been continuing on site since April 2020, ward councillors and the parish council had been continually expressing concerns for the safety of the community.  Hazardous waste was being dumped on a green belt site in the flood plain affecting the land (water contamination), wildlife and exposing a  community to contamination.  There had been no assessments/testing of what contaminants were in this hazardous waste.  There was no paperwork i.e. consignment notes to indicate where this hazardous waste originated  (The Environment Agency class waste as hazardous when it has not been tested and its origins are unknown.)  The site did not have planning permission or an environmental permit.     Mounds of waste were growing bigger by the day.  There was mud on the road from lorries driving on and off the site, moving contamination onto public roads.  Hazardous waste was being crushed on site and sold on as aggregates to unsuspecting recipients and contaminating a wider area.   Now a Council’s Environmental Health lead officer was making assertions that there was insufficient information to demonstrate any harm which the Head of Planning was relaying to a parish council and ward councillors to mislead them into a false sense of safety and enabling unlawful work to continue on this site.  

The Head of Planning (alleging he had taken legal advice) tried to convince the parish council that the best course of action would be to grant planning permission for a 12 month operation to maintain some form of control.  For this reason Sefton Council intended accepting a planning application which must arrive before 15th January 2021 and taking it to planning committee for determination.  Our experience is that the planning committee is controlled by planning officers.  It is very rare that officers’ recommendations are challenged.  Sefton Council officers definitely had no intention of stopping this site to protect the community, prosecuting those involved and carrying out their lawful duty.

Sefton Council intended forcing through a planning application which went against policies in the local plan, Formby neighbourhood plan, the joint waste plan and a central government inspector’s decision at a public inquiry.  If approval was given this would set a precedent and force the parish council into legal action to defend their neighbourhood plan.

On 12th January 2021 the Head of Planning emailed a ward councillor confirming the Council had been in touch with the Environment Agency.  No inspection of the site had taken place since first reporting the incident due to Covid restrictions and work pressures, where Environment Agency priority was being given to high risk sites which already held permits or sites which were causing large numbers of complaints and this site didn’t fall into these categories at the time.  The Environment Agency was updated on the current situation and acknowledged the need for a site inspection which they were planning to do in the next 2 weeks.  See email 2021 1 0 (Jan 2021) update on EA visit post granting of permit.pdf

The Environment Agency were well aware that an illegal waste site was operating on green belt land in a flood plain and that the operators did not have a licence.  The Environment Agency should have reacted immediately to protect the community and the environment but were participating in the “merry-go-round”.

On 11th February 2021 the ward councillor emailed the Head of Planning following a telephone conversation asking various questions:-

On whom had the Stop Notice been served? 

  •  Reply -  [The Head of Planning had] "just had confirmation that the Environment Agency had not yet served it but it is imminent.  It will be served on the businesses using the site".  

  • Our comments: On 12th February 2021 the Environment Agency issued a stop and clear letter not a stop and clear notice.  The letter carries no legal weight whereas an official stop notice is a legal document and is enforceable.  Were Sefton Council officers deliberately misleading ward councillors and the parish council or was the Environment Agency put under pressure to change their intention?

You also stated that the Environment Agency stated that no contaminants were on site.  What methodology has been used to determine this?  

  • Reply – I am not sure but this is something you will need to pursue directly with the Environment Agency.  I have copied in the Council’s expert in this matter and he will be able to advise further.   

  • Our comments: The Environment Agency’s report of 5th February 2021 states that the waste must be regarded as hazardous with the absence of any testing for contaminants.  They also commented “as there is a lack of any appropriate measures or procedures to contain any waste we currently feel this has the potential to cause a risk to human health and contamination off site.”

Can you confirm if both the Sefton environmental officer and Environment Agency were on site if they checked any of the lading bills/consignment notes which are clearly trackable?  

  • Reply – Again I do not know this but the 2 officers who were there may be able to advise further.   
  • Our comments: An Environmental Health Officer present at the site inspection on 5th February 2021 commented in his consultee comments to the planning application “As a result of our meeting the Environment Agency Officer made it clear that the activity on site was not authorised and served a Stop and Clear Notice on management due to the lack of permissions held by the operators.  There were other reasons associated with this decision including the lack of evidence at the time to demonstrate the type of waste on site and the potential for contaminants within this. No waste transfer notes, or indeed any records of the type of waste on site were produced during our visit.”

Have you issued the planning refusal notice and if not when will this be issued?  

  • Reply – not yet but as soon as the case officer has fully weighed up the proposal he will be able to issue the decision.  I will ask him to keep you up to speed with his progress.

Can I have a copy of the original enforcement notice that was served on the first planning application and then subsequently withdrawn? 

  •  Reply – I will ask the officer to provide you with a copy of this.

From March to July 2021 the ward councillor continued to email Sefton Council’s head of planning, pressing for Sefton Council to issue an immediate stop notice to protect the community from contamination and have the land returned to green belt with the head of planning giving various ludicrous reasons why this was not possible such as:-  The tests for serving a stop notice are very high.  None of the issues raised would justify the serving of a stop notice which is primarily aimed at preventing harm to human life or irreparable damage to interests of acknowledged importance.  The fact that the Environment Agency has now issued a permit for the use further reinforces the argument that there is no justification to serve a stop notice. 

Emails 

2021 3 0 (Mar 2021) EA permit

2021 3 16 (16 Mar 2021) Cllrs Request for Stop and Clear Notice

2021 4 8 (8 Apr 2021) Cllr_request_For_Council_Enforcement_Action_Following_EA Permit

2021 5 10 (10 May 2021) Enforcement_Notice_Recipients_Redacted

2021 6 0 (Jun-Jul) Post_Enforcement_Notice_Expiry_Request_for_action

Wednesday, 21 July 2021

Former Ambulance Station, Formby – Planning Application DC/2020/02567

 On 19th March 2021 a planning application was approved under delegated powers to erect 3 detached dwellings after demolition of the former ambulance station.  Sefton Council officers remarked that the former ambulance station included a refuelling point and the former underground fuel tank(s) may still be present.  Due to the potential for the land to be affected by contamination, pre-commencement of development contaminated land conditions were imposed on the development under Part IIA of the Environmental Protection Act.  Part IIA defines contaminated land as “any land which appears to the Local Authority in whose area it is situated to be in such a condition, by reason of substances in, on, or under the land, that significant harm is being caused or there is a significant possibility of such harm being caused ……”.  Section 55 of the Town and Country Planning Act defines demolition as development.   (See decision notice showing pre-commencement of development contaminated land conditions) Therefore, no development (including demolition and site clearance) can take place until these contaminated land conditions have been discharged and contamination has been identified, analysed and removed safely and legally.

Discharge of these contaminated land conditions is a lengthy and expensive legal process imposed on developers to protect workers on site, existing and future residents and the general public from exposure to contamination.   It is the responsibility of developers to begin this legal process of discharging these contaminated land conditions through the planning system overseen by Sefton Council’s planning and environmental protection departments.  The conditions are phased and have to be satisfied in order prior to progressing to the next in the sequence (preparation by consultants and agreement with Sefton Council of Phase I report – Preliminary Investigation (contaminated land condition 1), then Phase II report – testing and analysis (contaminated land condition 2) and finally Phase III report – submission of a Remediation Strategy (contaminated land condition 3).   When these 3 contaminated land conditions have been discharged, remediation only (safe removal of contamination from site) can take place. 

It is interesting to note that the pre-commencement of development contaminated land conditions for this site are worded to exclude demolition when the Head of Planning admits on 6th May 2021 in an email to the ward councillor that demolition is classed as development alleging this is because it is included within the description of the proposal.  

Sefton Council officers have been misleading residents and councillors who complain about exposure to contamination on other contaminated sites that the contaminated land conditions relate only to below ground contamination.  This is not what Part IIA stipulates (see 1st paragraph).  This is yet another example of Sefton Council officers interpreting legislation to suit developers and allowing them to contravene pre-commencement of development contaminated land conditions, confident that they will  not be prosecuted when they are unlawfully demolishing buildings with contamination on and in these buildings and knowingly exposing a community and workers on site to contamination.   

When ward councillors request that applications to discharge pre-commencement of development contaminated land conditions are put into a planning committee (“calling-in” the applications) and thereby removing officer delegated powers to highlight the developers’ total contempt of the law and the cover-up by Sefton Council officers, these requests are refused.  Officers maintain these applications are in essence a technical assessment of details following the substantive decision.  We are saying approval of pre-commencement of development contaminated land conditions imposed under Part IIA of the Environmental Protection Act are not technical matters but acknowledgement of compliance with legislation.  On 25th January 2018 Sefton Council’s constitution was amended to allow the ability for such applications to be delegated to the Chief Planning Officer, removing ward councillors’ democratic rights to call-in such applications and protect their communities from exposure to contamination.  The laws of our land cannot be over-ridden by a local council’s constitution when communities are being exposed to contamination and these laws are in place to protect them.   Sefton Council officers had forced through a so-called democratic vote by elected members to remove residents’ legal rights to safety.  Sefton Council are supposed to uphold the law, not undermine it.

On 5th May 2021 a hydraulic machine with grabbers was seen smashing down the ambulance station building.   This demolition was unlawful because pre-commencement of development conditions, including contaminated land conditions, had been imposed on the development and none of these conditions had been discharged.  Contamination on and in the building had not been identified, analysed and removed safely and legally before demolition, as required by law.  Our evidence shows  this was a demolition company who should have been well aware of their legal obligations and that failure to comply with legislation carries heavy fines and/or imprisonment.

This was an emergency and workers on site, residents and the general public were being exposed to contamination, Sefton Council officers had a legal duty to react immediately, enforce the law, make the site safe, issue a stop notice to protect the public from contamination and take prosecution proceedings when they knew the developers had contravened legislation, involving HSE and the Environment Agency where appropriate.  The site needed to be reassessed for contamination.  An official stop notice was not issued and the demolition company was allowed to continue working unlawfully on site, completing the unlawful demolition over a number of days and removing all evidence of contamination from site (demolition debris and building rubble which had never been tested for contamination) i.e site clearance.  Sefton Council officers had no intention of stopping this site (as can be seen from the exchange of emails which follows in this account).  Officers were more intent on enabling developers to continue this unlawful demolition and remove all evidence from site than in protecting a community from contamination.  A ward councillor, who was trying to protect residents, was being sent around in circles.  Our experience shows this is what happens on every site when residents and/or their councillors complain.

This site is in a very busy residental area with a pedestrian crossing right next to the site and with many school children walking past the site to and from school.  Anyone coming close to this site when unlawful demolition was taking place could be contaminated as well as the land itself.    A check with nearby residents revealed they were unaware that demolition was to take place, having not received notice of intended demolition either from the demolition company or Sefton Council officers, both of whom had a legal duty to notify residents because residents’ safety was involved. 

On the 6th May 2021, in a reply to an email from the ward councillor, Sefton Council’s Head of Planning admitted that the developers are required to discharge all pre-commencement conditions prior to starting demolition work, and that he could confirm this has not happened.   At this point we have to ask why has he made no attempt to halt this unlawful demolition and prosecute those involved and why have Sefton Council accepted the developers’ notice of intended demolition?  He also admitted that demolition was classed as development as it is included within the description of this proposal. We are saying in every case demolition is classed as development as stated in Section 55 of the Town and Country Planning Act.  He said that if they demolish to slab level then they will have deemed to have commenced.  We are saying once demolition commences, the developers have contravened the pre-commencement of development contaminated land conditions and there is no way round this because Part IIA is very clear and sets out a legal structure which must be followed and which in this case has not been followed.  This is the first time a Sefton Council planning officer has actually admitted that demolition is classed as development.  He seems more concerned that the developers have not complied with the pre-commencement condition to submit a construction environmental management plan than their failure to comply with pre-commencement of development contaminated land conditions.   Once again a planning officer is misleading a ward councillor who is relying upon him for his technical knowledge.

On Friday, 7th May 2021 the ward councillor received assurance from the Head of Planning that all works will stop and the site made secure until all pre-commencement conditions are discharged.

Unlawful demolition was not halted and the demolition company continued to work on site. 

On Tuesday, 11th May 2021 the demolition company was observed removing from site all evidence of contamination (demolition debris and building rubble) as residents’ photographs confirm.     

Demolition debris being removed 11th May 2021

The site was now contaminated with whatever contamination had been present in the building.   Part IIA of the Environmental Protection Act was introduced by Parliament specifically to prevent this happening and also to protect communities from contamination.

An application to discharge all pre-commencement conditions (including contaminated land conditions) was subsequently received on 7th May 2021 (after the buildings had been unlawfully demolished contravening Part IIA of the Environmental Protection Act).  The application to discharge the contaminated land conditions was refused on 8th June 2021 because the combined Phase I and II report was 5 years old as was the Phase III report (remediation strategy) the reason given was that contamination conditions may have altered significantly.   

However, on 1st July 2021 Sefton Council  accepted a further application to discharge the first three contaminated land conditions and also the validation condition simultaneously.  Sefton Council officers had validated and accepted an application to discharge all 3 contaminated land conditions simultaneously when Part IIA of the Environmental Protection Act stipulates a very legal structure (see 2nd paragraph of this account)  and each condition must be discharged in order prior to progressing to the next condition in the sequence.  No legislation had been followed and now Sefton Council officers were enabling developers to discharge contaminated land conditions and there was definitely no intention of taking any prosecution proceedings.  

The same combined Phase I and II report, together with the Phase III report accompanied this application which was approved on 20th July 2021 with the exception of the validation condition, with the reason given that this condition is applicable to further works involving verification of remedial works (certifying that contamination has been removed) and therefore cannot be discharged at this stage..

There was also a letter from the developers’ environmental consultants stating that in their opinion no material changes had taken place since the issue of their report and that the findings of the report remain valid.  They also gave an undertaking to attend site during the removal of the former in-ground fuel tank, for the purposes of directing any soil remediation, undertaking validation sampling and testing of in situ soils and imported backfill materials and preparing a formal report.  The developers submitted their own letter stating that the potential for changes to contamination have been eliminated as the fuel tank, associated pipework and manhole chamber were permanently decommissioned in March 2012.  They also confirmed that the site had remained unoccupied since the site investigation (we are saying this is an untrue statement because the developers have been responsible for unlawful demolition on site, including removal of the building’s slab and site clearance of all demolition material, thereby altering the site characteristics and contaminating the land further).  A certificate of tank decommissioning, previous site owner’s confirmation of vacant site and various photographs of the vacant site to substantiate their allegations were also included.   

Sefton Council officers have acted unlawfully by now accepting Reports which are 5 years old (reports which they had originally rejected after the buildings had been unlawfully demolished, the reason given because contamination conditions may have altered significantly).   Sefton Council officers have now discharged all 3 pre-commencement of development contaminated land conditions simultaneously (when Part IIA does not allow this and these conditions have to be discharged in sequence) and accepted the developers’ untrue statement that the potential for changes to contamination have been eliminated.  Sefton Council officers have allowed a community to be contaminated and are now covering up for the developers’ reckless unlawful behaviour and giving them development rights instead of pursuing prosecutions.

Gallery here

The developers had contravened  pre-commencement of development contaminated land conditions under Part IIA of the Environmental Protection Act which required potential contamination to be identified, analysed and removed safely and legally before any development, including demolition and site clearance took place, demolition procedures under the Building Act,  the Control of Asbestos Regulations and also HSE Construction Design and Management Regulations and had thereby exposed a community to contamination, as well as spreading contamination over the land.  It is impossible now to undertake a pre-demolition asbestos survey and a survey of what contamination existed on and in the building when demolition has been allowed to be completed and all evidence removed from site.

The Phase I ground investigation report undertaken in 2016 identified the following contaminants on this site as posing a risk to human health:-  lead, mercury, benzo(a)pyrene and dibenzo(ah)anthracene.  Asbestos contaminants were not present in any sample analysed in 2016 when the building itself was not surveyed for contamination.  However, as stated previously the site is now contaminated with whatever contamination had been present in the building, including asbestos and Sefton Council Officers are well aware that the site needs to be reassessed for contamination but are deliberately overlooking this to protect not only developers but also Sefton Council's involvement. (See Decision Notice showing the refusal of contaminated land conditions and Phase I and II report showing the contamination).

Once again developers have been caught by residents undertaking unlawful development on a contaminated site and Sefton Council officers covering up for these developers.  An independent investigation needs to be undertaken to prevent similar occurrences ever taking place again. Our present systems are open to corruption.


Friday, 23 October 2020

Mayflower Industrial Estate

 Pre-commencement of development contaminated land conditions had been imposed on the development in January 2017 under Part IIA of the Environmental Protection Act.  These conditions had to be discharged before any development/site clearance could take place on this contaminated site.  Under Section 55 of the Town and Country Planning Act “demolition” is classed as “development”. See approval notice here.

This structured legal procedure is put in place to protect residents, the general public and workers on site from exposure to contamination and ensure that developers do not undertake unlawful work on site to cut costs as happened here.

The contaminated land conditions are phased and each condition must be satisfied in order prior to progressing to the next in the sequence.  Contaminated land condition 1 involves a preliminary assessment (Phase I Report) of potential contaminants relating to the site’s present and past uses which must be approved and discharged by the local authority.  Testing and analysis – contaminated land condition 2  (Phase II Report) then follow to confirm the findings of the Phase I Report.  The 2nd contaminated land condition is then discharged with local authority approval of the Phase II Report.  On the findings of the Phase I and Phase II Reports a remediation strategy – contaminated land condition 3 (Phase III Report) is then prepared for discharge by the local authority.  Only then when all 3 contaminated land conditions have been discharged can remediation of the site/removal of contaminants take place.

Under pressure from residents and their councillors who were fearful for residents’ safety and were continually asking Sefton Council and HSE officers to stop the site and make safe, Sefton Council officers then validated an application from the developers to discharge all 3 contaminated land conditions simultaneously when each condition must be satisfied separately and in a particular order in accordance with Part IIA of the Environmental Protection Act.  This application was subsequently approved by Sefton Council officers under delegated powers on 5th April 2018.  See application to discharge all 3 contaminated land conditions and approval notice.

Before any of the contaminated land conditions had been discharged on 5th April 2018 (which would permit remediation only to take place), the developers of the Mayflower site were allowed by Sefton Council and HSE officers to undertake demolition, site clearance, excavation and groundwork for drains and demolition debris was also crushed on site in contravention of Part IIA of the Environmental Protection Act and exposing residents to further contamination.  Sefton Council and HSE officers had knowingly allowed developers to contravene legislation imposed on this development to protect the general public from exposure to contamination.

Residents’ safety had been compromised.  Sefton Council officers were well aware of all the unlawful practices that had taken place but were not prepared to comply with the law by stopping the site.  They were more intent on issuing retrospective documentation which would allow unlawful work to progress further exposing residents to contamination.

Sefton Council officers withheld this site’s status as a contaminated site under Part IIA of the Environmental Protection Act from affected residents and also withheld notice of intended demolition under Section 81 of the Building Act when it is a legal requirement for a local authority to inform affected residents because their safety is involved.

 

The following is an account of the unlawful practices which Sefton Council and HSE allowed to take place on this contaminated site.  The pre-commencement of development contaminated land conditions had not been discharged and any work taking place on site was unlawful.

February 2017 – unlawful work started on site with the removal of trees (site clearance). 



March 2017  - buildings containing asbestos and other contaminants were being unlawfully demolished and surrounding residents were being contaminated by dust debris from this unlawful demolition.  To avoid attention, the developers had deliberately avoided displaying demolition or asbestos signs as required by law.  Residents complained to both Sefton Council and HSE  believing these authorities would protect them against unnecessary exposure to contamination.   




Between March and August 2017 - before the contaminated land conditions were discharged and a safe remediation strategy agreed, concrete bases, concrete rafts, roads and drainage were removed, water services and electricity disconnected.  Groundwork, including digging out for drainage, took place and contaminated soil was moved all around the site and stockpiled on site.   A machine was brought on to site to crush the demolition debris from the demolished buildings, further contaminating residents.   


On 4th July 2017 an asbestos survey for the Garage only was prepared for the demolition contractors.   This was not a full refurbishment/demolition survey which must be submitted to the council before demolition is even contemplated.  The surveyors recommended that if the report were to be used for demolition purposes, they revisit the site and investigate further. 

Amosite (brown asbestos) was identified at several locations as well as Chrysotile (white asbestos).  Crocidolite (blue asbestos) was identified in the external roof to the garage. Not all areas were surveyed namely behind sampled materials, within live services, areas above 5m in height, limited access within timber box-work to metal flue in area 2, above ceiling voids where no safe walk access could be gained, ceiling void areas were full of scrap material and timber, no access to high level roof, live services throughout, unsafe ceiling access throughout.  

There were a number of other buildings on site which required full refurbishment/demolition surveys to be undertaken and all contamination to be removed safely and legally and UKAS clearance certificates issued prior to the buildings being demolished.

August 2017 -  in a Phase II Ground Investigation Report contaminants with elevated concentrations in soils were recorded as follows:- Lead, Nickel, Arsenic,  Benzo (b)fluoranthene,  Benzo(a)pyrene,  Dibenzo(ah)anthracene and Asbestos (Chrysotile (white) and Amosite (brown) and therefore a risk to human health.  See Phase II report.

September 2017 - residents were involved with HSE and Sefton Council with concerns over health and safety.

October 2017 photographs were submitted to Sefton Council’s Environmental Protection Department showing severe dust contamination lying on outdoor furniture in a property at Abbots Close which backs on to the site.  Cars in Abbots Way, further from the site, were also covered in dust contamination.  The crushed debris was heaped on the site some 20ft high at this time.    


A Sefton Council officer came out to Abbots Close and took photographs himself of substantial amounts of brick and building debris lying on a table.  He recommended reduction of the mound and covering it.    The officer should have stopped unlawful work on site to protect residents from further contamination.  The mound was not reduced until December 2017 and was not covered.  The building debris remained on site still uncovered and residents were being subjected to contaminated dust being blown over from the site. 

CIRIA (Construction Industry Research and Information Association) advises that building rubble may contain free fibres of asbestos and fragments in rubble can be difficult to detect by the naked eye (Asbestos in soil and made ground: a guide to understanding and managing risks. Ready reference (SP168). 

By November 2017 buildings associated with the late 19th Century Reciprocity Brewery had been demolished.   A condition had been placed on the Planning approval (condition 3), in the interests of built heritage, requiring the implementation of a programme of archaeological building recording in accordance with a written scheme of investigation be submitted by the applicant and approved in writing by the local planning authority before any development took place.  There is no record of this recording having taken place before the buildings were demolished. 

These buildings had been demolished without the developers undertaking an asbestos/contamination demolition survey. 

December 2017 onwards the drains were dug out and the foundations of the care facility on site were marked out.   There were mounds of contaminated soil on site, contaminated soil was being moved around the site..  Every time soil was being lifted and moved around site, workers and the public were being contaminated.  Contaminated dust was being blown over into properties in Abbots Close, backing on to the site and further afield into properties at Abbots Way. 


The developers and Sefton Council officers knew exactly what contaminants had been identified in August 2017 :- Lead, Nickel, Arsenic,  Benzo (b)fluoranthene,  Benzo(a)pyrene,  Dibenzo(ah)anthracene and Asbestos (Chrysotile (white) and Amosite (brown) and therefore a risk to human health yet unlawful work was allowed to progress on site.  None of the contaminated land conditions had been discharged and no remediation had taken place. 

Discharge of contaminated land conditions

23rd October 2017 - the developers submitted an application to discharge all 3 pre-commencement of development contaminated land conditions simultaneously when each contaminated land condition must be satisfied in order prior to progressing to the next in the sequence.  Sefton Council officers should not have accepted this application when they were well aware that unlawful work had started, progressed and was continuing on this site since January 2017 contravening Part IIA of the Environmental Protection Act.  There had been a number of complaints from residents during this time because residents were being exposed to contamination.  Sefton Council officers should have been reacting to residents’ complaints and prosecuting those involved in these environmental crimes instead of forcing through retrospective documentation to give developers full planning rights to develop the site.  We are saying that Sefton Council officers had now become complicit in environmental crimes. 

10th November 2017  - one of the ward councillors emailed the Sefton Council case officer requesting a “call-in” of this application so that it might be discussed by a planning committee “due to various issues which have been raised and need addressing in full before any conditions can be removed.”  The ward councillor had already emailed various questions relating to the pre-commencement of development contaminated land conditions and was unhappy about the case officer’s response.  See email of 10th November.

21st November 2017 – 11 days later the case officer replied asking the ward councillor for specific reasons why she wished to have the application heard by a planning committee (“called-in”).  There was obviously no intention of stopping unlawful work on this contaminated site.  Residents were being exposed to contamination  and their complaints were being ignored by Sefton Council and HSE officers.  Residents and their ward councillor wanted to make planning committee members aware of what was happening on this contaminated site.  Sefton Council officers were denying residents their democratic rights and residents’ safety was being compromised.  See email of 21st November.

We quote from page 73 of Sefton Council’s Contaminated Land Strategy and the council’s commitment to community involvement which Sefton Council officers were now failing to follow:-

“Land affected by contamination may be of relevance to members of the community other than owners and occupiers.  The use and condition of land may impact on the wider community especially if the contamination poses a risk to human health.  For those affected by contamination, the Council will endeavour to:

Inform the affected parties of potential risk arising from contamination

Consult on proposed actions in relation to contaminated land

Keep affected parties informed of decisions taken

The Council recognises the importance of making decisions about contaminated land matters that are accepted by the community and are both defensible and transparent.

If practicable, and indeed necessary the findings of any inspection will be communicated to the affected community and consultations undertaken on the best way to achieve the successful remediation of the contaminated land problem.

As noted above, public acceptance of any decisions made is very important if contaminated sites are to be managed effectively.  Effective risk communication is thus an essential element in the implementation of this strategy.”

21st November 2017 – the ward councillor replied to Sefton Council’s case officer as follows:-  The main concern is protection of residents’ health and safety.  It is quite clear that planning have not ensured that all procedures are followed correctly before demolition takes place.  Can you explain why?   Laws are in place to protect the public from unnecessary exposure to contamination.  I would not expect any conditions to be discharged until a full investigation has taken place and we can assure the residents that there are no problems with regard to how the demolition was carried out and that we are able to show them all the relevant documents to prove this.  I do feel that this particular site and demolition process and the failure to follow the law and procedures should be brought before the full planning committee.

The residents have many photographs of what has taken place on the site, together with video recordings and it is very clear that no precautions were taken when the site was demolished.  This can have very serious consequences in the future as you will know that only one speck of dust from asbestos can cause problems in the future years.  We have a duty to protect existing residents and this has clearly not happened on this site.  Some residents had so much dust in their gardens that they were able to take a sample which I believe is being sent off for analysis.  It should not be up to residents to try and protect themselves against unlawful demolition and the consequences from this on contaminated land or indeed from buildings that have asbestos in them.  There is a clear duty of care here and as a council we should ensure that all our residents are safe.  There is a primary school situated close to this site and depending on which way the wind was blowing when the demolition took place we could have a major issue. See ward councillor email 21st November. 

Listen to Radio Merseyside Mayflower Industrail Estate:

22nd November 2017 – the ward councillor emailed the case officer again asking for confirmation that various statements are correct and asking questions concerning unlawful work on this contaminated site and the pre-commencement of development contaminated land conditions.   See email of 22nd November.

29th November 2017 – the ward councillor emailed the case officer again because she had not received a reply to her email of 22nd November.  She had asked for documents which she had not received and asked for them again as a matter of urgency.   See email.

29th November 2017 – the case officer replied to the ward councillor.  He was deliberately misleading her with his answers.  At this point we are asking why had he been ignoring a request to supply documentation and why was he ignoring the fact that residents were being contaminated?  There were two issues here – pre-commencement of development contaminated land conditions under Part IIA of the Environmental Protection Act and demolition procedures under the Building Act 1984.  The contaminated land conditions  prevented any development (including demolition) being undertaken until those conditions had been discharged and a full refurbishment/demolition survey had not been undertaken.  Demolition could not even be contemplated until all contamination had been identified and removed lawfully from the buildings.  See email here.

30th November 2017 – Sefton Council’s building control department emailed the ward councillor enclosing intended demolition notice dated 7th February 2017 and Sefton Council’s counter demolition notice dated 2nd March 2017.  Where is the demolition asbestos survey and a UKAS clearance certificate to prove the buildings are safe to demolish?  However, as stated previously pre-commencement of development contaminated land conditions prevented any demolition taking place on this contaminated site. See email here.

6th March 2018 – The ward councillor emailed the case officer asking for an update.  The pre-commencement of development contaminated land conditions had not been discharged and the application had not been brought before a planning committee.  Meanwhile unlawful work was continuing on site.  See email here.

4th April 2018 – a month later a team leader replied to the ward councillor.  He advised there had been a long delay in the determination of the application due to the requirement of additional information that was requested from the council’s archaeological advisor.  He confirmed that the information has now been received and acceptable information has been submitted to the authority to grant approval of the application.  He appreciated that the ward councillor had requested the application to be called-in for consideration by members of the planning committee.  However, the constitution (which was amended on 25th January 2018) allows the ability for such applications (which are in essence a technical assessment of details following the substantive decision) be delegated to the Chief Planning Officer.  For such reason, I can confirm the application has now been approved.  We are saying approval of pre-commencement of development contaminated land conditions imposed under Part II A of the Environmental Protection Act are not technical matters but acknowledgment of compliance with legislation.  The laws of our land cannot be over ridden by a local council's constitution.   See email here.

The ward councillor had first made her request on 10th November 2017 prior to the amendment being made.  Residents’ safety had been compromised and now the council was unlawfully removing residents’ legal rights and councillors' democratic rights.   Residents and their councillor had been sent round in circles allowing developers to continue unlawful work on site and meanwhile Sefton Council officers were amending the council’s constitution to prevent the ward councillor calling-in the application.  Sefton Council officers had forced through a so-called democratic vote by elected members to remove residents’ democratic rights to safety.

 

Unlawful demolition of buildings on site

Demolition procedures come under the Building Act 1984 and require prior notice to be given to the Council, statutory bodies and affected residents.  Developers are also required to submit documentation (such as a method statement for the demolition and in this case a pre-demolition asbestos survey) to the Council in support of their demolition application.

On 3rd February 2017 a Risk Assessment and Outlined Method Statement for the safe demolitions and site clearance at the Mayflower site was prepared by a demolition company and submitted to Sefton Council.   Page 6 of this Method Statement under Section 5 “Tasks covered within this method statement” acknowledges the existence of licensed asbestos contaminated materials on site.  How can you have a method statement when a refurbishment/demolition asbestos survey has not been undertaken and the full extent of contamination in and on the buildings and on the site itself has yet to be determined?   The full extent of contamination was not determined until August 2017 with the submission of a revised Phase II Ground Investigation Report.  

A Phase I Preliminary Investigation (1st contaminated land condition) had accompanied the original Planning Application but this was considered to be insufficient by Sefton Council’s contaminated land officer and a number of concerns highlighted that needed to be addressed.  One concern was the proposal to undertake site investigation while the site was still operational which obviously restricted access for site investigation works.

7th February 2017-  the developers submitted a notice of intended demolition to Sefton Council naming the demolition contractor  and the intended date of demolition as 1st March 2017.  No notice was given to effected residents.  See notice of intended demolition.

2nd March 2017 - Sefton Council issued a counter-demolition notice of intended demolition.  This sets out rigorous procedures to be followed under Section 81 of the Building Act where demolition is concerned and also removal of asbestos from buildings prior to demolition under The Control of Asbestos Regulations. We quote from the document “Asbestos has been used in all sorts of places and you cannot assume the buildings are free of it.”  And “Prior to demolition you have a legal obligation to ensure that all the buildings involved are free from asbestos containing materials.”  A refurbishment/demolition asbestos survey had not been undertaken.  See counter-demolition notice of intended demolition.

This document was supposedly copied to affected residents in Abbots Close, Lovelady Grove, Royal Crescent, Alt Road, Gable Mews and Liverpool Road, Formby.   Checks have revealed that residents most certainly did not receive copies.

Why did Sefton Council issue a counter-demolition notice without a refurbishment/demolition asbestos survey and when there were historic surveys still to be undertaken and contaminated land conditions had not been discharged? 

Where is the UKAS clearance certificate to say that the buildings are clear of asbestos before being demolished?

 

Illegal Waste Site Formby

 Retrospective Planning Applications DC/2020/0098 and DC/2020/02197 This site (in the green belt and on a flood plain) had been heavily pr...