Wednesday, 12 August 2020

Former Daverick Motors

 Former Daverick Motors Site, Lydiate - Planning Applications S/2009/1083 and S/2013/1076.

This was a contaminated site which was intended for housing and one plot at the centre of the site is still to be developed.  Under the Environmental Protection Act in 2010 pre-commencement of development contaminated land conditions had been placed on the development (under application S/2009/1083).  These conditions are imposed on contaminated sites to protect workers, existing and future residents and the general public from exposure to contamination. The first 3 contaminated land conditions are pre-commencement of development (including demolition and site clearance). 

These contaminated land conditions are phased and have to be satisfied in order prior to progressing to the next in the sequence (preparation and agreement of Phase I report – Preliminary Investigation (contaminated land condition 1), Phase II report – testing and analysis (contaminated land condition 2) and Phase III report – submission of a Remediation Strategy (contaminated land condition 3).

When these 3 contaminated land conditions are discharged, remediation only (safe removal of contamination from site) can take place. 

Page 73 of Sefton Council's Contaminated Land Inspection Strategy states (click here to view) "the Council recognises the importance of making decisions about contaminated land matters that are accepted by the community and are both defensible and transparent".  We are saying Sefton Council officers are not following this strategy or any legal requirements imposed on Sefton Council Officers, the Developers and the site itself.

In January 2013 when our account begins the developers had still not submitted a revised Phase I report to discharge the first contaminated land condition.  A Phase I report had accompanied the planning application in 2009 but this had been rejected by Sefton Council officers because it didn’t correspond with Sefton Council’s evaluation of the site (click here to see internal memo dated December 2009).

A revised Phase II report dated February 2014 identified asbestos as well as concentrations of arsenic, lead, mercury, benzo(a)pyrene, ideno(123-cd)pyrene and dibenzo(ah)anthracene  as exceeding  their respective GAC/SGV and therefore a potential human health risk.  

Diagram of Contaminants Found On Site

We are saying the findings of this report show what contamination existed on site as at February 2014 but are not an accurate account of what contamination was originally on site.  Photographs at various dates in 2013 and early 2014, before testing and analysis took place, show groundwork being unlawfully undertaken.  Contaminated soil was moved around the site and taken off  the site and soil brought on to site to doctor it. 

Before pre-commencement of development contaminated land conditions were discharged on 2nd September 2014 which would only allow remedial work to take place on the former Daverick Motors site, Sefton Council and HSE had already allowed  the following unlawful activities (how could the developers comply with the instructions given in this decision notice when they had already breached all the contaminated land conditions) See Decision Notice of 2nd of September 2014:- 

Unlawful demolition - buildings bulldozed down by a hydraulic machine with grabbers, spreading contaminated dust/building debris everywhere

1640  kgs  (over 1½ tonnes) of asbestos was allowed to be  unlawfully removed from site,

Contaminated building debris moved around the site, 

Contaminated soil removed from site unlawfully and soil imported on to site to doctor it. 

48 loads of hazardous waste unlawfully removed from site and taken to unknown destinations (see copy consignment notes in our possession dated 22nd May to 3rd July 2014). NOTE: consignment note 12165 dated the 22nd of May 2014 covering 8 loads states at the bottom of the note "no asbestos".  These 8 Loads were in fact taken from the asbestos slop located at testing point WS2.



A house built and the foundations laid for a second house. 

The first photograph taken in April 2014 shows a concrete delivery for the foundations for the first house and proved that the foundations for this first house had already been excavated with the contamination still in the ground, exposing workers undertaking this unlawful work to contamination as well as a community.  Part IIA of the Environmental Protection Act stipulates that contamination must be removed before any development takes place. Who checked the foundations and approved their construction? 

How could Sefton Council sign off contaminated land conditions to permit remediation to commence when they had allowed unlawful remediation to take place and for houses to be constructed in contravention of Part IIA of the Environmental Protection Act?   Every time soil was excavated over a number of years, the general public was put at risk of contamination.  Sefton Council had already allowed unlawful demolition and then covered up with retrospective demolition documentation and were now issuing retrospective documentation once again, this time for Part IIA contaminated land conditions.

On 29th January 2013 buildings which residents knew contained asbestos and other harmful contaminants (having read a report which accompanied the Planning application in 2009) were being bulldozed down by a hydraulic machine with grabbers and contaminated dust and building debris was going everywhere.   To avoid drawing attention to what was going on the developers had deliberately not displayed asbestos and demolition signs.   Residents complained to both Sefton Council and HSE about exposure to contamination (see complaint to HSE).

No-one should have been working on this contaminated site and Sefton Council and HSE officers were well aware that the developers had not complied with any pre-commencement legal requirements imposed on them. 

Upon receiving our complaint, HSE would have discovered the developers had not submitted a Form F10 (Notice of a Construction Project) under the Construction Design and Management Regulations (CDM) which is a legal requirement prior to demolition being undertaken.  This F10 Form was not submitted until May 2014 (we have a copy in our possession).

If demolition were to be allowed, this is the demolition procedure which must be followed before buildings are demolished.  (In this case demolition could not be allowed because the pre-commencement of development contaminated land conditions had not been discharged.) Under Section 80 of the Building Act 1984, the developers must give notice of intended demolition to the council, together with documentation to determine what contamination exists within and on the buildings and how the contamination is to be disposed of (submission of a contamination/asbestos survey and a method statement).  A UKAS Clearance Certificate  is then required to prove that the buildings are clear of contamination and safe to demolish.  The council has up to 6 weeks to assess the situation and, if they are satisfied that demolition can be undertaken safely, issue their counter-demolition notice of intended demolition under Section 81.  Under the Act residents and statutory bodies must also be notified.

On 29th January 2013 no notice of intended demolition and accompanying documentation had been produced by the developers for Sefton Council.  Both Part IIA and demolition procedures involve risk assessments and testing and analysis before any work is allowed.  None of these legal requirements had taken place.

This was an emergency.  Residents were being exposed to contamination, including asbestos.  They had complained to both Sefton Council and HSE officers and had expected them to take the appropriate action to protect the community.

Developers were working on site unlawfully, smashing down buildings containing asbestos and other contaminants.  Unknown to residents, the owner of the demolition company had been investigated in 2005 by the Environment Agency and the BBC, following complaints from nearby residents who had observed over a period of time his company using tractors to dump 44,000 cu metres of hazardous waste containing white, brown and blue asbestos on a nature reserve in Scarisbrick, Lancashire (http://news.bbc.co.uk/1/hi/magazine/4457663.stm).

In 2005 this hazardous material would have originated from a number of contaminated sites similar to the Daverick Motors site and should have been disposed of safely at considerable cost to landfill.  This man was operating a very lucrative business by selling on contaminated soil for landscaping purposes.  In 2005 he should have been prevented from operating with hazardous material ever again.

Now in 2013 residents living near the Daverick Motors site had caught him again undertaking unlawful demolition on a contaminated site without following any legal procedures as above but these residents were unaware of his past history

HSE purposely did not react to our serious complaint, allowing the developers to start, progress and complete unlawful demolition.  We have since discovered this is the way HSE behave when residents make serious complaints about exposure to contamination, having experience now of dealings with HSE on other contaminated sites.

HSE would have known that an asbestos survey and method statement had not been submitted to Sefton Council for the council to determine that demolition could be undertaken safely.  They would also have known that they had not received a HSE F10 form (notification of a construction project) which is a legal requirement when demolition is involved. 

Sefton Council officer logs obtained in 2016 reveal that after receiving our complaint, a contaminated land officer contacted a team leader in another department (Environmental Protection) to deal with the complaint.  He advised them that the site had permission for a residential development and that a desk study report they had reviewed in 2009 identified asbestos in the insulation and roofing materials.  He must have known no work should have been taking place because this was the report to discharge the first contaminated land condition which his team had rejected.  He also commented that he could not find a record of an asbestos survey on the council’s systems (Flare and the planning portal.)   (The developers had failed to comply with any legal requirements so there could not possibly be any documents) click here to see links to logs.

The Environmental Protection team leader then gave the following instructions to her colleagues:-  “Could anyone bob out to this site today to check if they have all the correct paperwork for the demolition if there is asbestos present on site and that procedures are in place etc.  If you can’t make it I’ll see if I can go tomorrow.  Can you let me know if you can make it today.”

One officer went out and was on to site for only 3 minutes as evidenced by a CCTV camera.  The logs show that the officer spoke to a sub-contractor who advised that as far as he knows all the asbestos material had already been removed prior to his company getting there to dismantle the building.  The officer also commented that no asbestos material was visible on site.

What is this all about when the contaminated land officer had already given his colleagues sufficient information to stop the site by advising there was no documentation in Sefton Council’s possession?

There was obviously no intention of stopping this unlawful demolition.  Sefton Council officers were not only covering up for the developers they were also covering up for themselves and what they had allowed to take place.

Unlawful demolition continued for a further 3 days until all the buildings were down.

On 1st February 2013, after they had allowed the buildings to be completely unlawfully demolished and when they were fully aware that there was no legal documentation in place such as an asbestos survey and method statement, Sefton Council’s building control department issued their counter demolition notice of intended demolition to the developers only withholding notice (which is a legal requirement) from affected residents.  Residents did not discover the existence of this intended demolition document until November 2014 (*see later in account). Click to view Counter Demolition Notice.

How can a council allow an individual who has a history of dumping hazard waste to operate unlawfully on a contaminated site in the first place and, when residents complain about exposure to contamination, give him a green light to continue his unlawful operations?

We now have a copy consignment note dated 6th February 2013 showing 1640 Kgs (over 1½ tonnes) of asbestos removed from the Daverick Motors site and taken to Skelmersdale  landfill.  How do Sefton Council officers account for such a large quantity of asbestos removed from site when on 29th January the officer who attended site said there was no asbestos visible and took the word of an operative working unlawfully on site that asbestos had already been removed?  How was this asbestos identified when no testing or analysis had taken place (no asbestos survey had been produced)? Click to view consignment note.

When residents had not received any feedback to their complaint from either Sefton  Council or HSE officers, the main garage building had been demolished and groundwork was continuing on site, residents involved their councillor who was assured by Sefton Council officers that there were no planning or building control issues.  This was completely untrue.  There were very serious contamination issues and breaches of statutory legislation by the developers and Sefton Council involving Sefton Council’s planning, environmental protection and building control departments (again refer to logs 29th Jan to 5th March).

A Councillor was involved and was asking questions on behalf of residents.  Involvement of a third party i.e. HSE could assist in deceiving residents and their Councillor into believing everything was in order.  Sefton Council officer logs reveal that a Sefton Council officer telephoned HSE on 15th February 2013 to ask if HSE were in receipt of any information concerning safe removal of asbestos. (Note: These documents should have been in Sefton Council’s possession prior to demolition i.e. prior to 29th January 2013 for the Council to assess that demolition could be undertaken safely, together with the developers’ notice of intended demolition.) 

Sefton Council officers were advised to complete an enquiry form online.  HSE then emailed Sefton Council on 5th March advising that unfortunately HSE could not send Sefton Council the documents but that HSE had requested and were in receipt of a pre-demolition survey, method statement, building control’s acknowledgement of demolition letter and a hazardous waste consignment notice dated 6th February 2013.  Sefton Council and HSE officers were using these documents to cover up for the unlawful demolition.

This email was forwarded to the councillor to show to affected residents who believed what they were being told by HSE and that everything was in order.  They did not pursue the matter any further.

The cover-up continued with fabricated planning documents and reports stating “seeks demolition” and “following demolition” implying that demolition was yet to happen when it had already occurred.

It was not until the end of November 2014 that residents discovered the existence of a four page counter-demolition notice of intended demolition dated 1st February 2013 and  issued to the developers only (see above in the account).  

Affected residents and statutory bodies were named in the Council’s notice of intended demolition.  FOI requests have failed to produce statutory body copies and residents have never received or seen this document.  It was impossible now to circulate this intended demolition document for affected residents and statutory bodies to have an input into safety after the buildings had been allowed to be unlawfully demolished.  For this reason circulation was withheld from both statutory bodies and affected residents.

Residents realised that they had been deceived.  These documents had been issued after the buildings had already been demolished and Sefton Council and HSE had allowed developers to contaminate residents for a further 3 days after their complaint but residents still did not realise the full extent of that deception and that residents had been exposed to contamination over a number of years until they received FOI information from Sefton Council in 2016.  Sefton Council had allowed unlawful work to continue on a contaminated site at the expense of  the health and safety of nearby residents and also the general public.

On 2nd December 2014 we made a formal complaint to the Chief Executive of Sefton Council, supported by a petition from nearby residents.  We were complaining about exposure to asbestos and other harmful contaminants and Sefton Council’s failure to circulate their letter of intended demolition to affected residents and statutory bodies.  Residents were still unaware that this contaminated site came under Part IIA of the Environmental Protection Act.

On 9th December 2014 the Director of Built Environment at Sefton Council at that time replied to our formal complaint.  We now know this letter is a complete fabrication of what happened on 29th January 2013 and subsequently.  We attach copy of this letter and also copy of the Sefton Council officer logs for 29th January  2013 and after.  The accounts differ significantly (see the anomalies between the letter and logs).   Why would a Chief Executive of a council deceive residents over their health and safety? 

The developers and Sefton Council had not complied with the legal requirements imposed on them and on this contaminated site.  What was taking place was unlawful and residents were being contaminated.  Once again residents were being deceived.  There is no mention of Part IIA contaminated land conditions.  The letter implies that HSE were contacted immediately.  We know from Sefton Council officer logs that Sefton Council did not contact HSE until 15th February 2013 and again on 5th March 2013 requesting documents which should have been in Sefton Council’s possession for them to assess that safe demolition could be undertaken (see earlier in our account).

In June 2014 a Sefton Council Planning Monitoring Officer visited the site and expressed concerns that the buildings had gone and a house had been built when a remediation strategy had not been agreed but this Sefton Council officer did not stop unlawful work on site (see Sefton Council officer logs).

In July 2014 a HSE inspector visited the site when house construction was underway. This is the same HSE inspector involved with many of the other sites in this blog.   Why was a HSE inspector now out on site?  This was some 18 months after HSE had failed to react to residents' complaints about exposure to contamination on 29th January 2013 and when HSE knew there was no documentation in place under the HSE Construction Design and Management Regulations (CDM).

The inspector issued a contravention notice for various health and safety contraventions:-

Failure to provide suitable and sufficient welfare facilities

Failure to plan, manage and monitor the construction phase of the project including

insufficient escape routes from the scaffolding::  fire protection and detection measures not built into the structure along the way:  perimeter of the site not complete where it backed on to the adjoining property resulting in an insecure site

As the building in progress is of timber frame construction, the above failures should be addressed as a priority as operatives on site and members of the public are potentially at risk from the spread of fire on and off the site.

The competent person in charge of the site does not hold the appropriate qualifications. (see Inspector’s Report dated 9th July 2014).

HSE had allowed unlawful work to take place on this contaminated site for over 18 months ie since 29th of January 2013 when residents first complained to them and they did not attend the site.  Now a HSE inspector who had a legal duty to protect workers on site and a community from exposure to contamination was allowing unlawful work to continue on this contaminated site further exposing workers on site, residents and the general public to contamination.  The Inspector completely ignored the fact that no work at all should have been taking place because the pre-commencement of development contaminated land conditions had still not been discharged and any development (including excavation for house foundations and removal of hazardous waste from site) was unlawful.  On the day of the Inspector's visit four loads of hazardous waste were being unlawfully removed from site.  Unlawful house building and unlawful removal of hazardous waste were taking place at the same time and a community and workers on site were being exposed to contamination.  Sefton Council and HSE Officers were allowing an individual with the history of dumping hazardous waste and developers who were not complying with their legal requirements to continue operating unlawfully on a contaminated site to the detriment of the health and safety of workers on site and a community.  

Photographs taken in 2016 and 2017 show asbestos taped up and bundled and moved to various locations on the site.  This was uncovered when excavating for foundations for the northern part of the site  ie plots 6,7,8 and 9. Why is contamination still being found onsite ie asbestos when houses have already been constructed?


This site is surrounded by housing with 2 Primary Schools nearby.  A lollipop lady is positioned adjacent to the corner of the site to cross children and their parents over this busy main road.  There is a bus stop and bus lay-by opposite the site.  All these people have been exposed to contamination with unlawful work being allowed to take place over a number of years by Sefton Council and HSE Officers.

Our experience with this site is not an isolated incident.  One resident gathering evidence for the former Mayflower industrial site which is currently being developed has died recently from cancer and another resident whose house backed on to this site has contracted cancer.

This prompted us to undertake a preliminary survey of our own area surrounding the former Daverick Motors site with alarming results of clusters of cancer and respiratory problems which you would not expect in a rural area and the effects of exposure to asbestos have yet to take their toll.  The young children could, in their late teens or early adult life, develop mesothelioma or lung problems due to asbestos exposure.  Residents and the general public have been contaminated and treated like third world citizens in the whole process.   The number of people who have been potentially contaminated is immense.  All these people have been exposed to contamination with unlawful work being allowed to take place over a number of years by Sefton Council and HSE Officers. See survey of cancer and respiratory illnesses within the adjacent community.  

A wider public could be affected with hazardous waste unlawfully removed from site by the same individual who was responsible for the unlawful demolition.  These corrupt practices have been continuing from 2005 and earlier and will continue until those involved are brought to justice.

What we have uncovered should not be happening in the 21st century.  We expect our national government and the press to expose these environmental crimes to protect the public.  It is their duty to do so when presented with compelling evidence.

Developers, Sefton Council and HSE will be held responsible for the deaths of residents and the general public who have been exposed unnecessarily to contamination.  Laws are imposed on contaminated sites to protect the public.  Public bodies have a duty to enforce these laws and not cover-up what has actually happened.

By ignoring these environmental crimes and allowing them to continue, more and more people will lose their lives.

Sunday, 9 August 2020

Moorhey Road

 2a Moorhey Road, Maghull – Planning Application S/2011/1419 (Land adj to 2 Moorhey Road, Maghull)

At the end of 2017 residents in the vicinity of Moorhey Road were experiencing blocked drains.  During the course of investigations, United Utilities identified defects (collapse) on the public sewer in the vicinity of 2a Moorhey Road.   2a Moorhey Road (a recently constructed property built around 2013) had subsided and damaged the sewerage system for the area.   

The road was closed and dug up.  Temporary pumping facilities were installed and the residents of 2a Moorhey Road had to be moved out to temporary accommodation while their house was repaired and the drainage system re-routed. 

Our investigations have revealed that 2a Moorhey Road had been constructed over a main sewer pipe which crossed this small parcel of land diagonally to a sewerage pumping station adjacent to the property.   The land on which 2a Moorhey Road  had been constructed also provided direct access to Melling Brook (classed as a main river) and Old Alt Brook.

Plot 2a Moorhey Road (Google Street View)

After Construction


This small plot of land had been owned by United Utilities who sold it off around 2011/12.   This strategically important land should never have been allowed to be sold off  and built on.  Building regulations stipulate that drains cannot be built over.  The land should have remained in public ownership and left open to provide direct access to the main sewerage drain for the area and also direct access to the river for maintenance purposes.

The new owner then applied for planning permission to erect a detached property and the planning application form states that the applicant sought pre-application advice from Sefton Council’s Planning Department.  Sefton Council knew that a pumping station was on the land and maps of the area clearly showed the layout of the sewerage pipework   For this reason, United Utilities and Sefton Council’s own drainage department should have been consulted and the applicant advised that they could not build over main sewerage drains. 

Sefton Council's Drainage Map

We know that the Environment Agency was consulted over access to Melling Brook and Old Alt Brook and had voiced their objections and we quote from the Sefton Council planning officer’s report to planning committee on 8th February 2012:-

“The Environment Agency is also concerned that the proposal will restrict their access to watercourses in the area.  This issue is not considered to be a planning consideration which can affect the decision on this application and the Environment Agency should pursue this matter with the applicant and/or with surrounding landowners.  The Environment Agency has been advised of the situation and given the opportunity to provide further comment.  They have since raised no further comments in this respect.” 

However their previous comments were not withdrawn and their objection still stood.  There is no record of either United Utilities or Sefton Council’s own drainage department being consulted (click here to see Officer's Report).

The application was validated by Sefton Council’s planning department and put out to public consultation.  In their objections nearby residents stated this was an unsuitable location adjacent to a pumping station and expressed concerns about lack of access to the main drainage pipe.  Residents also asked how would the Environment Agency access the brook?  

It is now apparent that Sefton Council’s planning department was determined to force this application through.  They had recommended it for approval and had stated in an officer’s report to the planning committee that residents’ concerns regarding possible lack of access to the drainage system were not planning considerations which can affect the decision made on this application.  Planning committee members were also not given the benefit of a site visit to assess the situation at first hand.  The planning application was subsequently approved on 8th February 2012   In view of the above, the planning application should not even have been considered and it most certainly should not have been given approval.  There were officers and experienced Councillors present at the planning committee meeting who were aware of all the implications involved in approving this application.  Why didn't someone speak up and query what was happening.

In 2013 the land was advertised as a cleared site offered with the benefit of full planning permission to erect a 4 bedroomed detached property and was sold off  in auction, with the owners making a considerable profit on the transaction (Click here to see Auction Advert).

Who has eventually picked up the bill for putting right what should never have been allowed in the first place and which has been covered up?   What is the total cost for stabilising 2a Moorhey Road to prevent it sinking further, providing temporary accommodation for the residents of 2a Moorhey Road, settling their claim and any other claims from affected residents and any other legal costs, closure of Moorhey Road for 12 months and siting a temporary pumping station in Moorhey Road, cost of investigating, excavating road and re-routing pipework,  making good the road and resurfacing etc?

Those involved should be made accountable for what has happened.  What could be seen as favours for friends has definitely spiraled out of control.  One question which remains unanswered is why wasn’t 2a Moorhey Road demolished and the owners re-housed?  This would have been the cheapest option and would have given direct access to maintenance of the main sewerage drain for the area and also direct access to the river.

An investigation is called for into the conduct of United Utilities and Sefton Council officers.

Monday, 13 July 2020

Saville Road Lydiate

  • Pre-commencement of development contaminated land conditions had been imposed on the development in August 2019 under the Environmental Protection Act to protect workers on site and residents from exposure to contamination.  None of these contaminated land conditions had been discharged.
  • No development, including demolition and site clearance, could take place until the contamination, including asbestos, had been assessed and the contamination had been removed (remediated).  Section 55 of the Town and Country Planning Act defines demolition as development. 

  • It is the responsibility of developers to begin the process of discharging these contaminated land conditions through the planning system.   This is a lengthy and expensive process involving employing consultants to prepare reports identifying contamination and how that contamination is to be dealt with and suitably qualified contractors to remove contamination safely and dispose of that contamination legally.  These reports must be submitted to the council for their agreement and then discharged in sequence by way of planning applications.

  • The contaminated land conditions did not allow demolition but if demolition were to be allowed there is a legal process to be followed under the Building Act 1984, Section 80 (developers) and Section 81 (the council).  (See demolition procedures required by Sefton Council and HSE.)   The developers have a legal duty to undertake a pre-demolition asbestos survey (see HSE demolition requirements).  A pre-demolition asbestos survey had not been undertaken on 31st January and had still not been undertaken on 20th February (when a second HSE inspector visited the site and identified various contraventions) and yet the buildings had been allowed by Sefton Council and HSE officers to be unlawfully demolished with the asbestos in situ.

  • On Thursday, 30th January 2020, residents had observed a young man on site removing the doors from the buildings and taking out some of the contents – fires, boilers, boiler parts, various flue parts, baths. Insulation material, plastic tanks, metal and plastic drums some of which were made of asbestos and some of which contained asbestos material and other contaminants which had not been identified. This is what the second HSE Inspector alleged was fly-tipped waste.

  • On Friday, 31st January 2020 unlawful demolition commenced.  Residents observed the  same young man smashing down with a sledgehammer  the asbestos roofs and the fabric of the buildings simultaneously which is unlawful.   


    (click image to enlarge)
  • Contamination must be removed safely and legally before demolition can be contemplated.  Pieces of asbestos were flying off the roofs and going everywhere.   Residents and their councillors complained immediately to Sefton Council and HSE officers because residents and the general public were being exposed to contamination and residents were fearful for their safety and for the safety of their children.
  • The developers had not attempted to discharge the pre-commencement of development contaminated land conditions.  They had not undertaken a pre-demolition asbestos survey and method statement  and had not submitted a notice of intended demolition as required under Section 80 of the Building Act.  They had also failed to register the site with HSE (Form F10) under the Construction Design and Management Regulations which is a legal requirement.

  • The young man was working on site unsupervised and not wearing clothing to protect him from contamination, including a mask.  His clothing was covered in asbestos/demolition dust.  There was no scaffolding, no welfare facilities, no water on site to dampen down, and there were no demolition or asbestos signs in place, all of which are legal requirements.   

  • When residents and their Councillor questioned this young man he told them he was employed by a Recruitment Agency.    He was unaware that asbestos was involved and said he had been told that it was only cement.  He was being exploited and exposed to contamination as well as exposing residents to contamination.  He was unqualified and inexperienced in this type of work and should never have been put into such a dangerous situation.   Residents and their Councillor told him what he was doing was unlawful.  He was contaminating himself as well as residents. When he realised the full implications of his actions, he left the site immediately, locking the site gates behind him.  

  • The developers alleged on Monday, 3rd February 2020 that “gypsies” had taken over the site and were responsible for the site’s dangerous condition.  They were using this fabricated story of gypsies/travellers to avoid investigation and prosecution.  We have photographs of this young man and witnesses to disprove this story of gypsies/travellers.  We have also made a FOI enquiry to Merseyside Police who confirm  they have conducted an incident search on Saville Road and there is no reference of travellers in their logs.  This information has been given to HSE, together with contact details of one of the witnesses but to date HSE have failed to make contact with witnesses or ask for their photographs and statements.   Instead of investigating and pursuing the guilty parties, HSE are purposely dismissing residents’ claims.

  • On 31st January 2020 about one-third of the buildings were down and the site was littered with asbestos debris and building rubbish, such as blocks and bricks mixed with the contents of the buildings which had been removed the previous day.  The remaining buildings were structurally dangerous. A straightforward process of removing contamination before demolishing the buildings through the legal process had become an environmental catastrophe which a Sefton Council Officer had warned against in a report to planning committee in August 2019 if asbestos was not dealt with correctly. Suitably qualified contractors who had experience of handling such a serious contamination incident should have been brought in.  Developers had chosen the cheapest and most dangerous way to demolish the building without following any legislation imposed on them and in so doing have exposed a community and a young man to life threatening contamination.

  • Upon receiving complaints, it was the legal duty of Sefton Council and HSE officers to react immediately.  Unlawful demolition should have been halted and the site made safe to protect residents and the general public.   If Sefton Council and HSE officers  had visited the site on 31st January 2020 in working hours they would have witnessed  first -hand  the exploitation of this young man and the appalling dangerous condition of the site and would have had to investigate what they had seen.  Instead of taking control of the situation, Sefton Council Officers redirected complainants to HSE and advised Sefton Council's Building Control would be issuing a retrospective demolition notice and a Building Control Officer would be visiting the site on the following Monday. By not reacting to residents’ complaints and not enforcing legislation imposed on Sefton Council and HSE officers, these public servants have become complicit in contravening legislation and exposing a community to contamination.

  • We have an email dated 5th February 2020 from HSE who had not been in contact with complainants and were now refusing to comply with their legal responsibilities and  passing us back to Sefton Council who had directed us to HSE on 31st January 2020.  This is contrary to a letter dated 4th March 2020 where HSE allege one of their inspectors visited the site very late on the Friday afternoon when the site was locked up.  He was able to see that demolition work had taken place and was concerned about the structural stability of the remaining buildings but he did not attempt to stop the site or contact complainants for their statements or their photographs.

  • On Monday, 3rd February 2020 residents contacted their councillors again because unlawful work had resumed on site with two different men.   Sefton Council officers had not come out on to site to answer the residents' serious complaint about exposure to contamination. High winds over the weekend  had aggravated the situation still further, with building debris including asbestos being blown everywhere contaminating a wider area.  Fibres had also been released into the air when the asbestos debris had been broken up.  These fibres were too small to see with the naked eye but are lethal if inhaled.  Residents were being further contaminated and the site was now in a very dangerous condition and needed to be made safe.   About one-third of the buildings had been smashed down with the asbestos still in situ and the remaining buildings were structurally dangerous with pieces of asbestos roofing hanging off the roofs (this is confirmed in a letter from HSE' dated 4th March 2020 which alleges one of  their Inspector's visited the site on 31st January when he could see that demolition had taken place and was concerned about the structural stability of the remaining buildings. The Inspector must have visited the site after the young man had locked the gate because the Inspector commented that the site was secure ).  Why didn't the HSE Inspector take enforcement action?

  • The ward councillor telephoned Sefton Council’s planning department and a planning enforcement officer.  When it was apparent that no-one from Sefton Council would be coming out, the ward councillor also telephoned the Police.  The Police arrived at the same time as Sefton Council’s planning enforcement officer.  He had obviously been forced to come out because the ward councillor had contacted the Police.  Between Friday and Monday the developers had concocted a story about gypsies/travellers and the 2 workmen on site were now alleging that they were only tidying up after “gypsies” had occupied the site.   The planning enforcement officer was going along with this fabricated story and ignoring residents' and councillors' pleas to stop the site and make it safe.  He also alleged that there were no powers under planning legislation which can enforce against the unauthorised removal of asbestos from buildings. He was misleading everyone present, including the Police.  The site was in a very dangerous condition and needed to be made safe and residents were being exposed to contamination.  This was more than unauthorised removal of asbestos, it was deliberate unlawful demolition with the asbestos roofs and the fabric of the buildings being smashed down simultaneously.  He was also stating the pre-commencement of development contaminated land conditions only covered below-ground contamination when contaminated land conditions prevented any development including demolition and site clearance from being undertaken until contamination had been identified and removed. 
  • The planning enforcement officer knew there was no legal documentation i.e. a pre-demolition  asbestos survey, a method statement, an intended demolition notice to permit lawful demolition and that the pre-commencement of development contaminated land conditions had not been discharged but he did not stop the site and make it safe.   He allowed the site to continue with the same developers and in the same manner with the asbestos roofs and the fabric of the buildings being smashed down simultaneously.  Residents were being exposed to contamination.  The site needed to be made safe.  Everything onsite was now contaminated and suitably qualified specialists should have been brought in who could handle such an environmental catastrophe.  At this stage it was irrelevant who was responsible for the damage.  An investigation would have revealed who was responsible but this never took place.

  • These photographs taken on the 3rd and 10th February 2020 show that the buildings have been smashed down with the asbestos still on the building.  The photograph of 3rd February 2020 shows contaminative material inside the garage building ie old boilers, old fires asbestos flues etc.  Note the close proximity to residents rear gardens and children's play areas.

  • On 6th February 2020, Sefton Council’s building control department issued their retrospective notice of intended demolition without a pre-demolition asbestos survey or a method statement, which are legal requirements for the developers to submit to the council prior to demolition (see information sheet from Sefton Council included with notice of intended demolition) for the council to establish that can demolition can be undertaken safely.  By now approximately half the buildings were down and the remaining buildings were still being knocked down unlawfully with the asbestos and other contaminants still in and on them in a reckless dangerous manner.  Residents’ photographs prove that further unlawful work had continued from 3rd February 2020 onwards. 

  • How could a local authority who had a legal duty to protect residents from unlawful work issue a retrospective document, giving developers a green light to continue their reckless dangerous behaviour? This was a contaminated site and none of the pre-commencement of development contaminated land conditions under Part IIA of the Environmental Protection Act had been discharged to permit any development to take place.  Section 55 of the Town and Country Planning Act defines “demolition” as “development”.
  • Unlawful work continued on site in the same reckless dangerous manner with the asbestos roofs and the fabric of the buildings being smashed down simultaneously and with the same developers involved until all the buildings were down.   A pre-demolition asbestos survey had still not been undertaken.   Blocks and bricks were being thrown on top of the asbestos debris further damaging and crushing it.  There were still no welfare facilities and no means of dampening down, no scaffolding, no asbestos or demolition signs in place.  The workmen were observed going into the local shops and a cafĂ© wearing their work clothes covered in demolition/asbestos dust which they would be taking home with them, contaminating a much wider community.

  • Residents and their councillors continued to complain to the Chief Executives of both Sefton Council and HSE but requests to stop the site and make it safe were ignored.   On 5th February 2020, 8 cross party councillors submitted a written complaint to HSE’s Chief Executive.  Complainants were being passed backwards and forwards between HSE and Sefton Council.   These are stalling tactics to allow unlawful demolition /development to continue.

  • We have a letter dated 4th March 2020 from HSE in reply to our complaint to the Chief Executive.  We attach a copy of residents' reply.


    (photo showing asbestos hanging off the roof  9th of Feb and was still there on 10th click image to enlarge)
  • HSE allege one of their officers visited the site on a number of occasions but his visits were after normal working hours and he failed to make contact with any of the complainants.  Around 10th February 2020 he met one of the developers on site.  The Inspector found there had been no demolition asbestos survey and there were issues with the way the clean-up work had taken place.  We presume the Inspector is referring to the asbestos debris littered all over the site which residents' photographs confirm. He also established that there was no welfare on site.

  • The Inspector had witnessed the progress of this unlawful work on various dates from 31st January 2020 onwards.  By now three-quarters of the buildings were down.  The other quarter of the buildings still had asbestos on them and he had said the structures were dangerous.  The site was littered with the contents of the buildings and building debris (including asbestos).  He had now established there was no pre-demolition asbestos survey and must have known there was no CDM in place which is a legal requirement.   Why was he allowing unlawful demolition to continue, not stopping the site and making it safe when residents and the general public were being contaminated?

  • Also on 10th February and again on 11th February 2020 a Sefton Council Environmental Enforcement Officer visited the site and attached is a copy of his report to our MP (click to see report) which contains many comments which are untrue and conflicts with residents’ photographs taken on a daily basis and the HSE Inspector’s observations.   This is an officer employed to protect residents and enforce the laws imposed on this site.  He was actually condoning the developers’ unlawful activities and enabling them to continue contaminating a community.    
  • Around this time the site was in its worst condition.  Three-quarters of the buildings had already been smashed down with the asbestos still on them and the officer could see that the remaining quarter were structurally dangerous with unsupported pieces of asbestos debris hanging down from the roofs.  The site was littered with asbestos debris mixed with blocks and bricks and the contents of the garages.


  • (click image to enlarge)
  • The officer was misleading the MP and residents and implying that correct procedures were being undertaken.  He was well aware but had failed to mention that none of the pre-commencement of development contaminated land conditions imposed on the site under Part IIA of the Environmental Protection Act had been discharged.  No development/demolition could take place until all contamination, including asbestos, had been assessed and removed safely and legally.  This is an officer employed to protect residents and enforce the laws imposed on this site.  He was actually condoning the developers’ unlawful activities and enabling them to continue contaminating a community   He was protecting Sefton Council and himself from prosecution and misleading the MP and residents.  This officer has a history of misleading residents who complain about being exposed to contamination.  He says Sefton Council officers have contacted HSE but they can’t guarantee HSE will visit the site,   We now know that a HSE officer had already visited the site and was concerned about the structural stability of the buildings.  He had also spoken with a Sefton Council building control officer and informed him that HSE would be taking a lead in terms of any potential asbestos contamination   
       
  • The environmental enforcement officer also says his department was not sure if asbestos was involved which again was untrue.  Sefton Council officers were well aware that asbestos was present.  The Environmental Health Manager from this officer’s own department in his comments to planning committee in August 2019 had stressed that appropriate investigation and mitigation was required including an asbestos survey to ensure no ground contamination occurs during the demolition process.

  • We have had a report undertaken by asbestos specialists which confirms the presence of asbestos and also details all the contraventions of the Control of Asbestos Regulations on this site.   Why did the Enforcement Officer  allow unlawful demolition to proceed in view of the appalling dangerous condition of the site? Click here for Liverpool Echo article 19th of Feb.

  • From 31st January 2020 Sefton Council and HSE officers had been responsible for allowing unlawful demolition to proceed in a very dangerous manner and for residents to be exposed to contamination for 10 days.  Now this officer was allowing unlawful demolition to continue without any assessments of contamination in or on the garage buildings and without any documentation in place, including a pre-demolition asbestos survey and for a community to be contaminated.  He was also well aware that no work should have been taking place because none of the contaminated land conditions under Part IIA of the Environmental Protection Act had been discharged.  Throughout this time residents and their councillors were continually asking Sefton Council and HSE Chief Executives to stop the site and make it safe because residents were being exposed to contamination and were fearful for their lives and the lives of their children.
  • A photograph taken on 16th of February 2020 after several visits from Sefton Council Officers and a HSE Officer shows damaged split asbestos debris on site which will have released many fibres too small to be seen by the naked eye.  These fibres are lethal if inhaled.  Why was a full asbestos roofing sheet (of which there were many on site) allowed to be so badly damaged on this contaminated site?



  • It was not until 20th February 2020  (10 days after the first Inspector’s visit) when the remaining buildings had all been demolished with the asbestos in situ, that a second HSE Inspector visited the site. HSE allege the first inspector was not available! The second Inspector reviewed all the concerns and the proposed enforcement actions. This Inspector had given the developers time to complete unlawful demolition and remove some of the contaminated material from site in skips.  On 20th February 2020 residents' photographs show the site in an appalling condition and this Inspector would have seen this.  Contaminated rubbish was still strewn over the site mixed with building rubbish, including blocks and bricks and a considerable amount of asbestos debris in various sizes mixed amongst this rubbish.  Wrapped and taped asbestos lay on the ground, too big and too heavy to be loaded into the skip.  A later video dated 17th March 2020 shows how this asbestos was man-handled into the skips.  The Inspector ignored the dangerous condition of the site with asbestos strewn everywhere.

  • This second Inspector had already reviewed the first Inspector's report and confirmed that there was no pre-demolition asbestos survey and the developers had not complied with the Construction Design and Management Regulations.  The Inspector served an Improvement Notice for an asbestos assessment and a plan of work for the remaining clearance work and a Notice of Contravention for compliance with the Construction Design and Management Regulations.  The developer agreed to stop work until he had carried out an asbestos survey.

  • Immediately after the site visit the HSE Inspector rang one of the ward councillors to advise that the site was being stopped but the inspector was allowing the developers to remove blocks and bricks from site.  Residents photographs and a video prove these blocks and bricks contaminated with asbestos debris and the contaminative contents of the garage buildings were picked up in an open truck with grabbers parked in Saville Road (a public road).  As the grabbers swung backwards and forwards over the site fencing to pick up the contaminated material and then drop it into the open truck contaminated dust was being created from their actions. Bits of building material and asbestos debris were falling from the grabbers into Saville Road.  This was happening repeatedly over a period of time. 

  • The developers had been allowed over a 3 week period to start, progress and complete unlawful demolition and now a HSE inspector was allowing these same developers who had created this dangerous situation to clear this contaminated site and continue working.  What exactly was the Inspector stopping?  The Inspector had not issued an official stop notice which would result in prosecution proceedings and had not brought in specialists to assess the contamination before any workers were allowed to clear this contaminated site.  Meanwhile a community was being further exposed to contamination. There was obviously no intention of issuing an official stop notice to protect the community and taking prosecution proceedings when the inspector was allowing developers to clear the contaminated evidence from site.  Residents health and safety was being sacrificed so that the cover-up could continue.  The site still remained in a dangerous condition after the 20th of February 2020 because HSE were determined to continue the cover-up. 

  • From 20th February 2020 onwards the developers continued to remove building debris and asbestos from site with the full knowledge of both HSE and Sefton Council.  Residents’ photographs taken on 23rd February 2020 show asbestos not bagged and littered over the site which the second HSE inspector had overlooked.  There is also a black bag full of pieces of corrugated asbestos sheeting from the roofs and other asbestos roofing parts.

  • On 24th March 2020 the ward councillor received an email from the second HSE inspector asking “which of your constituents I should contact for details of the young man allegedly smashing the asbestos, including his employer details and copies of the documents which confirm the presence of asbestos in the guttering fascia and ridge of the garages.”

  • Details were supplied to the Inspector but to date no contact has been made with the resident concerned for his evidence and photographs.

  • If HSE had undertaken a thorough investigation, as is expected of a national safety body, this information would already be in their possession and residents exposure to asbestos would have been limited to 31st January 2020.  This site still has not been made safe.

  • A young couple with 3 young children living adjacent to the site have sought advice from their doctor’s practice and the incident has been recorded on the doctor’s records.   When asbestos is broken up it is very dangerous and releases fibres which cannot be seen by the naked eye.  These are the fibres which do the damage when they get into people’s lungs (click here to see HSE leaflet "Why Asbestos is Dangerous").

  • The developers had not complied with any legislation imposed on them but were allowed by HSE and Sefton Council officers over a three-week period to start, progress and complete unlawful demolition on a contaminated site in a reckless dangerous manner with asbestos still on and in the buildings after numerous complaints by residents and their councillors.  Under the Freedom of Information Act we asked on the 27th of April 2020 for HSE inspectors’ reports and all correspondence relating to this site which HSE refused to give us, saying it was not in the public interest to do so and they were still investigating the incident at Saville Road.  It is in the public interest when the public have been exposed to contamination and HSE could and should have stopped the site and prosecuted those involved when they had a legal duty to do so. 

  • We challenged this decision to withhold the FOI information and HSE then undertook an internal review which has been going on since May 2020 and we have still not received the outcome of this review or more importantly all the information requested, despite numerous prompts to HSE on 6th and 29th July 2020 and again on 12th October 2020.  See FOI request and complaint correspondence to HSE.

  • We contacted the Information Commissioner (ICO) on 9th November 2020 in an attempt to obtain this information.  On 30th November 2020 the Information Commissioner wrote to HSE giving them a deadline of 10 working days to respond to us with the outcome of the internal review.  In a letter to us on 30th November 2020 ICO state that they have now closed the case.  On 17th December 2020 we asked ICO to keep the case open and seek all the information we have requested.  Why did ICO close the case when HSE had not responded to the deadline given by ICO?  ICO replied to us on 17th December 2020 that there is a waiting time of approximately 4 months for our case to be allocated to a case officer.  In June 2021 (6 months later) an ICO case officer made contact with us and re-opened the case.  We were advised it would be late July 2021 before ICO were able to progress our complaint further.  Why is it taking so long for ICO to insist HSE provide us with information to which residents and councillors have a right?

  • We understand HSE now allege they have undertaken an investigation into the incident at Saville Road which was concluded in August 2020.  They say a prosecution report was submitted but was not approved as the evidence secured was not sufficient to meet the evidential test required by the Code for Crown Prosecutors.  There is multitude of evidence that these developers have not complied with any legislation imposed on them, namely the Health and Safety at Work Act, The Control of Asbestos Regulations, demolition procedures under the Building Act, Part IIA of the Environmental Protection Act, HSE Construction Design and Management Regulations.  Residents also commissioned a report undertaken by asbestos consultants which details the many contraventions of The Control of Asbestos Regulations.  These environmental crimes carry heavy fines and/or imprisonment but these developers were confident that they would not face prosecution.  Residents also have many photographs which show the progress of this unlawful demolition from 31st January 2020 until its conclusion, with asbestos debris littered all over the site.  How can HSE conduct an investigation when they have not contacted any of the witnesses (residents and councillors) for their statements and photographic evidence which would condemn not only the developers but also Sefton Council and HSE officers?  We have even contacted HSE offering to provide such evidence to them but HSE, as an investigative body, have not come back to us.

  • On the 9th of August 2021 we recieved a letter from HSE enclosing some of the information we requested, but the Inspector's Reports and the report into the internal review are being purposely withheld without any justification. We have contacted ICO once again asking them to obtain all information requested which is in the public interest and to which we have a legal right.

  • We are being sent around in circles once more.  We know HSE are unable to give us the various reports and information requested because this information will also condemn them  but expect ICO to insist HSE provide us with information we have a right to access.  No-one is above the laws of our land yet HSE have allowed developers to continue working unlawfully on a contaminated site and thereby exposing workers on site and a community to contamination.  After receiving numerous complaints from residents and their councillors, HSE could and should have stopped this site at any time.  It was their legal duty to do so.  HSE officers are public servants employed to protect communities and they should be accountable and transparent.

  • HSE have already forced us through  their complaints procedure without providing us with relevant information to which we have a right under the Freedom of Information Act.  They are now trying to force us to the Ombudsman.  See this link which shows the public's perception of the Ombudsman.  This issue needs to be taken out of HSE’s hands and dealt with by an independent impartial safety body.   People’s lives are involved here and these unlawful practices must be stopped.  The culprits are HSE and Sefton Council officers as well as the developers.  This is beyond the scope of the Ombudsman.

  • One of our Councillors has also asked Sefton Council for copies of full reports relating to the various site visits undertaken by their officers.   To date we have only received edited extracts of what Sefton Council officers want us to see.

  • We are asking for an independent body to conduct an investigation into the conduct of Sefton Council officers and HSE inspectors.


Listen to Radio Merseyside Saville Road:

Reasons why this site should have been stopped on 31st January 2020

Residents were being exposed to asbestos and other unidentified contaminants and the developers had failed to comply with:-

Environmental Protection Act 1990 – Pre-commencement of development contaminated land conditions under the Environmental Protection Act 1990 imposed on the development in August 2019 to protect workers on site and residents from exposure to contamination.  It is the responsibility of the developers to discharge these contaminated land conditions through the planning process and Sefton Council, as the regulators, to enforce these contaminated land conditions.

Demolition procedures under the Building Act 1984 (Section 80 – developers and Section 81 – Sefton Council)

Health and Safety at work Act 1984

Control of Asbestos Regulations 2012

Regulation 5 – Identification of the presence of asbestos

Regulation 6 – Assessment of work which exposes employees to asbestos

Regulation 7 – Plans of work

Regulation 11 – Prevention or reduction of exposure to asbestos

Regulation 14 – Provision and cleaning of protective clothing

Regulation 16 – Duty to prevent or reduce the spread of asbestos

Regulation 18 – Designated areas

Regulation 24 – Storage, distribution and labelling of raw asbestos and asbestos waste

Regulation 27 – Labelling of products containing asbestos

HSE Construction Design and Management Regulations (CDM) – A project must be registered with HSE before demolition/development commences.  The project manager will be responsible for planning, managing, monitoring and co-ordinating health and safety issues in the pre-construction phase (i.e. before demolition starts).

Gallery of Photos Showing the Condition of the Site at the Time of HSE Site Visit and After.


Illegal Waste Site Formby

 Retrospective Planning Applications DC/2020/0098 and DC/2020/02197 This site (in the green belt and on a flood plain) had been heavily pr...